• Title/Summary/Keyword: Project Process

Search Result 4,110, Processing Time 0.027 seconds

Algorithm selecting Software development route suitable for Project environment and characteristics (프로젝트 환경과 특성에 따른 소프트웨어 개발 경로 선정 알고리즘)

  • Jung Byung-Kwon;Yoon Seok-Min
    • The KIPS Transactions:PartD
    • /
    • v.13D no.1 s.104
    • /
    • pp.87-96
    • /
    • 2006
  • This paper focused on the method for customizing software development path, considering the project environments and characteristics. he selection standard of development path is composed of ten items, based on the process of ISO/IEC TR 15721 Information Technology Guide for ISO/IEC 12207 (Software Life Cycle Process) and ISO/IEC 15504 Information technology - Process assessment. The ten items were reflected the project environments and characteristics, at the same time the items conduct the adjustment item of selecting project development path. An algorithm for selecting software development path through items of the project environments and characteristics is presented. To test the algerian in this paper, a system for selecting development path, which reflected algorithm was developed. The development project for web-based system were also adopted to the system for selecting development path. In addition, provened hand-worked project path process differed from machine-worked project path process. The reason why it differs is that outputs were mixed or their names were changed. The effect is to select easily software development route suitable for project environment and characteristics.

Collaboration Management Architecture of construction process for Decision Support based on PLM (Project Life-cycle Management) (PLM 기반의 건설프로세스 의사결정을 위한 협업관리체계 개발)

  • Lim, Hyoung-Chul;Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Lee, Kwang-Myung;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.165-169
    • /
    • 2007
  • In order to develop VirtuAlmighty system, CPDM (construction project data management) and CPLM (construction project lifecycle management) model must be settled beforehand. Because most of information systems based on 3D-Design have its own database and business process. So, our team will develop collaboration management architecture of construction process for Decision Support based on PLM (Project Life-cycle Management). This architecture with business processes and Database can be used in process develop, process monitoring with many stakeholders of project, process change management, and so on.

  • PDF

Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects (프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로)

  • Sullim Jung;Dae-Cheol Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..

Communication-Centered Project Management for Requirements Definition Phase

  • Ishii, Nobuaki;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.39-47
    • /
    • 2012
  • Requirements definition, which determines a project baseline, has a strong impact on the success of a project. However, since in-depth requirements are gradually revealed through the requirements definition process, the requirements definition is not a straight forward process and often falls into disorder. Thus project management standpoints are critical for the success of the requirements definition. In this paper, we present a framework and mechanisms of communication-centered project management, which controls the requirements definition process based on the situation of communication-oriented activities among stakeholders. In addition, we present a communication-centered project plan with a planning method. The project plan, which represents a time schedule of requirements definition activities, is made by a simulation-optimization algorithm using a stakeholder matrix showing the relations of requirements domains and relevant stakeholders. The effectiveness and the significance of communication-centered project management at the requirements definition phase are demonstrated by numerical examples.

Analysis for the Policy Making Process of G7 Project in 1990s (선도기술개발사업(G7)의 정책결정 과정 분석: 범부처간 추진 과정 및 민간 전문가 역할을 중심으로)

  • Lee, Chan-Gu
    • Journal of Technology Innovation
    • /
    • v.16 no.2
    • /
    • pp.167-200
    • /
    • 2008
  • This work firstly aims to analyse how the policy makers had been able to sort out the two policy issues, 'how did the MOST establish the inter-departmental project' and 'why did the MOST give a legal power to the private experts', in the process of policy making for Highly Advanced National(HAN) project, called G7 Project, which had been implemented for 10 years in 1990s. Then, this will discuss the policy implications available to the similar policy areas in the future. The result shows that the agenda setting of the G7 Project, one of the successful national R&D projects in Korea, had been initiated by a few leaders who had have the perspective of pioneer. In addition, this explains that private experts had more played than civil servant did in the process of policy formation, which had been backed up by the R&D plannin4g system then introduced in R&D management process for the frist time. This case study will provide policy makers with the opportunities to remind 'the necessities of the policy management by the system not actors', 'more effective management of distribution policy' and 'the better role of related experts in the policy making process'. Also, above issues will make both the practitioners and the researchers again consider how to improve the rationality and effectiveness of the policy making process in the field of science and technology.

  • PDF

CULTURAL IMPACT ON KNOWLEDGE MANAGEMENT PROCESS AFFECTING PROJECT MANAGEMENT PRACTICE

  • Eric Wai-Leung Chan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.173-183
    • /
    • 2009
  • Knowledge management (KM) is one of the useful management tools in today's project management (PM) practice, such as construction projects. Nobody can deny the importance of "useful knowledge" always helps organizations and project managers shaping a decision. Due to the trend of globalization, it is now very common that an organization may comprise employees from different countries of distinct national-cultures working together. It is also not uncommon that different projects, within an organization, may have their own organizational-cultures which influence its knowledge repository, transfer process and knowledge strategy. Therefore, it is extremely difficult to align all these cultures and consolidate them to benefit the KM process and PM practice. Organizations and project managers understand that different national-cultural and organizational-cultural factors will create impact on the philosophy of KM process which will subsequently affect PM practice. Those factors may affect interpersonal relations and exchange of knowledge between projects and amongst staff. Systematic KM process can utilize the goodness of different employees from distinct cultures which can eventually drive the organization and projects to success. The purpose of this paper, based upon a case study of a Hong Kong construction company, is to discuss how those cultural factors are linked to KM and what organization and project managers can do to improve the KM process and PM practice.

  • PDF

A Study on the Method of the Risk Management in the Housing Project (주택사업의 리스크 원인분석 및 대응방안에 관한 연구)

  • Lee, Jong kyu;Lee, Ju Hyung
    • KIEAE Journal
    • /
    • v.8 no.2
    • /
    • pp.79-86
    • /
    • 2008
  • A housing project is very sensitive the changing environment. Therefor, a housing project is the high risk. Therefor in order to be succeed the project it becomes necessary to effectively manage the risk involved in the process of the housing project. This study analysed the risk factors that involved in the process of the housing project as compared with the precede research. The results of this research are as follows : First, complete feasibility study and verification with conviction in market and environment are required. And, securing organization and specificity for simulation and variation of environment are required in the process by step. And then, complaint and flaw are required in the final stage. The results of this study can be used as the guideline to make the risk management system for the housing project.

Reducing the Rate of Defective to Improve a Welding Condition -Based on Six Sigma Process- (용접조건 개선으로 불량률 감소 -6시그마 프로세스를 중심으로-)

  • 박진영
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.1
    • /
    • pp.123-131
    • /
    • 2003
  • This paper considers a six sigma project for reducing the defects rate of the welding process in manufacturing firms. The project follows a disciplined process of five macro phases. define, measure, analyze, improve and control(DMAIC). The need of customers is used to identify critical to quality(CTQ) of project. And a process map is used to identify process input factors of CTQ. Four key process input factors are selected by using an input factor evaluation of teams; an interval of welding, an abrasion, an electric current and a moving freely. DOE is utilized for finding the optimal process conditions of the three key process input factors. Another one key input factor improved to welding machine. The six sigma level of defects rate becomes a 2.01 from a 1.61 at the beginning of the project.

Business Process Model for Urban Regeneration Project using BPMN Modeling Method (BPMN 모델링 방식을 활용한 도시환경정비사업 업무프로세스 모델)

  • Kim, Jae-Wook;Ryu, Han-Kuk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.41-50
    • /
    • 2010
  • From 2000s, the development to improve space use of urban area has been requested because of unorganized urban development in 1960~70s. For this reason Urban Redevelopment projects have been changed to urban regeneration project based on the renewed law. Recent urban regeneration Projects are bigger and more complex than ever. These kinds of projects need good communication between projects stakeholders, however there are problems in processing project for the lack of standardized business process. The purpose of this study is to provide common business process of urban regeneration projects for stakeholders to improve understanding project business process through analyzing association way of urban regeneration project and modeling business process by BPMN (Business Process Modeling Notation) method. And also it is expected to improve communication between stakeholders and to shorten project time through prompting project participation with the proposed business process.

Measurement and Analysis Process Improvement Based on CMMI (CMMI 기반의 측정 및 분석 프로세스 개선)

  • Han, Hyuk-Soo;Do, Sung-Ryong
    • Journal of Information Technology Services
    • /
    • v.10 no.4
    • /
    • pp.229-242
    • /
    • 2011
  • It is necessary to have measurement and analysis activity for managing software project. At least, every project measures time and cost in order to figure it out whether it will finish within its deadline. CMMI has Measurement and Analysis process in Maturity Level 2. In Measurement and Analysis process, Indicators for decision making in project management are defined and analysis procedure of the measurements to get the indicators are specified. Also, the way of collecting the data and storing them is also planned. Establishing efficient and effective measurement and analysis process in the organization by improving existing process is very important for project success. In this paper, we provide a method for analyzing the measurement and analysis process and improving it based on IDEAL model. It will support the organizations which are trying to adopt CMMI to establish measurement and analysis process.