This paper is application of System Assurance(SA) for the rolling stock. As railway systems become more complex, design teams are increasingly under pressure to deliver, design solutions, which integrate both technical and Systems Assurance(SA). Systems Assurance is the application of management methods and analysis techniques to ensure that a design meets Reliability, Availability, Maintainability and Safety (RAMS) criteria. It should be clearly understood that the intent of System Assurance is not just to provide analytical techniques as a metric on performance, but more importantly it should provide a management tool with which to co-ordinate and assure the whole design. System Assurance encompasses the ongoing requirement to consider safety, and RAM through each stage of a Project, from feasibility study through to commissioning and operation. If System Assurance is undertaken properly at feasibility study at the design stages of a Project, the benefits of such analyses can be significant in identifying potential problems early enough for action to be taken before manufacture or installation. At commissioning, RAMS demonstration activities are undertaken to validate the predictive and analytical techniques undertaken during the design.
Park Y.M.;Han G.J.;Choi S.K.;Jung M.K.;Lee S.H.;Kim N.H.;Lee K.B.;Song J.H.
Proceedings of the KIPE Conference
/
2001.07a
/
pp.352-355
/
2001
This paper makes a general description of the results at government project which were peformed for several years. Through this project, the real capacity of 3.3KV/4MW Class 3 Level Voltage Source Inverter System were designed and the characteristics of its proto type were analyzed, moreover the web based IIMS(Inverter Information Management System) and Virtual Operation Simulator was developed. Now, this system is running for field application test.
Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
International conference on construction engineering and project management
/
2005.10a
/
pp.341-346
/
2005
After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.
Journal of the Korean Society for information Management
/
v.4
no.1
/
pp.154-169
/
1987
The Computerizing Record Management System(RMS) has been developed for ULJIN Nuclear Power Plant in Korea on the basis of the Manual System. By means of review and analysis of processing flow & project requirements, system logics such as Receiving system, Logging system, Distribution system, Filing system, Indexing & Retrieval system and Output system of statistic and various reports, have been established for computerizing. Structure of Masterfile has been designed so as to include Bibliographic data, Transmittal data, Distribution data, Area data, RMS data for operation of Plant. The RMS data have been designed for construction and operation of the plant by adding index parameters for operation such as System code, KEPCO No., Component link code and Retention period on the point of receiving. The RMS has turned out an easy access to cross-reference between RMS and Material Control System.
Journal of the Korean Society for information Management
/
v.4
no.2
/
pp.139-151
/
1987
The Computerizing Record Management System(RMS) has been developed for ULJIN Nuclear Power Plant in Korean on the basis of the Manual System. By means of review and analysis of processing flow & project requirements, system, logies such as Receiving system, Logging system, Distribution system, Filing system, Indexing & Retrieval system and Output system of statistic and various reports, have been established for computerizing. Structure of Masterfile has been designed so as to include Bibliographic data, Transmittal data, Distribution data, Area, data, RMS data for operation of Plant. The RMS data have been designed for construction and operation of the plant by adding index parameters for operation such as System code, KEPCO No., Component link code and Retention period on the point of receiving. The RMS has turned out an easy access to cross-reference between RMS and Material Control System.
The Transactions of the Korea Information Processing Society
/
v.7
no.6
/
pp.1810-1817
/
2000
The purpose of this research is to develop an estimation model for information systems operating costs. Current cost estimation practices and types of sytem management projects have been reviewed an analyses. Typical operating project types of information systems are determined. They are application system operation, help disk operation, network management and operation, and hardware management. For each type of projects, cost factors ar identified and a structure of cost estimation model is defined. Cost estimation models have been constructed and tested by 24 real operation projects data. Statistical analysis shows derived models are statistically significant. User groups' opinion on these draft cost estimation model has been surveyed and summarized. The results of this research can be used as a cornerstone for future research on operating cost estimation, and for cost estimation guideline of information systems operation projects.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.54
no.5
/
pp.226-233
/
2005
As the power demand has been increasing, a fault current problem is becoming more serious in real power system. Various ways like bus-split operation, transmission line open operation, are used in Korean power system for solving the problem. In this time, superconducting FCL(Fault Current Limiter) has been developed as a vary attractive alternative since HTS(High Temperature Superconductivity) was discovered. Korea, a project developing superconducting FCL to apply to 154kV transmission system is proceeding. Therefore, a power system analysis for SFCL application to power system is necessary, This paper presents the determination of quenching resistance and the selection of optimal cites when 154kV HTS-FCL is applied to Korean power system.
Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
/
2001.02a
/
pp.48-49
/
2001
Cryogenic technology is one of the key technologies for fusion reactor equipped with superconducting coil for plasma confinement. The KSTAR(Korea Superconducting Tokamak Advanced Research)Project is in progress since 1996. Major parameters of the KSTAR tokamak are : major radius 1.8m, minor radius 0.5m, toroidal field 3.5 Tesla and plasma current 2MA with a strongly shaped plasma cross-section and double -null diverter. Considering practical engineering constraints, the KSTAR device is designed for a pulse length of 300 sec in up-graded operation mode but in the initial configuration would provide a pulse length of 20 sec provided by the poloidal coil system in base-line operation mode. The cryogenic system is composed as follows : cold box, helium compressor system, distribution box, helium gas buffer tank, helium gas purifying system, gas recovery system, liquid helium storage dewar, current lead box, current bus line and liquid nitrogen storage tank.
A multi-train operation simulation software is under development, in this G7 Project for a High Speed Train System, to simulate the running performance, power consumption, signalling and operation. In the first stage, a Train Performance Simulation (TPS) software is introduced in this paper. This is a core module of whole system and gives some parameters of a train, e.g., its position, speed traction and braking power and electric power system state, etc. In this paper, calculation technique was used for voltage drop at the train's positions and major posts along the catenary line. The final program will be used as an evaluation tool for system performance in constructing a new line or introducing a new train system.
A railway is a complex system integrated with a lot of technical elements such as trains, track facilities, human factors, operation & control and maintenance. As a mass transportation system, a railway could contain potential risks that may result in a high death rate and property losses. Accordingly, Railroad Safety Technology R&D Corps. is adopting the plan of the construction of Railway Safety Test Facilities as a part of the Railway Total Safety Project to enhance the railway safety, and carrying out researches on effective project management methods with Systems Engineering techniques. Recently, various systems engineering tools such as CORE or Cradle are applied to manage the system requirements and the project management process in the part of the aerospace engineering and automobile engineering so on. The railway industry also makes an effort to develop an efficient management skills using systems engineering tools as the railway system is multi-disciplinary. Therefore, we propose the more effectual management method of constructing the Railway Safety Test Facilities applying the systems engineering tool to the research.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.