The purpose of this paper is to publish IITA's R&D planning and selection procedures for review by outside panels and by industry. The paper illustrates the detailed procedure and criteria used at each phase of evaluation process to the results of National Survey for Information and Telecommunication Technology Needs. Total 293 project ideas come from industry, government-supported research institutes, and universities. Candidate projects are not evaluated on the basis of what technology is proposed, but on how sound the proposed idea is within that technology and on the potential economic impact. In addition, an industrial assessment of the project ideas was performed as part of an evaluation process. At a final stage, 90 projects are selected.
Turnkey contract system is an effective ordering system for the ordering organizations that technical engineers are insufficient for their construction projects. It is possible to reduce project duration and to improve project quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system including railway projects. The result includes various methods for improving the system based on the analysis of bid price and selection procedure.
The purpose of this project is the presentation of new method for selection of a scalar control of linear time-periodic system. The approach has been proposed by Radziszewski and Zaleski [4] and utilizes the quadratic form of Lyapunov function. The system under consideration is assigned either in closed-loop state or in modal variables as in Calico, Wiesel [1]. The case of scalar control is considered, the gain matrix being assumed to be at worst periodic with the system period T, each element being represented by a Fourier series. As the optimal gain matrix we consider the matrix ensuring the minimum value of the larger real part of the two Poincare exponents of the system. The method, based on two-step optimization procedure, allows to find the approximate optimal gain matrix. At present state of art determination of the gain matrix for this case has been done by systematic numerical search procedure, at each step of which the Floquet solution must be found.
설계$\cdot$시공일괄입찰제도는 기술인력이 부족한 발주자를 대신해서 건설사업을 효율적으로 수행할 수 있는 제도로서 공사기간의 단축이 가능하고, 건설공사의 품질향상, 설계와 시공의 통합에 의한 기술력제고 효과를 기대할 수 있으나, 상대적으로 계약자 측면에서는 책임 일원화에 따른 어려움이 발생되고 있다. 본 연구는 국내에서 운영되고 있는 설계$\cdot$시공일괄입찰제도 발주현황과 낙찰률 현황, 공종별 시행규모, 발주처별 시행규모, 심의방식 등을 분석하여 동 제도의 문제점을 구체적으로 분석하고자 하며, 기본적인 제도의 개선방안을 제시한다.
The purpose of this paper is to construct $\ulcorner$CIDEAR(Cross Impact-DEA-AR)$\lrcorner$ model which evaluates proposed R&D projects considering cross impact among them and selects proper projects to utilize resources efficiently as well as to maximize efficacy of investments. For this purpose, $\ulcorner$CIDEAR$\lrcorner$ model is designed as the following six steps. $\ulcorner$Decision Theory Evaluation Model$\lrcorner$ is for setting and selecting the evaluation items according to the structured procedure of evaluation system. The priority of items is decided at $\ulcorner$AR Decision Model$\lrcorner$$\ulcorner$Cross Impact Estimation Model$\lrcorner$ is for computing the final probability of success and the result is used to revise the evaluation results of $\ulcorner$Decision Theory Evaluation Model$\lrcorner$. $\ulcorner$Resource Performance Analysis Model$\lrcorner$ classifies the proposed R&D projects on the basis of required resources and expected performance. Consequently, the possibility of bias of project selection can be prevented. $\ulcorner$Priority Oder Decision Model$\lrcorner$ is for computing the efficacy of proposed projects. Finally, $\ulcorner$Efficacy-Efficiency Cause Analysis Model$\lrcorner$ analyzes the structure of efficacy and efficiency of the projects. The major findings and significances of this study are summarized as follows: (1) $\ulcorner$CIDEAR$\lrcorner$ model can deal with the affairs of R&D projects having the characteristics of mutual independence as well as mutual dependence in the point of efficacy and efficiency. Hence, it is possible to evaluate and select R&D projects more accurately. (2) It can be possible to raise the possibility of projects success. R&D manager can use the information for project management because the efficacy-efficiency structure of selected projects can be analyzed. (3) We proved the usefulness of the constructed $\ulcorner$CIDEAR$\lrcorner$ model using an case about twenty-one R&D projects of a leading company of electronic industry in Korea.
수도건설사업은 공용이후단계에서 소요되는 운영${\cdot}$유지관리비용 중에서 기계설비 및 관로시설이 대부분을 차지하는 대표적인 플랜트시설로 구성되므로 일반적인 토목시설물의 LCC모델과 차별화되어야 할 것이다. 따라서 본 연구에서는 수도건설사업에 적합하도록 비용분류구조를 제시하고 이에 따라 수도시설 LCC분석 모델을 개발하였다. 설계VE 활동시 기초가 되는 설계VA의 절차를 실무활용도 측면을 고려하여 개선된 설계VA절차를 제시하였다. 제시된 설계VA 절차와 LCC분석모델을 사용하여 실제 건설사업의 설계VE활동에 있어 송수관로의 적정 선형 선정에 적용하였다. 제안된 수도건설사업의 설계VA모델은 향후 수도건설사업의 경제적${\cdot}$가치혁신적 대안선정과 유지관리비 예산 추정 및 적정예산 배정에 매우 유용하게 활용될 수 있을 것이다.
수도건설사업은 공용이후단계에서 소요되는 $운영\cdot유지관리비용$ 중에서 기계설비 및 관로시설이 대부분을 차지하는 대표적인 플랜트시설로 구성되므로 일반적인 토목시설물의 LCC모델과 차별화 되어야 할 것이다. 따라서 본 연구에서는 수도건설사업에 적합하도록 비용분류체계를 제시하고, 이에 따라 수도시설의 확률적 LCC분석 모델을 개발하였다. 또한, 설계VE 활동시 기초가 되는 설계VA의 절차를 실무활용도 측면을 고려하여 개선된 설계VA절차를 제시하였다. 제시된 설계VA절차와 확률적 LCC분석모델을 사용하여 실제 건설사업의 설계VE활동에 있어 송수관로의 적정 선형 선정에 적용하였다. 제안된 수도건설사업의 설계VA 및 확률적 LCC분석모델은 향후 수도건설사업의 $경제적\cdot가치혁신적$ 대안선정과 유지관리비 예산추정 및 적정예산 배정에 매우 유용하게 활용될 수 있을 것이다.
This study aims to review the differences in urban regeneration independently implemented by the government (Ministry of Land, Infrastructure, and Transport, MOLIT) and Seoul based on related laws and ordinances, and to draw out the implications of Korean urban regeneration's directions. The results are as follows. First, Seoul has constantly responded to the revision of the Urban Regeneration Act by adjusting and specifying the contents of ordinances, and especially, there have been efforts to enhance regional characteristics suitably for the circumstances of Seoul. Second, in the urban regeneration of Seoul, the budgets including the matching ratio of national and local subsidies shall be changed according to the standards of the MOLIT in changing designating places after the selection of the urban regeneration by the ministry, and this procedure and these implementation methods cause confusion to Seoul and local governments. Third, there were differences in the results of comparing the budgets and support methods of the "Gaggum Housing Project" of Seoul and "New Deal Housing Repair Project" of the MOLIT, which caused conflicts due to the differences in the project implementation and support standards, and the arbitrary interpretation of the guidelines. Although the urban regeneration greatly contributed to the revelation and conservation of regional characteristics, it might be necessary to establish systems that can enhance citizens' awareness and compensate the efficient contents needed for each region in the future.
비선호시설의 노선선정 과정에서는 노선선정 절차, 지역주민의 NIMBY 현상 등으로 인해 많은 갈등이 발생하고 있다. 특히 입지선정과 운영을 둘러싼 사회적 갈등은 전체 갈등 사례 중 70%를 차지할 정도로 자주 발생하고 있으며, 갈등으로 인해 많은 손실을 야기하고 있다. 지속적인 갈등 해결을 위해서는 사회적 갈등을 고려한 최적 노선선정이 이루어져야 한다. 이에 본 연구는 송전선로 시설을 대상으로 사회적 갈등을 고려하여 개선된 경과지 선정 프로세스를 제시하고자 한다. 우선 기존 사회적 갈등에 관한 연구동향 분석 및 전문가 인터뷰를 통해 비선호시설의 개선된 배제구역 기준 및 고려인자와 우선순위를 도출하였다. 이후 도출된 배제구역 기준 및 고려인자를 실제 밀양시 사례를 대상으로 후보 노선을 선정하였으며, Fuzzy-TOPSIS를 활용하여 최적 노선을 선정하였다. 실무 측면에서 83.3%가 본 프로세스에 있어 사회적 갈등을 최소화하며 적용에 대한 타당성을 검증하였다. 본 연구에서 제시하고 있는 프로세스는 사업 초기 송전선로 경과지 선정과정에서 사회적 갈등을 최소화하기 위한 도구로써 활용이 가능할 것으로 예상된다.
본 연구는 교통시설사업의 기본계획에 지리정보시스템(GIS)을 활용한 공간분석(spatial analysis)을 이용하여 교통효율성과 환경영향, 장래 국토계획의 목표, 도시영향 그리고 건설가능성 및 경제성을 통합하여 고려할 수 있는 노선선정의 방법론을 개발하기위하여 시도되었다. 본 논문은 총 4장으로 구성되어 있으며 1 장 서론에서는 연구의 배경, 목적 그리고 연구범위와 방법을 정립하였으며, 2장에서는 교통시설사업의 노선선정 방법론의 개발을 위한 목표설정과 방법론의 수행과정을 설명하였다. 3장에서는 개발된 방법론을 독일의노이스(Neuss)와 그로벤브로히(Grenvenbroich)간의 도로건성을 위한 노선선정 프로젝트에 적용하였으며 본 방법론의 평가와 이용가능성을 결론으로 제시하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.