• 제목/요약/키워드: Project Plan

검색결과 2,080건 처리시간 0.026초

수도권 고속철도 노선선정 연구 -설계4공구를 중심으로- (A study on the Highspeed Railway Route Selection -Focusing on 4 design tools-)

  • 김종석;김우제
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.200-207
    • /
    • 2011
  • The research which sees accomplishes the capital region high-speed railway and examines investigates about process of railroad construction project and an advance service contents from to understand a progress process, change process and technical investigation of basic design and the execution plan at the time of route led and accomplishes the plan which is detailed the process which in the center researched. Also plan start method and application plan, clear the security of the plan air which is proper is necessary and dividing which design phase is, plan process construction etc. improvements sacrifice froze.

  • PDF

초고속 자기부상철도 개발을 위한 시스템엔지니어링 계획서 (Systems Engineering Plan for the Development of Ultra-High-Speed Maglev Train System)

  • 이영훈;민성기
    • 시스템엔지니어링학술지
    • /
    • 제5권1호
    • /
    • pp.21-32
    • /
    • 2009
  • The systems engineering (SE) process shall be applied to the project for successful development of ultra-high-speed (UHS) Maglev train system which is one of very large and complex systems. It is important to abolish technology differentials from the advanced developers such as Germany, Japan, etc. and to ensure discriminatory competitiveness of the application of systems engineering process for the development of the system based on appropriate concepts and requirements. General operation concept and stakeholder's requirements of UHS Maglev train system must be elicited with system concept for initiating the project. The management plan should be devised for all sorts of systems engineering activities of risk management, performance management, lifecycle cost management, etc. This paper would support to establish the systems engineering management plan (SEMP) for the program of UHS Maglev train system development with associated documents.

  • PDF

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

지방자치단체 환경영향평가 조례 비교 연구 (A Comparative Study on the Local Governments' Environmental Impact Assessment Regulations in Korea)

  • 성현찬;민수현
    • 환경영향평가
    • /
    • 제12권3호
    • /
    • pp.137-150
    • /
    • 2003
  • This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.

A Study on the Establishment of the National Spatial Data Infrastructure

  • Hong, Sang-Ki;Shin, Dong-Bin
    • 동굴
    • /
    • 제82호
    • /
    • pp.13-16
    • /
    • 2007
  • Several research projects funded by National GIS Master Plan have started to produce several outcomes that need to be applied in the real world situation. To make the project results more useful and to improve upon the current results, it is necessary to integrate the project outcomes produced under various circumstances into a consistent and coherent structure.

건설사업 관리의 안전관리 향상 방안에 대한 연구 (Safety Management Improvement Plan in Construction Project)

  • 김민석;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.115-116
    • /
    • 2012
  • The number of safety accidents of the construction industry is higher than other industries. To prevent the accidents from hazard factor, the employees are variously trained in avoiding an accident. Also many studies have been conducted to reduced the safety accident. But most of these studies are limited to institutional complements. This study proposes safety management improvement plan of safety management through case studies.

  • PDF

공공디자인 개선사업의 추진실태 분석에 관한 연구 - 대구시 동성로 공공디자인 개선사업을 중심으로 - (A Study on the Analysis of Project Implementations at Public Design - Improving Project for Public Design in Daegu, Dongseong Street -)

  • 이종국
    • 한국주거학회논문집
    • /
    • 제25권6호
    • /
    • pp.67-74
    • /
    • 2014
  • Dongseong-ro public design was reformed for a short time to be short of connection and riffle effect of another project and to have limitation on long term and integrated development, so that systematic plan from beginning of the project was needed to produce synergy effects. The purpose of the study was to investigate reformation of Dongseong-ro public design and to check on existing development project again and to take actions against future projects in advance and to reexamine and make long term plan from point of view of development of downtown. This study investigated reformation of Dongseong-ro public design of Junggucheong office of Daegu that was done from May 2007 to December 2010. The study consisted of purpose of the project, scope, time, the committee of promotion, questionnaire survey, residents' participation and follow up to suggest reformation based on questionnaire survey. This study had limitation of investigation into internal materials of 'Dongseong-ro public design reformation's master planning service' of Junggucheong office of Daegu. Further studies were needed to investigate empirically.

철도종합안전기술개발사업의 성과물 검증 프로세스 구축 (Construction of verification process for the railway total safety technology development project)

  • 윤혁진;한순우;김상암;최경진;조연옥
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1187-1192
    • /
    • 2007
  • Recently, many organizations such as, including government, railroad operational, railroad facilities managemental and research authorities have made a lot of efforts to identify and prevent hazards from leading to accidents and solve them all over the railroad industry. Railroad total safety technology development project conducted as one of national R&D projects has established business formation structure based on system engineering as an effort to define and give a solution to facing problems in the field of railroad. This paper is building procedures to verify the outcomes derived from this project. The verification process is the one for verifying the outcome produced in the final stage of the project or during the project. It makes sure that the system is satisfying the system requirements through verification of the outcomes produced after conducting the project for verification. We've made verification plan for technically reasonable verification using verification process developed through this research, and established master verification plan in the level of 15 detailed projects for interim and final outcomes produced.

  • PDF

An Urban Regeneration Project for Making New CBD of Northeastern Seoul: The Case Study of the Changdong & Sanggye Project

  • Koo, Ja-Hoon
    • 토지주택연구
    • /
    • 제8권2호
    • /
    • pp.73-82
    • /
    • 2017
  • Although Changdong Sanggye area has been developed during 1980s as a new city for the supply of low-income housing, currently it was degraded to a bed town located outside Seoul. However, Changdong Sanggye area is designated as the center of a metropolitan area in '2030 Seoul City Basic Plan' due to a variety of potential factors such as a traffic center for linking metropolitan areas, location of 15 universities, and neighboring natural environment like Jungnang stream and Buckhan mountain. The purpose of urban regeneration plan is to create a new CBD of Changdong Sanggye which is the center of vocational and cultural lives of 3.2 million people in the northeastern metropolitan area. To achieve the purpose, 12 unit projects and 24 sub-unit projects are set up based on the three major goals and core strategies. An enterprise project team of northeastern area was newly founded and then a dedicated organization was established by the Seoul government in 2015 in order to integrate separated urban regeneration related functions. In the Seoul government an administrative council and a project promotion council are operated for consultation and coordination between the administrative divisions and government projects for urban regeneration. Through the success in Changdong Sanggye regeneration project, they are expected to have economic effects such as job creation and increase in tax revenue and to re-vitalize the area as a new economic center in northeastern Seoul having amenities and cultural facilities and waterfront parks.

AHP를 활용한 문화관광개발 사업의 평가지표 개발 및 적용 -안동시 3대 문화권 문화·생태 관광 기반조성 사업을 중심으로- (The Development and Application of the Indices of Evaluation for the Cultural Tourism Development Project Using AHP -focusing on Cultural and Ecological Tourism Infrastructure Project in Three Cultural Areas of Andong City-)

  • 권기창
    • 한국콘텐츠학회논문지
    • /
    • 제16권4호
    • /
    • pp.399-407
    • /
    • 2016
  • 본 연구는 AHP를 활용한 문화관광개발 평가항목의 가중치 설정에 관한 연구로 안동시 3대문화권 문화 생태 관광기반 조성 사업을 사례로 분석하였다. 평가항목의 신뢰도를 조사한 결과 0.9로 분석되어 적합한 것으로 나타났다. 가중치의 분석에서 상위계층의 경우 계획의 타당성, 경제적 타당성, 정책적 타당성 순으로 도출되었다. 다음으로 계획의 타당성에 대한 세부지표는 콘텐츠의 차별성, 정책적 타당성에 대한 세부지표는 지역특성의 부합성, 경제적 타당성에 대한 세부지표는 지속가능성으로 가장 높은 가중치가 나타났다. 결론적으로 3대 문화권 문화 생태 관광기반 조성사업의 추진방향은 당초 계획보다 많은 시간이 지연됨에 따라 환경의 변화에 능동적으로 대처하기 위해 당초 계획을 중심으로 사업계획을 일부 변경하여 추진하는 것이 바람직하다는 결론을 도출 할 수 있었다.