• Title/Summary/Keyword: Project Plan

Search Result 2,079, Processing Time 0.03 seconds

A Study on Results and Improvement Method of Advanced Rural Village Development Project (전원마을조성사업의 성과와 개선방안 연구)

  • Jeong, Jong-Sool;Kim, Kang-Sub;Kang, Byung-Hwan;Lee, Sang-Jung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.12 no.2
    • /
    • pp.125-133
    • /
    • 2010
  • The advanced rural village development project started in 2005, and this project of purpose is improvement of housing environment and promotion of region activation. Researcher investigated about the advanced rural village development project of nine complex through field survey. The aim of this study is to be offered data of idyllic housing policy by examination actual conditions of study subject. Based on this study, mainly three results can be drawn as follows ; first, this project makes a great contributed to flow in population from urban to activate rural areas. Second, the project success depends on improvement an institution and planed, timely approach. Third, central government must plan network system with rural development project in political, and must support local government into political frame. The local government must consider a regional housing plan overall and must make an effort itself for the project success.

Communication-Centered Project Management for Requirements Definition Phase

  • Ishii, Nobuaki;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.39-47
    • /
    • 2012
  • Requirements definition, which determines a project baseline, has a strong impact on the success of a project. However, since in-depth requirements are gradually revealed through the requirements definition process, the requirements definition is not a straight forward process and often falls into disorder. Thus project management standpoints are critical for the success of the requirements definition. In this paper, we present a framework and mechanisms of communication-centered project management, which controls the requirements definition process based on the situation of communication-oriented activities among stakeholders. In addition, we present a communication-centered project plan with a planning method. The project plan, which represents a time schedule of requirements definition activities, is made by a simulation-optimization algorithm using a stakeholder matrix showing the relations of requirements domains and relevant stakeholders. The effectiveness and the significance of communication-centered project management at the requirements definition phase are demonstrated by numerical examples.

The Outline of Han River Basin Environmental master Plan Project (한강유역 환경보전 종합계획 사업의 개요)

  • 이선환
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.1
    • /
    • pp.46-50
    • /
    • 1982
  • Following rapid industrial development and urbanization in Korea, there is a need for the Government to implement effective control of pollution and to undertake specific schemes in areas where pollution of the environment is severe. In response to this need, Government of Korea prepare Han River Basin Environmental Master Plan Project for water, air, solid waste to cover environmental protection of the Han River Basin. The Project area is approximately 27,000 sq. Km extending over Seoul, Kyunggi, Kwangwon, Chungbuk Province. The total population of Master Plan Project area is approximately 11.6 million, or one-third of the total population of Korea. There are about 8,000 industries, including those located in 16 industrial complexes, in the project area. The scope of work and terms of reference are the following: (1) A Summary of existing land use and forecasts for changes in land use by the year 2,000. (2) Emission inventories for air, waste water, and solid wastes. (3) Forecasts of future population growth patterns and pollution loadings. (4) Identification of specific projects needs to reduce pollution levels and satisfy the environmental quality standards. (5) A Program of enforcement to include (i) self monitoring, and (ii) governmental inspections and surveillance. (6) A program for quality improvement and quality assurance of environmental measurements. (7) Reports summarizing all data collected analyzed during the study. (8) Conceptual design and feasibility studies, including cost estimates, for needed pollution control projects. (9) A financial plan for future detailed design and construction of public facilities, for financial incentives to industry, and for user charges for industrial use of public treatment of disposal works.

  • PDF

A Study on the Strategy of Sustainable Hospital Architecture Masterplan (지속가능한 병원건축 마스터플랜 전략에 관한 연구)

  • Park, Cheolkyun;Yang, Naewon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.26 no.4
    • /
    • pp.15-26
    • /
    • 2020
  • Purpose: The purpose of this study is to derive a plan to establish a more sophisticated master plan so that the direction of master plan study can be sustained in the mid to long term. Methods:: Compare and analyze the differences between the master plan and the design to identify causes and problems. First, after establishing the master plan, compare the expansion area, net area per bed, and service area with the design drawing of the first project to determine the degree of recovery to the level required by the recent medical environment. Second, the possibility of responding to future internal changes is reviewed by comparing and analyzing the arrangement and connection method of extension buildings. Third, comparing the difference between the project following the first project and the phased of masterplan. Results: The first one is that continuous participation of person or group with high understanding of the master plan. Second, establishing a master plan and proceeding with the project through the determination of the correct business budget. Third, a specific area of the mechanical and electrical room suitable for the size and purpose of the hospital should be presented, and research on the arrangement method should be conducted. Finally, the feasibility of the hospital's own plan for securing parking facilities should be accurately investigated. Implications: It is important for the hospital to recover from the past to the present and respond to the future that the direction of the master plan continues after the establishment.

Contents Analysis on the Rural Village Development Projects: With Focus on Project Regions during 2004-2007 (농촌마을종합개발사업 내용분석과 시사점 -'04-'07년 사업대상지 사업을 중심으로 -)

  • Park, Han-Sik;Hwang, Gil-Sik;Kim, Young-Taek
    • Journal of Korean Society of Rural Planning
    • /
    • v.14 no.4
    • /
    • pp.121-128
    • /
    • 2008
  • The purpose of this study is to identify the trend of the contents of the plan that was implemented through contents analysis on the master plan project of rural village development projects that began in 2004. Contents analysis is based on the classification of business in the detailed enforcement regulations of rural village development project. Analysis on the project contents was conducted for 30 days from June 20 to July 20 for the 132 regions established in the master plan during the period from 2004 to 2007. The results of the analysis showed the following. First, scenery facilities, rural tourism, cultural welfare and income basis projects accounted for 76.5% of the total projects. Second, with regard to investment costs depending on the contents of the projects, cultural welfare, rural tourism and income basis projects accounted for 66.3% of the total investment costs. Third, it was found out that, with regard to the trend of change in the project contents by year, income basis projects were sharply reduced whereas cultural welfare and scenery facilities projects were increased. Finally, with regard to the analysis on the projects by region, it was found that Gangwon, Gyeonggi and Chungnam gave high weight on rural tourism, whereas Gyeongbuk, Jeonnam and Jeonbuk gave low weight on rural tourism. Particularly, Gyeongnam was found to have given low weight on income basis project.

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

A Study on the Integrated Conceptual Model of Software Development Project Management System (소프트웨어 개발을 위한 통합 프로젝트 관리의 개념적 모형에 관한 연구)

  • Mun, Yong-Eun;Lee, Jae-Beom
    • Asia pacific journal of information systems
    • /
    • v.6 no.1
    • /
    • pp.241-267
    • /
    • 1996
  • The problems like exceeding estimated cost, late due-date, expensive maintenance, insuffiency of experts and low productivity are becoming emphasized related with the software development. In order to overcome these problems and to develop the highly qualified software within the limited resources, a project management tool is used. The purpose of this study is to develop a conceptual model of the project management system which can plan, analyze and control the software development projects effectively. The model is constructed with plan and track management system, cost management system and operation management system for the efficient project management. It is named by LSD-PMS : Large-scale Software Development Project Management System. We reviewed 5 cases of project management. LSD-PMS is evaluated and reviewed by the project managers in the field. It is proved that LSD-PMS is a tool which can help project managers develop software successfully given budget and time schedule. In the future, this system should be further developed as an integrated model with system implementation tools such as CASE products.

  • PDF

Development of a system for Project Quality Plan in Connection with Schedule D/B (공정D/B 연계를 통한 품질계획서 운영시스템 개발)

  • Moon Jin-Young;Kim Kyung-Rai;Kim Yea-sang;Chin Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.444-449
    • /
    • 2001
  • Because of preferential treatment in PQ judgement, many construction company got the certification of ISO 9000. But the main objective of them was just certification itself. The ISO 9000 certification which was composed of 20 requirements was a standard just for the manufacturing industry, so it was difficult that it was applied to a business of construction industry. In these reasons, they have revised ISO 9000:l994 which was composed or 20 requirements to ISO 9000:2000 which requests to focus on business process. In this research, we'll develop a System for Project Quality Plan that is related with information of site process in an apartment housing project. This system is intended to increase use of project quality plan in construction sites based on the construction process.

  • PDF

A Study on the Monitoring and Evaluation of Priority Projects for Urban Regeneration (도시재생사업의 모니터링 및 평가방안 연구: 선도지역을 사례로)

  • Kim, Ryoon-Hee;Lee, Jong-Gun;Lee, Sam-Su
    • Land and Housing Review
    • /
    • v.6 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • This study is significant by suggesting the plan of urban regeneration strategy, selection of vitalization area and build basic DB for establishing a plan of urban regeneration vitalization and draw measures to evaluate and monitor as urban regeneration project is promoted in earnest. For the process of study, basic DB and evaluation monitoring index were examined based on collaboration proposal of 13 leading areas and (the agenda of) the plan of urban regeneration vitalization in 4 areas(Seoul, Changwon, Busan, Yeongju). This study can be concluded as follows; First, general information system which can support regeneration strategy vitalization plans for smooth promotion of the project and manage regeneration vitalization project and all kinds of city maintenance projects systematically are necessary. Second, monitoring of regeneration project should be firstly institutionalized. thrid, it's necessary to secure that city or county foundational management plan and the relations during the establishment of strategic vitalization plan. Finally, it's necessary to introduce and evaluate modularized plan suitable for Bottom-up regeneration project.