• Title/Summary/Keyword: Project Selection Procedure

Search Result 38, Processing Time 0.029 seconds

National R&D planning for information and telecommunication technologies (정보통신분야 국책연구개발과제 도출체계)

  • 이병남;이성덕;이효은;이용복
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.94-97
    • /
    • 1997
  • The purpose of this paper is to publish IITA's R&D planning and selection procedures for review by outside panels and by industry. The paper illustrates the detailed procedure and criteria used at each phase of evaluation process to the results of National Survey for Information and Telecommunication Technology Needs. Total 293 project ideas come from industry, government-supported research institutes, and universities. Candidate projects are not evaluated on the basis of what technology is proposed, but on how sound the proposed idea is within that technology and on the potential economic impact. In addition, an industrial assessment of the project ideas was performed as part of an evaluation process. At a final stage, 90 projects are selected.

  • PDF

Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects (토목공사 수주현황 분석을 통한 턴키${\cdot}$대안입찰제도의 문제점 및 개선방안 연구)

  • Lee Yang-Kyoo;Kang Leen-Seok;Park Jong-Hyuk;Jeon Seong-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.5
    • /
    • pp.460-469
    • /
    • 2005
  • Turnkey contract system is an effective ordering system for the ordering organizations that technical engineers are insufficient for their construction projects. It is possible to reduce project duration and to improve project quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system including railway projects. The result includes various methods for improving the system based on the analysis of bid price and selection procedure.

Design method of computer-generated controller for linear time-periodic systems

  • Jo, Jang-Hyen
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10b
    • /
    • pp.225-228
    • /
    • 1992
  • The purpose of this project is the presentation of new method for selection of a scalar control of linear time-periodic system. The approach has been proposed by Radziszewski and Zaleski [4] and utilizes the quadratic form of Lyapunov function. The system under consideration is assigned either in closed-loop state or in modal variables as in Calico, Wiesel [1]. The case of scalar control is considered, the gain matrix being assumed to be at worst periodic with the system period T, each element being represented by a Fourier series. As the optimal gain matrix we consider the matrix ensuring the minimum value of the larger real part of the two Poincare exponents of the system. The method, based on two-step optimization procedure, allows to find the approximate optimal gain matrix. At present state of art determination of the gain matrix for this case has been done by systematic numerical search procedure, at each step of which the Floquet solution must be found.

  • PDF

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF

Construction of "CIDEAR" Model for Selecting and Evaluating Cross Impact R & D Projects (상호영향형 R&D과제군의 평가산정을 위한 "CIDEAR" 모형의 개발)

  • Kwon Cheol Shin;Park Joon Ho;Hong Seok Ki
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.29 no.3
    • /
    • pp.41-61
    • /
    • 2004
  • The purpose of this paper is to construct $\ulcorner$CIDEAR(Cross Impact-DEA-AR)$\lrcorner$ model which evaluates proposed R&D projects considering cross impact among them and selects proper projects to utilize resources efficiently as well as to maximize efficacy of investments. For this purpose, $\ulcorner$CIDEAR$\lrcorner$ model is designed as the following six steps. $\ulcorner$Decision Theory Evaluation Model$\lrcorner$ is for setting and selecting the evaluation items according to the structured procedure of evaluation system. The priority of items is decided at $\ulcorner$AR Decision Model$\lrcorner$$\ulcorner$Cross Impact Estimation Model$\lrcorner$ is for computing the final probability of success and the result is used to revise the evaluation results of $\ulcorner$Decision Theory Evaluation Model$\lrcorner$. $\ulcorner$Resource Performance Analysis Model$\lrcorner$ classifies the proposed R&D projects on the basis of required resources and expected performance. Consequently, the possibility of bias of project selection can be prevented. $\ulcorner$Priority Oder Decision Model$\lrcorner$ is for computing the efficacy of proposed projects. Finally, $\ulcorner$Efficacy-Efficiency Cause Analysis Model$\lrcorner$ analyzes the structure of efficacy and efficiency of the projects. The major findings and significances of this study are summarized as follows: (1) $\ulcorner$CIDEAR$\lrcorner$ model can deal with the affairs of R&D projects having the characteristics of mutual independence as well as mutual dependence in the point of efficacy and efficiency. Hence, it is possible to evaluate and select R&D projects more accurately. (2) It can be possible to raise the possibility of projects success. R&D manager can use the information for project management because the efficacy-efficiency structure of selected projects can be analyzed. (3) We proved the usefulness of the constructed $\ulcorner$CIDEAR$\lrcorner$ model using an case about twenty-one R&D projects of a leading company of electronic industry in Korea.

Design Value Analysis and LCC Analysis Model of Water Supply System Project (수도시설의 설계VA 및 LCC 분석모델)

  • Lim Jong-Kwon;Jung Pyung-Ki;Seo Jong-Won;Lee Jae-Sun;Cho Kook-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.469-472
    • /
    • 2003
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a life cycle cost analysis model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

  • PDF

A Study on the Design Value Analysis Model Using Probabilistic LCC Analysis of Water Supply System Project (확률적 LCC분석기법을 활용한 수도시설물의 설계VA모델에 관한 연구)

  • Jung Pyung-Ki;Seo Jong-Won;Lim Jong-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.181-193
    • /
    • 2004
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a probabilistic life cycle cost analysis (PLCCA) model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented probabilistic life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

A Study on Major Differences between Urban Regeneration Projects' Execution Methods and Future Policy Improvements Propositions - Centering around a Comparative Analysis of the Seoul Metropolitan City-MOLIT Urban Regeneration Project Execution Cases - (도시재생사업 추진방식의 차이점과 정책적 개선방안 - 서울시와 국토부 도시재생사업 사례를 중심으로 -)

  • Park, Sung-Won;Ham, Kwang-Min
    • Journal of Environmental Science International
    • /
    • v.31 no.9
    • /
    • pp.743-755
    • /
    • 2022
  • This study aims to review the differences in urban regeneration independently implemented by the government (Ministry of Land, Infrastructure, and Transport, MOLIT) and Seoul based on related laws and ordinances, and to draw out the implications of Korean urban regeneration's directions. The results are as follows. First, Seoul has constantly responded to the revision of the Urban Regeneration Act by adjusting and specifying the contents of ordinances, and especially, there have been efforts to enhance regional characteristics suitably for the circumstances of Seoul. Second, in the urban regeneration of Seoul, the budgets including the matching ratio of national and local subsidies shall be changed according to the standards of the MOLIT in changing designating places after the selection of the urban regeneration by the ministry, and this procedure and these implementation methods cause confusion to Seoul and local governments. Third, there were differences in the results of comparing the budgets and support methods of the "Gaggum Housing Project" of Seoul and "New Deal Housing Repair Project" of the MOLIT, which caused conflicts due to the differences in the project implementation and support standards, and the arbitrary interpretation of the guidelines. Although the urban regeneration greatly contributed to the revelation and conservation of regional characteristics, it might be necessary to establish systems that can enhance citizens' awareness and compensate the efficient contents needed for each region in the future.

Improvement of NIMBY Facilities Route Planning Considering Social Conflict (사회적 갈등을 고려한 비선호시설 노선 선정 개선 연구)

  • Choi, Younguk;Lee, Changjun;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.3
    • /
    • pp.487-496
    • /
    • 2018
  • In route selection process of NIMBY facilities, many conflicts occur due to route selection procedure and NIMBY syndrome. Especially, the social conflicts surrounding the site selection and operation are frequent enough to account for 70% of the total conflict cases, causing significant losses. To resolve the conflict in route selection, social conflicts are considered. Therefore, this study proposes an improved process of selecting route considering social conflicts in the power transmission line. First, the analysis of previous research trends and interviews with experts revealed the improved exclusion zone criteria, the factors and priorities of NIMBY facilities. After selecting the candidate routes, the optimal route is selected by using Fuzzy-TOPSIS. Hence, 83.3% of six experts have verified that this model minimizes conflicts and has sufficient applicability. The proposed model is expected to be used as a tool to minimize social conflict in the selection process of the power transmission line in the early stage of the project.

A GIS-Based Method for Route-Alignment in Transportation Infrastructure Projects (GIS를 활용한 교통시설사업의 노선선정 방법 연구)

  • 양광식
    • Spatial Information Research
    • /
    • v.8 no.1
    • /
    • pp.117-130
    • /
    • 2000
  • This paper presents a GIS-based method of spatial analysis that can be applied to the line determination in traffic infrastructure project . It is based on the spatial analysis of the sensitivity or suitability of areas relating to the integration of new infrastructure routes, carefully considering the requirement of intervention optimizing . It makes the comparison of alternatives and a final selection of a"best route " easier, offers new possibilities and simplifies and accelerates the whole process of line determination. The developed method for route-alignment is tried out by an example project for road planing in Germany. It point out that during the line determination all aspects can be equivalently and adequately evaluated. So this method is well suited as a new tool within a line determination procedure and can bring enormous advantages in the planning process of traffic infrastructure projects. projects.

  • PDF