• 제목/요약/키워드: Project Management Plan

검색결과 953건 처리시간 0.025초

개발 프로젝트의 기술관리 계획 프로세스 (Technical Management Planning Process of Engineering Project)

  • 유일상;박영원
    • 시스템엔지니어링학술지
    • /
    • 제1권2호
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

국방정보화기본계획 성과 분석 및 평가 (Performance Analysis and Evaluation on the Defense Information Technology Master Plan)

  • 김수진;이승진;박태현;윤웅직;심승배
    • 한국IT서비스학회지
    • /
    • 제20권1호
    • /
    • pp.11-27
    • /
    • 2021
  • The defense IT master plan is the plan for promoting defense informatization and is established by the Ministry of National Defense every five years. In addition, an implementation plan has been established in accordance with the master plan every year to promote the informatization project. However, since there is no systematic methodology to check and analyze the master plan comprehensively, it is difficult to judge whether the goals suggested in the master plan are achieved, and continuous monitoring of the project is limited. This study proposes a concept and framework for defense IT investment management and proposes a methodology for examining and analyzing the progress of the defense IT plan by referring to the U.S. Department of Defense's IT Plan and the performance management structure of the national IT master plan. As a methodology for managing defense IT investment, we propose an IT investment management code system from the perspective of an IT portfolio and verify its applicability through case studies. The results of this study are expected to improve the defense IT performance management system and improve the efficiency and effectiveness of the defense IT project.

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

대규모 IT 프로젝트를 위한 실용적 행태관리 방안 (Practical Project Behavior Management Methods for Large-scale IT Projects)

  • 김민선;송성환;김용식
    • 한국산학기술학회논문지
    • /
    • 제16권7호
    • /
    • pp.4897-4911
    • /
    • 2015
  • 본 기술의 진화는 역사상 유래 없는 속도로 사회와 기업의 변화를 가속하고 있고 요구되는 대응을 위해 대형 IT 프로젝트가 긴박하게 추진되고 있다. 고도의 기술과 대규모 업무를 다루고, 막대한 인력과 비용이 투입되는 대규모 프로젝트는 인간 심리와 복잡계 이론에 기반한 전략적 갈등관리가 요구되나, 기존의 관리방법은 이에 부응하는 실용적 기제를 제시하지 못하는 실정으로 프로젝트 실패가 증가하고 있다. 본 연구는 적절한 해법을 찾기 위해 프로젝트 실패 현황과 성과 요인, 프로젝트 리더십에 대해 관련 연구하였고, 대형 IT 프로젝트의 복잡성과 갈등구조에 주목하여 기존의 프로젝트 관리방안에서는 간과하였던 심리학적, 행동경제학적 접근을 접목하였다. 논문에서 제시한 프로젝트 행태관리 방안은 대규모 IT 프로젝트의 주요 실패 행태들을 근원적이고 선제적으로 해소할 수 있는 프로젝트 단계별 행태관리 전략과 실천적 프랙티스를 제시한다. 해당 현장 전문가 및 실무자 그룹의 설문조사를 통해 제안된 행태관리 방안의 유효성에 대한 기대를 검증하였고, 본 방안을 대형 프로젝트 관리에 도입함으로써 보다 안정적인 프로젝트 성공 기반을 확보할 수 있다.

DATA WAREHOUSE PROTOTYPE SYSTEM TO SUPPORT THE MASTER PLAN OF URBAN REGENERATION PROJECT

  • Dong-Hyun Cho;Sang-Geum Lee;Hyung-Jin Park;Kyo-Jin Koo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.361-368
    • /
    • 2009
  • In the Urban Regeneration Project, the scale becomes huge and the composition of participating organizations is complex. It is necessary to establish the master plan fast and effectively harmonize conflict options and interests in the early stage of the project. However, the master planner, who is tasked to establish the master plan, and the master planning team, are difficult to establish the master plan fast while effectively considering various and complex information related to regeneration. The Urban Regeneration Project is composed of various types of computer files like HWP, EXL, PDF, DWG and others. When the master plan is established, it is necessary to link the information items and physical files of urban generation in order to effectively save the files in storage for easy search and utilization. This study developed a prototype system to support participating subjects of the Urban Regeneration Projects. It will effectively utilize the information items in the physical computer files using information blocks and Metadata. The developed system provides the base to effectively manage large amount of documents in the early stage of the Urban Regeneration Project and make effective decision-making using the concept of data warehouse.

  • PDF

농촌마을종합개발사업 경관계획수립에 관한 연구 - 예산 오촌권역 - (A Study on the Rural Landscape Planning in Rural Village Development Projects - Yesan O-chon District -)

  • 백승석;민흥기;문영숙;정기호
    • 농촌계획
    • /
    • 제19권1호
    • /
    • pp.179-188
    • /
    • 2013
  • This study has been performed with the purpose of making Rural Village Development Project Landscape Plan in which landscape characteristics in rural villages are reflected so that landscape in the medium to long term shall be established and managed. The issue that has been brought up is that procedures of Rural Landscape Plan and Rural Village Development Project Landscape Plan have been focused on facilities. The study carries out resources survey in agriculture, daily life and history and culture to make Rural Village Development Project Landscape Plan in O-chon district. Through landscape evaluation map participated by local residents, landscape management areas which they can form and manage have been established. The study also suggests Projects and guidelines appropriate to management areas. The study has a different signification from the existing Rural Village Development Project Landscape Plan which is fundamentally devoted to specific projects. The study shows Landscape Plan in the medium to long term and suggests guidelines available to be used by residents.

A Plan for Writing a Desirable Smart Factory Business Plan by Diagnosing the Main Contents of the Smart Factory Business Plan

  • Seong-Hoon Lee
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제16권3호
    • /
    • pp.298-304
    • /
    • 2024
  • The smart factory promotion project is a project that uses ICT technology to improve the production process and the entire management environment system. In Korea, the smart factory promotion project has been continuously implemented since 2014, and the Smart Factory Promotion Team is supporting it nationally. The smart factory promotion project has shown positive results in some companies even in difficult environments such as the COVID-19 situation. In order for each company to promote the smart factory project, it must receive business approval through an evaluation based on the business plan. In order to receive business approval, it is important that the main contents described in the business plan (introduction (business) goals, qualitative goals, quantitative goals, functional composition diagram, etc.) are described consistently. In this study, we studied the cases of several companies to determine whether the main contents of the companies' business plans were consistent. The main contents to be maintained in consistency were the purpose and necessity of introduction, quantitative goals, qualitative goals, functional composition diagram, and expected effects.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

농촌경관의 보전 및 개선을 위한 경관사업의 도입 방안 연구 (A Study on Introducing the Landscape Project for Conservation and Improvement of Rural Landscape)

  • 신지훈
    • 농촌계획
    • /
    • 제16권4호
    • /
    • pp.77-86
    • /
    • 2010
  • The purpose of this study is to introduce the landscape project for conservation and improvement of rural landscape. So, in this study, the current rural landscape policies and rural landscape planning are examined and the landscape project presented in Landscape Law is also examined. And this study propose the systemic application of the landscape project through the survey of experts related with the landscape project. The results are summarized as follows. Firstly, it is important that each landscape projects are unified for conserve and improve rural landscape. Secondly, it is necessary to define range, enforcement agency, and management agency of landscape projects. Thirdly, it is desirable that the landscape projects should be carried out as reviving the local economies. Comparing to the urban landscape plan, there are few rural landscape plans so far, so, it is difficult to applicate the system of the landscape project, but, continuous studies in this line can help the rural landscape plan to ensure practicality.

건설사업관리자의 역량기반 경력관리체계 구축 방안 (Competency-Based Career Management System Plan for Construction Manager)

  • 정서영;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.60-61
    • /
    • 2016
  • The specialty of Construction Manager's work is largely depends on the project progress stage and the type of management work. However, at present, career management system manages only the type and duration of the construction project, disregarding specialty and competence. However, in order to select a right construction manager for the client's needs or project characteristics, career management should be subdivided and managed according to the project progress stages or the types of management. In addition, this career management plan is essential for construction managers to receive appropriate wages for their careers and competences. Therefore, this study proposes a classification system for the integration of career, work, and competency to promote effective career management.

  • PDF