건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Journal of Intelligence and Information Systems
    • /
    • v.9 no.2
    • /
    • pp.171-184
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the most similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research would be extended to cover other stages of project planning.

  • PDF

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2003.11a
    • /
    • pp.171-177
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the best similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research should be extended to cover other stages of project planning.

  • PDF

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

The Effect of the Project Plan Variance on Customer Satisfaction: Focus on IT Project Results (프로젝트 계획의 변동이 고객만족도에 미치는 영향: IT 프로젝트 결과 중심으로)

  • Yoon, Hyeong-Seok;Lee, Seouk-Joo;Kim, Seung-Chul;Park, So-Hyun
    • Journal of Information Technology Services
    • /
    • v.21 no.5
    • /
    • pp.51-64
    • /
    • 2022
  • Companies are planning and executing IT projects using information technology as a means to secure external competitiveness. However, IT projects have high risks and uncertainties due to the invisibility of outputs (systems, services, products), and changes in plans frequently occur during project execution. As a result, most IT projects are closed without achieving the target performance. This can lead to a waste of resources and money for the company, which in turn leads to the loss of opportunities to enter new markets. This study intends to analyze the effect of changes in the project plan on customer satisfaction, which is the project performance. Also, we want to find the importance of project planning so that the target performance of the IT project can be achieved. For the empirical analysis of this study, about 500 actual project data were collected. As for the analysis method, statistical analysis such as simple and multiple regression analysis and control effect was performed. Looking at the results of the analysis, it was found that the scope change affects the cost change and the schedule change. Also, changes in scope and cost were found to affect project performance. The theoretical performance of this study proved the theoretical fact that good project performance comes out if the IT project is executed as planned. The practical performance suggested the need for a change in project management by proving that thorough execution of the project planning stage can improve the project performance in the Korean project management culture, where the project planning stage is poorly performed for the rapid implementation of the IT project.

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

Safety Management Improvement Plan in Construction Project (건설사업 관리의 안전관리 향상 방안에 대한 연구)

  • Kim, Min-Seok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.115-116
    • /
    • 2012
  • The number of safety accidents of the construction industry is higher than other industries. To prevent the accidents from hazard factor, the employees are variously trained in avoiding an accident. Also many studies have been conducted to reduced the safety accident. But most of these studies are limited to institutional complements. This study proposes safety management improvement plan of safety management through case studies.

  • PDF

Systems Engineering Plan for the Development of Ultra-High-Speed Maglev Train System (초고속 자기부상철도 개발을 위한 시스템엔지니어링 계획서)

  • Lee, Young-Hoon;Min, Sung-Ki
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.21-32
    • /
    • 2009
  • The systems engineering (SE) process shall be applied to the project for successful development of ultra-high-speed (UHS) Maglev train system which is one of very large and complex systems. It is important to abolish technology differentials from the advanced developers such as Germany, Japan, etc. and to ensure discriminatory competitiveness of the application of systems engineering process for the development of the system based on appropriate concepts and requirements. General operation concept and stakeholder's requirements of UHS Maglev train system must be elicited with system concept for initiating the project. The management plan should be devised for all sorts of systems engineering activities of risk management, performance management, lifecycle cost management, etc. This paper would support to establish the systems engineering management plan (SEMP) for the program of UHS Maglev train system development with associated documents.

  • PDF