• Title/Summary/Keyword: Project Manager

Search Result 378, Processing Time 0.023 seconds

A Successful Method of Construction Insurance Contracts (성공적인 건설공사보험 가입방안)

  • Kim, Young-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.48-53
    • /
    • 2007
  • A project manager of construction project must analyze risks which might happen during the construction phase and prepare a restoration method against the risks in order to get the successful project's accomplishment. Insurance is a representative kind of risk transfer method and an institution which prevents damages of the insured. In spite of increasing the ratio of construction insurance policy in the construction industry, project managers have regarded the insurance as a formal action in the budget through insurance companies' guides. These aspects make them not be able to valuate the reasonableness of premium rate and the real amount of the risks. This thesis is to present an improved method of construction insurance contract. Firstly, the status of the current construction insurance system have been anlyzed and the problems have been deducted. Secondly the development direction against the problems is presented in the research. Lastly, the procedure model is proposed for acquiring the resonable premium rate of insurance.

  • PDF

Decision Support Model for Selection Water Resources Facility Improvement Projects (수리시설개보수사업 선정을 위한 의사결정지원모델)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.449-459
    • /
    • 2021
  • More than 80 % of agricultural reservoirs are old facilities over 50 years old, and safety and function declines occur. As a result, safety accidents such as the collapse of the reservoir have occurred. Precise safety diagnosis is conducted in advance to prevent accidents such as reservoir collapse, and Water resources facility improvement project are implemented based on priority. However, the priority of the business is selected based on the subjective judgment of the facility manager. In this study, we set 80 hypotheses based on the results of precision safety diagnosis and decision-making examples of existing Water resources facility improvement project and selected 45 variables using correlation analysis and significance test. Using logistic regression analysis, the final 21 variables were selected and a decision support model was presented, and the classification accuracy of the model was 86.8 %. In this research, the part that presented the quantitative index for decision support when selecting the Water resources facility improvement project has important significance.

Life cycle Health Promotion Programs using Traditional Korean Medicine (HaPPs-TKM) and Activation Plan

  • Jo, Jae Kyung;Park, Sunju
    • Journal of Society of Preventive Korean Medicine
    • /
    • v.24 no.3
    • /
    • pp.57-67
    • /
    • 2020
  • Background : The Life cycle Health Promotion Programs using Traditional Korean Medicine (the Life cycle HaPPs-TKM) are the on-going 3rd stage projects that have centered on the development and dissemination of the standard life cycle HaPPs-TKM in the local community. The purpose of the study was to introduce the development background of the standard life cycle HaPPs-TKM and to suggest its activation plan. Methods : Academic and government research reports on the life cycle HaPPs-TKM were analyzed to introduce the development process, development backgrounds and the details of KM-HPP for each life cycle, such as infants and toddlers, adolescents, pregnant women, adults and the elderly. Results : We reviewed the development process of the standard life cycle HaPP-TKM consisted of a series of diagnosis on community members' health problems, establishment of project purpose, research on the involvement of KM intervention in a project, and final development of the project model. And we rediscovered that in the development backgrounds of KM-HPP, there were beneficial goals to manage and promote public health conditions for each life cycle. Conclusion : To activate life cycle HaPPs-TKM, we would recommend that activation plan should include six factors through systematic analysis of research reports. These factors consist of diversified goals for each life-cycle, competency reinforcement of local project manager, diversified Korean Medicinal modalities to enhance Sasang Constitution and Qigong, development of standard Outcome Index, periodical holding of performance contest, and improved guidance of government and associated entities through whole process of HaPP-TKM.

A Study of Global Manufacturing Education and Training for Chinese Company Manager

  • Sun, Jing;Tamaki, Kin'ya;Yeh, Shihshui;Takiuti, Noboru
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.3
    • /
    • pp.252-257
    • /
    • 2014
  • Global economic recession, global market reduction, and the deteriorating economic recession are forcing the industry to reconsider the business plan and strategy related to supply chain regardless of the size of the companies. During the economic recession caused by financial anxiety, development of international collaborative producer is the key theme for a manufacturing industry to get over the situation. Especially, development of high-skilled people who are capable of handling global manufacturing management is the key factor in China which shifted from a world factory to a world market. In this background, we started the international project of global manufacturing education and training for Chinese company managers from 2009. In this paper, based on the research conducted by the universities and companies in China, a design of global manufacturing education and training is proposed. This presented design is based on the theory of Japanese production strategy and investigation of actual conditions for Chinese companies and the research methodology of business management practice with efficiency and productive for international level management organization. The effectiveness of the education design is evaluated by applying the international education and training project of Aoyama Gakuin Human Innovation Consulting Inc. and Vigor Management Technology Association.

A Study on the Proper Methodology for Selecting Domestic Public Sector Construction Management Contracts (국내 공공부문 CM의 평가 및 낙찰자 선정방법 개선안 연구)

  • Lee Yong-Jun;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.296-299
    • /
    • 2002
  • Construction Management tends to create a formal procurement resulted from recent legislative procedures system in domestic construction industry. However, the fact that construction Manager(CMr) has been chosen, in practice, under a poor circumstance in selecting and discriminating specialty requires the more optimal procedures. Therefore, in this research, we analyze the existing shortcomings. the various procedures, influence factors, and the criteria to be considered in selecting and evaluating CMr. Also. this study suggests the improved method based on the facts above. To accomplish the construction project successfully, it is one of the advanced schemes to choose an adequate CMr needed to the project through the precision in the formation and application of the procedure as well as the suggested criterion in selecting CM.

  • PDF

A study on the development of a web-based cost management system of building interior projects (웹을 기반으로 한 실내건축공사의 원가관리 시스템 개발에 관한 연구)

  • 송영규
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.3
    • /
    • pp.197-204
    • /
    • 2004
  • This study aims at the development of a cost management system in building interior projects. Renovation and remodeling is activated and expanded much more being compared with new building construction at present. After Interior project proceeding must get out of simple estimate and assumption, then its be needed a formal work process and computerized cost management. Proceeding a building interior project management was proceed in the office and the field. Cost break down, especially, depend on the field manger and used fiend managing money because its not checked by cost manager in office manger. For this study, cost factors are defined in terms of cost break-down interior works which consist of materials and labors. A data model for cost factors was developed, and a relational database is used to realize cost data management based upon this data model. Data input and output are achieved by internet from both of wired PC and mobile phone. This system can timely display a number of needed reports for cost management that identifies cash flow and predicts budget for cost break-down works in interior projects.

Applicability of Color Corescanner to the Analysis and Data-base of Drill Cores (시추코어 분석 및 데이터베이스화를 위한 칼라 코어스캐너의 응용)

  • ;Ghodrat Rafat
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.249-256
    • /
    • 2001
  • Optical Color Corescanner firstly developed by DMT-GeoTec, Germany and further upgraded through the Korea-Germany joint project is capable of duplicating the core surfaces. The tool uses a digital CCD line camera. As the core is rotated by an electric motor, the camera scans the uppermost line, everytime with a circumferential increment of up to 0.05mm(20pixels/mm) and hence a complete 360$^{\circ}$ unwrapped image(core image) is produced. This paper illustrated diverse research benefits of such core images from several test sites in our country. All scanned images could be stored as a data-base one and easily used with software facilities \circled1 to evaluate a percental distribution of mineral components or grain size etc. not only for the rock classification but also for e.g. the assessment of building stones, \circled2 to study potential reservoirs as a hydrocarbon indicator using ultraviolet fluorescence reflection from cores, \circled3 to facilitate the qualitative and quantitative analysis of fractures, \circled4 to evaluate the fractures and thin bedded reservoirs using spectral color responses. Based on abundant scanning experiments, it would seem that this imaging work should lead to reflecting the future trend in underground survey toward a more comprehensive understanding of the properties and behaviors of in situ rocks.

  • PDF

Activity Creating Method for Multi-Unit Projects

  • Yi, Kyoo Jin;Lee, Hyun Soo
    • Architectural research
    • /
    • v.4 no.1
    • /
    • pp.53-61
    • /
    • 2002
  • The typical Critical Path Method (CPM) leaves it to the construction managers to overcome two problems in developing networks. First, the construction manager needs to prepare information on the type of activities and their precedence relations in order to develop a network schedule. Second, he or she can include space information into the network schedule such as the locations where the activities take place, only with difficulty. These two problems make it difficult for an inexperienced person to create a network. The purpose of this paper is to provide construction managers with set equations of creating a network schedule for multiunit projects. A space-resource combined network creation are presented in this paper, which includes equations for generating a list of required activities, their precedence relations, and information on their location. Information on the space (location) and the resource is the required data for this method. Based on this information, this method divides a project into a number of activities so that each activity contains the information on the location where the activity takes place and the principal resource required for that activity. Precedence relations are then obtained from the sequence of space and resource. This method has the potential to reduce human efforts in scheduling activities.

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

  • Naik, M. Gopal;Radhika, V. Shiva Bala
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.26-31
    • /
    • 2015
  • Success of the construction companies is based on the successful completion of projects within the agreed cost and time limits. Artificial neural networks (ANN) have recently attracted much attention because of their ability to solve the qualitative and quantitative problems faced in the construction industry. For the estimation of cost and duration different ANN models were developed. The database consists of data collected from completed projects. The same data is normalised and used as inputs and targets for developing ANN models. The models are trained, tested and validated using MATLAB R2013a Software. The results obtained are the ANN predicted outputs which are compared with the actual data, from which deviation is calculated. For this purpose, two successfully completed highway road projects are considered. The Nftool (Neural network fitting tool) and Nntool (Neural network/ Data Manager) approaches are used in this study. Using Nftool with trainlm as training function and Nntool with trainbr as the training function, both the Projects A and B have been carried out. Statistical analysis is carried out for the developed models. The application of neural networks when forming a preliminary estimate, would reduce the time and cost of data processing. It helps the contractor to take the decision much easier.

Experience With VTS/AIS as A Systems Integrator

  • Kinsella Tim;Manager Project;Ladd Stephen
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.08a
    • /
    • pp.173-181
    • /
    • 2000
  • Lockheed Martin has integrated and installed numerous AIS systems around the world as part of several VTS installation contracts and technology demonstrations for customers. Each of these systems incorporates specific customer requirements addressing differing objectives. This paper describes the capabilities and features of Lockheed Martin's current implementation of the Universal AIS system, and the experiences Lockheed Martin has had with earlier AIS and ADS (automated dependent surveillance) system installations. Specific examples are provided for an amphibious landing exercise with the US Army; installations at a Middle-East Oil port; technology demonstrations in New York Harbor, USA; river systems in New Orleans, Louisiana, USA; and coastal applications in the Gulf of Suez. The paper closes a brief overview of the most recent activity, the Turkish Straits VTMIS project that requires Universal AIS installations. The evolution of the technology and lessons learned will be discussed in the context of these examples. The perspective will be on Lockheed Martin's experience working with different customers to integrate AIS technology into a larger VTS or Port Information System. It will also discuss, from the practical side, how AIS information is used by a variety of maritime organizations with differing needs and information objectives.

  • PDF