• Title/Summary/Keyword: Project Process

Search Result 4,110, Processing Time 0.033 seconds

A Case Study of a Six Sigma Project for Improving Gate Painting Quality (게이트 도장 품질 개선을 위한 6시그마 프로젝트 사례 연구)

  • Hong, Sung-Hoon;Choi, Ik-Jun
    • Journal of Korean Society for Quality Management
    • /
    • v.34 no.1
    • /
    • pp.1-12
    • /
    • 2006
  • This paper presents a six sigma project for improving gate painting quality in a medium-sized automotive part company. The project follows a disciplined process of five macro phases: Define, Measure, Analyze, Improve, and Control. A CTQ(critical to quality) is determined based on COPQ(cost of poor quality) analysis, and a process map is utilized for identifying process input variables. Three KPIV s(key process input variable) are selected; Painting Temperature, Painting Quantity, and Painting Viscosity, and DOE(design of experiments) is utilized for finding the optimal process conditions for three KPIVs. MINITAB software is used for data analyses and DOE. The sigma level of defects rate has improved from 2.93 to 3.66.

Application of the Analytic Hierarchy Process (AHP) on the National Nuclear R&D Projects (원자력연구개발사업의 사후평가를 위한 계층화 분석법(AHP)의 적용)

  • 곽승준;유승훈;신철오
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2001.05a
    • /
    • pp.369-385
    • /
    • 2001
  • A R&D project evaluation method has been applied for the national nuclear R&D projects in a developing-country setting. In the methodology, Saaty's analytic hierarchy process model is used to evaluate and rank of the selected nuclear R&D project which have a wide range of objectives and characteristics. The criteria used for evaluation related specifically to the Korea's evaluation needs and culture, and they are weighted according to their relative importance as perceived by the evaluator of the R&D project. As a real-world case of evaluation, we elicited and reproduced the evaluation process of the nuclear R&D projects which is going under the research process. As the results of the paper suggests, the methodology can be applied to the evaluation of the R&D projects and has much potential.

  • PDF

Verification of the Entire Process Model through Green Remodeling Pilot Project (그린리모델링 실증 시범사업을 통한 프로세스의 전 과정에 대한 검토)

  • Jeong, Jin-Woo;Ju, Jung-Hoon;Lee, Keon-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.3
    • /
    • pp.37-45
    • /
    • 2018
  • The purpose of this study is to review all phases of the pilot project through the implementation of the Green Remodeling process. The Green Remodeling process was developed to facilitate anyone's ease of use. The Green Remodeling process consists of five phases : project, plan, design, construction, operation and maintenance. Each stage simulation was performed and the energy saving was predicted. Architects can easily obtain energy information of a building. In this study, we propose a green remodeling proposal plan through pilot project. Ultimately, the spread of green remodeling will greatly contribute to achieving the goal of reducing greenhouse gas emissions.

USING PROCESS MAPPING IN CONSTRUCTION PROCESS TO REDUCE CHANGE ORDERS

  • Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.616-621
    • /
    • 2009
  • Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.

  • PDF

Practice and Limitations of the Environment Improvement Project in the Delinquent Residential Areas for Promoting Mental Health - Focusing on the Area of Saeddeul Maeul Project in Donghae City - (정신건강증진을 위한 노후 불량주거지역 환경개선사업의 실천과 한계 - 동해시 새뜰마을 사업 지역을 중심으로 -)

  • Lee, Sang-Soo;Park, Hoon
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.21 no.3
    • /
    • pp.49-60
    • /
    • 2019
  • This study is on the practice and limitation of the environment improvement project in the delinquent residential areas implemented as part of the urban restoration project that this study was carried out with the subject of the Saeddeul Village Project in Balhan Dongmunsan District of Donghae City that is implemented as part of resident-participating urban rehabilitation that has emerged as a socially important issue. In particular, at a time the issues of increasing senior population and poverty resulted thereof have surfaced in the society that this study has taken a look at the characteristics in the planning and practice process in the Saeddeul Village Project area for the purpose of improving the mental health. In the planning process and practice process, those human-care project and resident competency strengthening projects, together with physical environment improvement, are implemented, and the contents implemented by respective project are purported to establish the community identity through voluntary participation of local residents together with the environment improvement of the villages on the basis of resident participation as well as leading the economic independence by the village with its own discretion. However, the limitations in the practice process and exposure of problems that may be experienced in the field have made difficulties in such approach and provokes the difficulties of project performance depending on the conflicts in community constituents. Under such a relationship, it is required to have the endeavors to facilitate the community and solution of issued, and this study presents the need of access for revitalizing the regional welfare system.

Technical Management Processes for Large National R&D Projects : Focused on Pyro Project (대형 국가 R&D 프로젝트의 기술관리 프로세스 : 파이로 프로젝트를 중심으로)

  • Kim, Jeong-Guk;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.34-41
    • /
    • 2017
  • The Pyro project, one of the large national R&D project to construct Korea Advanced Pyroprocessing Facility (KAPF), which has many goals such as development of pyro technology and process equipment, design of equipment and facility, construction, and test operation, is now under research and development. To reduce uncertainty and risk of such complex project, the technical management processes in systems engineering standards and NASA handbook were reviewed, and then the ten common technical management processes were selected for the large national R&D project to meet its goal successfully. And the essential technical management processes were finally suggested for Pyro project in consideration of current situation of the project.

Design and implementation of a project management system capable of process management by Activity using PERT/CPM (PERT/CPM을 이용한 Activity에 대한 연결 공정관리가 가능한 프로젝트 관리 시스템의 설계 및 구현)

  • Park, Sun-Yi;Park, Hee-Sook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.5
    • /
    • pp.802-807
    • /
    • 2022
  • In projects where mufti-project management is required and processes for production activities are repeated and linked, it is very difficult to input processes for activity repeatedly or analyze loads by process in a method of managing processes step by step. In this paper, based on the definition of activity and project process, the connection process can be automatically created for activity, schedule and resource management for each process, schedule and resource plan can be established for each detailed process, and load analysis can be provided in real time. It presents a project management system that can significantly improve the time and cost of project progress management, predict various problems that may occur during the project, and effectively allocate the necessary amount of resources in the right place.

A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project (형상관리기법을 활용한 대형 프로젝트 정보화 전략개발)

  • Won, Seo Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Evaluation on the Relationship between Software Engineering Level and Schedule Deviation in Software Development (SW 공학수준과 SW 프로젝트 납기성과와의 관계)

  • Kim, Seung-Gweon;Ko, Byung-Sun
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.191-204
    • /
    • 2011
  • Recently, many software companies are trying to improve the software quality and project outcome with more costs and efforts in development time. In the software convergence and integration environments, it is required efforts to gain high quality of software. In other words, it is required to utilize software engineering knowledge and technology for higher software quality and better software project productivity. The Software development productivity can be varied by software process capability according to building a framework for software development, selection and use of appropriate technology, human resource management. Software process capability will influence software project outcome which is the general opinion. This study provides empirical evidence about software engineering efforts and investment approach to lead software project performance. We measured the software engineering efforts by SW engineering level and analyzed the corelation between software engineering level and schedule deviation. And, we verified that this performance is affected by the size of software company. As a result, software process capability is important to build a infrastructure and develop systematically software project. The higher software engineering level can lead to improved software project performance.