• 제목/요약/키워드: Project Progress Method

검색결과 177건 처리시간 0.026초

지연된 국방 연구개발 프로젝트의 일정 예측방식 개선 연구 (Research on Improving Schedule Forecasting Method for Delayed Defense Research & Development Project)

  • 조정호;임재성
    • 한국군사과학기술학회지
    • /
    • 제23권3호
    • /
    • pp.286-293
    • /
    • 2020
  • Since Dr. Lipke announces earned schedule management(ESM) in 2002, it has been used in project management to make up for the insufficient schedule management function of earned value management technique. However, it is difficult to accurately forecast the schedule of delayed defense research and development(R&D) projects with the ESM technique. Therefore, this paper proposes a new schedule forecasting method considering the progress of delayed work in ESM technique. This concept can also be adopted to the traditional project progress management (PPM) technique. We verify the effectiveness of the proposed concept through several defense R&D projects and prove that it is possible to supplement the schedule forecasting of the ESM and PPM technique.

Knowledge-Based Model for Forecasting Percentage Progress Costs

  • Kim, Sang-Yong
    • 한국건축시공학회지
    • /
    • 제12권5호
    • /
    • pp.518-527
    • /
    • 2012
  • This study uses a hybrid estimation tool for effective cost data management of building projects, and develops a realistic cost estimation model. The method makes use of newly available information as the project progresses, and project cost and percentage progress are analyzed and used as inputs for the developed system. For model development, case-based reasoning (CBR) is proposed, as it enables complex nonlinear mapping. This study also investigates analytic hierarchy process (AHP) for weight generation and applies them to a real project case. Real case studies are used to demonstrate and validate the benefits of the proposed approach. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs.

건설공사의 진도율 산정 방법에 관한 연구 (A study on progress measurement method of a construction project)

  • 박세정;김수용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.450-453
    • /
    • 2003
  • 건선 사업에 일어서 초기 계획과 기성의 주기적이고 반복적인 비교 검토는 매우 중요하다. 이를 위해서는 정확한 현장 실적자료가 제공되어야하고, 작업량을 객관적으로 계량화하는 기준 및 진행상황을 정확히 반영한 진도율 산정이 필요하다. 이러한 진도율 산정을 위해서는 전체 사업이 명확한 작업범위를 갖는 단위작업으로 분할되어, 각 단위 작업에 필요한 정보가 할당되어야 한다. 국내 건설 사업에서와 같이 내역중심의 사업관리가 이루어지고 있는 상황하에서는 각 단위작업의 물량, 공사비 둥을 포함한 비용 정보 뿐만 아니라 일정 정보를 반영한 진도율 산정 방법이 필수적이며, 본 연구에서는 두 가지 정보에 의한 가중 진도율 산정방법을 제시하고자 한다.

  • PDF

A Study on the Reasonable Service Charges for Incheon North Port(berth 3) under the Private Investment Project

  • Park, Jin-Hee
    • 한국항해항만학회지
    • /
    • 제28권7호
    • /
    • pp.601-608
    • /
    • 2004
  • Recently, port development has been actively in progress through a private investment project. Incheon North Port functions as an auxiliary port for Incheon Port to solve its chronic demurral and freight congestion and to treat materials such as wood, iron material, feed materials. Service charges is one of important factors in the port choice to treat general goods. In general, service charges can be calculated by two methods such as cost accounting method and market price method. This study will review the characteristics of the Incheon North Port (berth 3), which is under the progress of the private investment project and estimate the reasonable service charges for general goods on the basis of market price. This will help a concessionaire to maximize the operation efficiency.

GIS for Agricultural Project and Program Evaluation

  • Punyaratabandhu, Sompit
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
    • /
    • pp.38-40
    • /
    • 2003
  • Project monitoring and evaluation is very important, as it can be used to indicate progress and success, including problems and impact of the project. It can also be used for improving project plan, administration, and management. GIS is the visualization method that is extremely helpful in decision making and planning. So GIS is an appropriate tool for agricultural project and program monitoring and evaluation. There are three ways of using GIS in project undertakings i.e. GIS for feasibility studies, GIS for project and program monitoring, and GIS for project and program evaluation.

  • PDF

Evaluation System for Defense IT Project in Korea: Post-Implementation Stage

  • Lee, Sangho;Song, Chong-Hyun
    • Journal of Multimedia Information System
    • /
    • 제5권4호
    • /
    • pp.291-297
    • /
    • 2018
  • Performance measurement is not an easy task. However, it is necessary to measure the expected value of the informatization project to be invested, to help the successful progress of the informatization project, and to confirm the result of the informatization project. This study describes the evaluation systems of the defense informatization project in Korea used after the end of the informatization project (post-implementation evaluation stage). In the post-implementation evaluation stage of proposed system, the informatization project is evaluated in terms of performance achievement, project plan compliance, project management, and economic validity. For each element, this study suggests metrics and practical measurement method. With metrics and their method, it can be evaluated which project is better than others. Moreover, the lessons learned can be developed. Under scarce budget condition, defense organizations can make better performance from IT project with the evaluation system suggested in this study.

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

공정-원가 통합관리를 위한 진도관리 개선 방안 (A Study on the Improvement of Construction Progress Management for EVMS)

  • 이규현;박찬정;최인성
    • 한국건축시공학회지
    • /
    • 제2권3호
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

Project를 위주로 하는 연구개발(硏究開發) 기관에 있어서 과학자(科學者), 기술자(技術者)의 평가방법(評價方法) (An Evaluation Method for Scientists and Engineers in Project - oriented R&D Organizations)

  • 박순달
    • 대한산업공학회지
    • /
    • 제1권1호
    • /
    • pp.57-65
    • /
    • 1975
  • A perfect evaluation for scientists and engineers is impossible unless the R&D process is fully explored. But the study in this area is being intencified, and consequently progress is being made. In this paper an evaluation method for scientists and engineers in project-oriented R&D organizations is developed. That is, a method that the evaluation for the job performance directly influences personnel management such as promotion, and the evaluation for their potential, characteristics influences indirectly. Further systematization of evaluation process, which is no less importatant than evaluation itself, is attempted.

  • PDF

내역물량 측정에 의한 건설공사진도율 산정시스템 (Construction Progress Measurement System by tracking the Work-done Performance)

  • 최윤기
    • 한국건설관리학회논문집
    • /
    • 제4권3호
    • /
    • pp.137-145
    • /
    • 2003
  • 건설공사관리체계는 실적자료를 바탕으로 운영되어야 하며, 공사실적을 정확하게 파악하기 위해서는 합리적인 건설공사진도 율 측정기준 및 그에 따른 진도 율 산정방법이 필요하다. 본 연구에서는 건설공사관리체계 구축에 필수적인 건설공사진도율 산정시스템 개발 및 그 시스템의 합리적인 운용 방안을 제시하였다. 그 방법으로서 분할된 단위작업들은 공사 진행에 따라 집행된 내역물량을 기준으로, 상위레벨의 작업범위에 대하여는 실행기성(earned value)을 바탕으로 건설공사의 진도 율을 산정 할 수 있는 시스템(construction progress measurement system; CPMS)을 제시하였다 일반 PC의 Window환경에서 제공되는 프로그래밍 인터페이스(interface) 기능인 ODBC(Open DataBase Connectivity)는 상이한 프로그램간의 데이터 교환을 통해 정보공유를 가능케 하고 있다 본 연구에서 제시하는 건설공사진도 율 산정 시스템은 ODBC를 통해, 상용 일정관리프로그램을 활용해서 생성된 데이터를 그대로 이용하고, 시스템 내에서 생성된 데이터는 일정관리프로그램에 갱신(update)된 정보로 제공된다. 제안된 건설공사진도 율 측정시스템의 실용화를 촉진시키기 위해서는 진도 율 측정에 의한 수치 값을 분석하여 향후 공사의 전망 등을 예측할 수 있어야 하는데 이에 대한 연구가 필요하다.