Activity Creating Method for Multi-Unit Projects  

Yi, Kyoo Jin (Department of Safety Engineering, Hankyong National University)
Lee, Hyun Soo (Department of Architecture, Seoul National University)
Publication Information
Architectural research / v.4, no.1, 2002 , pp. 53-61 More about this Journal
Abstract
The typical Critical Path Method (CPM) leaves it to the construction managers to overcome two problems in developing networks. First, the construction manager needs to prepare information on the type of activities and their precedence relations in order to develop a network schedule. Second, he or she can include space information into the network schedule such as the locations where the activities take place, only with difficulty. These two problems make it difficult for an inexperienced person to create a network. The purpose of this paper is to provide construction managers with set equations of creating a network schedule for multiunit projects. A space-resource combined network creation are presented in this paper, which includes equations for generating a list of required activities, their precedence relations, and information on their location. Information on the space (location) and the resource is the required data for this method. Based on this information, this method divides a project into a number of activities so that each activity contains the information on the location where the activity takes place and the principal resource required for that activity. Precedence relations are then obtained from the sequence of space and resource. This method has the potential to reduce human efforts in scheduling activities.
Keywords
scheduling; construction; resource; space; network; project;
Citations & Related Records
연도 인용수 순위
  • Reference