• 제목/요약/키워드: Project Planning

검색결과 2,075건 처리시간 0.029초

일본 토치오 거주환경 보전을 위해 학생과 거주자의 협업을 통한 지속가능 프로젝트 (Sustainable Project for Preserving a Living Environment in Tochio through Collaboration with Students and Inhabitants in Japan)

  • 니시무라, 신야;보다, 사토시;테라다, 신지;사쿠라이, 노리코
    • 한국주거학회논문집
    • /
    • 제26권6호
    • /
    • pp.17-25
    • /
    • 2015
  • Since 1997, Dr. Shin-ya Nishimura has been developing an actual town planning project named the "Gangi Project". Students, inhabitants and local professionals walk around Omotemachi, examine the characteristics of the environment and the inhabitants' way of life, discuss plans and designs for traditional wooden arcades called locally "gangi". Students and inhabitants build the gangi together every year. The purpose of this study is to clarify how an experimental project aiming to preserve a living environment obtains sustainability as an actual town planning exercise. The research hypothesizes that sustainable town planning should include strategies for financial autonomy, active participation of inhabitants, supports from local professionals, an acceptance of changing environments, and responsible construction. The project has been carried out as a part of actual town planning, and continues to create a daily living environment based on the recent economical and industrial situation of the town. By focusing on the influences of the project on the town and inhabitants, the study has revealed the possibility of an actual town planning with small budget, and importance of a collaborative relationship with various participants in order to foster a sense of responsibility regarding the construction. The project also highlights the implication that sustainable town planning creates not only a participatory system but also a collaborative one in which participants take responsibility for the issues involved in the construction process.

소프트웨어 산업체 요구사항을 반영한 자동화된 프로젝트 계획 생성 지원 기법 및 도구 (Automatic Project Planning Technique and Tool Based on Software Industry Requirements)

  • 박지훈;신동환;홍광의;서동원;화지민;배기곤;서영석;배두환
    • 소프트웨어공학소사이어티 논문지
    • /
    • 제26권4호
    • /
    • pp.77-92
    • /
    • 2013
  • 소프트웨어 프로젝트 계획 생성 과정은 (1)프로젝트를 수행하기 위한 작업 구조(WBS)를 작성하고, (2)각 작업에 필요한 공수를 예측한 뒤, (3)작업에 인력을 할당하여, (4)전체 일정을 예측하는 과정으로 이루어진다. 프로젝트의 규모가 커질수록 가능한 작업 구조, 공수, 인력 할당의 조합의 수가 급격히 많아지며 이에 따라 프로젝트 계획 생성 과정의 복잡도가 매우 높아지게 된다. 따라서 이를 지원하기 위한 프로젝트 계획 생성 지원 기법이 필요하다. 본 연구에서는 실무 전문가 그룹과의 논의를 통해 소프트웨어 프로젝트 계획 생성 지원 기법에서 고려해야 할 여러 실무 요구사항들을 도출했다. 도출된 실무 요구사항을 고려하여 개발된 프로젝트 계획 생성 지원 도구 APP(Automatic Project Planner)는 개발 조직의 과거 지식 데이터를 활용한 공수 예측을 지원하며, 실무 이슈가 고려된 자동 인력 할당을 제공한다. 본 도구를 통해 합리적이고 현실적인 프로젝트 계획의 기반을 마련할 수 있다.

  • PDF

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

INTEGRATED CONSTRUCTION PROJECT PLANNING USING 3D INFORMATION MODELS

  • Chang-Su Shim;Kwang-Myong Lee;Deok-Won Kim;Yoon-Bum Lee;Kyoung-Lae Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.928-934
    • /
    • 2009
  • Although the evolution and deployment of information technologies will undoubtedly play an important role in the current construction industry, many engineers are still unsure of the economic value of using these technologies. Especially for the planning of a construction project, a collaboration system to utilize the whole resources is a essential tool for the successful outcome. A detailed, authoritative, and readily accessible information model is needed to enable engineers to make cost-effective decisions among established and innovative plan alternatives. Most engineers rely on limited private experiences when they create solutions or design alternatives. Initial planning is crucial for the success of the construction project. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information delivery, we need a mediator between engineers. Object-based 3-D models are useful for the communication and decision assistance for the intelligent project design. In this paper, basic guidelines for the 3-D design according to different construction processes are suggested. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Basic architectures of geometry models and their information layer were established to enable interoperability for design checks, estimation and simulation. A typical international project for roadway was chosen for the pilot project. 3-D GIS model was created and bridge information models were created considering several requirements for planning and decision making of the project. From the pilot test, the integrated construction project planning using 3-D information models was discussed and several guidelines were suggested.

  • PDF

ACTIVITY-BASED STRATEGIC WORK PLANNING AND CREW MANAGEMENT IN CONSTRUCTION: UTILIZATION OF CREWS WITH MULTIPLE SKILL LEVELS

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;SangHyun Lee;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.359-366
    • /
    • 2013
  • Although many research efforts have been conducted to address the effect of crew members' work skills (e.g., technical and planning skills) on work performance (e.g., work duration and quality) in construction projects, the relationship between skill and performance has generated a great deal of controversy in the field of management (Inkpen and Crossan 1995). This controversy can lead to under- or over-estimations of the overall project schedule, and can make it difficult for project managers to implement appropriate managerial policies for enhancing project performance. To address this issue, the following aspects need to be considered: (a) work performances are determined not only by individual-level work skill but also by the group-level work skill affected by work team members, each member's role, and any working behavior pattern; (b) work planning has significant effects on to what extent work skill enhances performance; and (c) different types of activities in construction require different types of work, skill, and team composition. This research, therefore, develops a system dynamics (SD) model to analyze the effects of both individual-and group-level (i.e., multi-level) skill on performances by utilizing the advantages of SD in capturing a feedback process and state changes, especially in human factors (e.g., attitude, ability, and behavior). The model incorporates: (a) a multi-level skill evolution and relevant behavior development mechanism within a work group; (b) the interaction among work planning, a crew's skill-learning, skill manifestation, and performances; and (c) the different work characteristics of each activity. This model can be utilized to implement appropriate work planning (e.g., work scope and work schedule) and crew management policies (e.g., work team composition and decision of each worker's role) with an awareness of crew's skill and work performance. Understanding the different characteristics of each activity can also support project managers in applying strategic work planning and crew management for a corresponding activity, which may enhance each activity's performance, as well as the overall project performance.

  • PDF

농촌경관의 보전 및 개선을 위한 경관사업의 도입 방안 연구 (A Study on Introducing the Landscape Project for Conservation and Improvement of Rural Landscape)

  • 신지훈
    • 농촌계획
    • /
    • 제16권4호
    • /
    • pp.77-86
    • /
    • 2010
  • The purpose of this study is to introduce the landscape project for conservation and improvement of rural landscape. So, in this study, the current rural landscape policies and rural landscape planning are examined and the landscape project presented in Landscape Law is also examined. And this study propose the systemic application of the landscape project through the survey of experts related with the landscape project. The results are summarized as follows. Firstly, it is important that each landscape projects are unified for conserve and improve rural landscape. Secondly, it is necessary to define range, enforcement agency, and management agency of landscape projects. Thirdly, it is desirable that the landscape projects should be carried out as reviving the local economies. Comparing to the urban landscape plan, there are few rural landscape plans so far, so, it is difficult to applicate the system of the landscape project, but, continuous studies in this line can help the rural landscape plan to ensure practicality.

Plan of Sapti Community Garden-Park by Design Charrette

  • Lee, Kyoungjin;Sung, Junghan
    • 휴양 및 경관연구
    • /
    • 제12권4호
    • /
    • pp.79-90
    • /
    • 2018
  • Yesan-gun was selected to receive a "Village Community Garden Project" in 2018 to foster a sense of community and improve the urban landscape by working with neighbors to create a happy living space for residents. Yesan-gun selected Sapti Park, located in Yesan-eup, as the project site. The project was carried out through the design charrette method (an intense period of collaborative creativity) to allow residents to propose and design park concepts themselves for the community garden construction project to ensure that that the park facilities would provide something for everyone to enjoy. This study followed the actual design project that actively introduced the design charrette in planning the community garden, describing the entire design process from planning to construction and revealing how the opinions of residents were projected onto the design drawings. The purpose of the project was to advance user-participation design methods by reviewing the progress of the design charrette process and to examine how storytelling, the act of conveying ideas through a fun and persuasive story, transformed the plans for the community garden.

농촌중심지 마을만들기를 위한 계획수립과 모니터링 개선 방안 (A Study on the Improvement of Planning and Monitoring for the Rural Center Village Development Project)

  • 강신길;최영완;김근호;김영주
    • 농촌계획
    • /
    • 제24권3호
    • /
    • pp.117-125
    • /
    • 2018
  • After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.

Global Collaboration During Front End Planning of Capital Projects

  • Gibson, G. Edward Jr.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.15-18
    • /
    • 2015
  • Front end planning is arguably the most impactful process in the successful delivery of capital projects. Organizations expend substantial effort in this planning process, intending to minimize risk and promote project success. This process has been well documented, including critical technical components, as well as the importance of team collaborative components. As organizations continue to pursue large projects with multi-national participation from sponsors, designers, contractors and suppliers, the importance of collaboration on a global scale during front end planning becomes more important, not less. This paper will outline research performed over the past two decades giving the basic components of the process and the value of global collaboration. It will provide guidance to project participants in pursuing successful planning.

  • PDF

건설프로젝트 계획단계에서 폐기물 관리방안 연구 (A Study on Waste Management Method of Construction Project in Planning Stage)

  • 조성;조용;박원호;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.155-158
    • /
    • 2008
  • This paper shows construction management focused on waste management in construction project in planning stage Construction waste is given a great deal of weight on total waste. And it is issued in government policy. But it show the limit of problem.As a result of having referenced idea as describe above, this paper will be studied by this process. First, present condition of development waste, cases is researched in construction projects. Second, problems of development pattern and management system are investigated and checked in project cases. Third, maintenance and management method project are proposed by application of planning Stage.

  • PDF