• Title/Summary/Keyword: Project Management Office

Search Result 244, Processing Time 0.036 seconds

Simplified Analysis of Agricultural Water Network Model Using SWMM - A Case Study of Mandae Reservoir - (SWMM을 활용한 농업용수 네트워크 모형 단순화 분석 - 만대 저수지 사례를 중심으로 -)

  • An, Sung-Soo;Bang, Na-Kyoung;Lee, Jong-Seo;Bang, Sung-Soo;Nam, Won-Ho;Kim, Han-Joong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.1
    • /
    • pp.27-37
    • /
    • 2022
  • This study established a water supply network based on the operation case of Mandae Reservoir in Yanggu-gun, Gangwon-do, to analyze the efficient distribution and management of agricultural water supplied from the reservoir to irrigation areas using the hydraulic analysis model SWMM. In order to construct a model to analyze the water canal network, network conditions needs to be simplified, and in particular, excessive detail or simplification of the irrigation area can lead to errors in the analysis results. Therefore, the effect of the water canal network model was analyzed by simulating the appropriate simplification process step by step. The results of simplifying the actual block shape of the analysis target area using SWMM showed that there was no significant difference in the results even if 7 lots were simplified to 2. Also, it was found that the construction and analysis of a simplified network model were reliable when the excess quantity was 2% or more compared to the required quantity for each case of analysis of the paddy field.

Analysis of the Construction Process Managed by the U.S. Army Corps of Engineers Far East District Using IDEF0 (주한미군공사 수행을 위한 FED(Far East District) 프로세스 분석에 관한 연구)

  • Hwang, Jae-Hong;Ham, Nam-Hyuk;Kim, Je-Hyuck;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.163-173
    • /
    • 2010
  • A significant number of projects have been managed by US Army Corps of Engineers FED. Today, more information must be provided to the parties involved in the projects by phase than ever before. Specifically, USFK`s construction projects have been managed by FED(Far East District). Recently, however, large US private construction companies have been filling the role previously taken by FED. However, there is few construction managers to implement FED project in Korea. Accordingly, this study analyzes FED projects practices with focus on the construction management actors in order to suggest guideline. This study suggests a model FED construction process(Bid, Contract, Construction, As-Built Phase) by analyzing the existing FED project process using a IDEF0 methodology.

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

The effect of corporate field teacher and corporate education satisfaction on apprenticeship education satisfaction and student job competency - Focusing on NCS job standards and apprenticeship school project group types - (기업현장교사 및 기업교육의 만족도가 도제교육 만족도와 직무역량 함양에 미치는 영향 - NCS 직무표준과 사업단 유형을 중심으로 - )

  • Yoojeong Kim;Hong Sub-Keun;Kim In-Yeop
    • Industry Promotion Research
    • /
    • v.8 no.1
    • /
    • pp.83-94
    • /
    • 2023
  • This study explored the effect of corporate field teacher and corporate education satisfaction on apprenticeship education satisfaction and student job competency development focusing on NCS job standards and industry-academia-integrated apprenticeship school project group. As a result of the study, satisfaction with corporate field teachers in the electrical, electronic, and food service sectors was found to have a positive influence on improving students' job competency, while satisfaction with corporate education was important in the management, accounting, office, and information and communication sectors. In the analysis by type of project group, the satisfaction of corporate field teachers in the joint practice type and industry-led type had a strong influence on improving job competency, but in the base school type and single school type, corporate education satisfaction had a greater influence on capacity improvement. Therefore, it is necessary to redefine the competencies of corporate field teachers and to establish and implement an industry-academic integrated apprenticeship school operation plan with the relationship between the type of project group and NCS job standard classification.

The Effect of PMO Functions on IT Project Performance (PMO 기능이 프로젝트 성과에 미치는 영향)

  • Kim, Jong-Ki;Yoon, Ok-Soo
    • The Journal of Information Systems
    • /
    • v.20 no.3
    • /
    • pp.129-159
    • /
    • 2011
  • 본 연구의 목적은 PMO의 기능들이 프로젝트 성과에 미치는 직접 효과와 프로젝트 관리 프로세스의 수행을 통한 간접 효과를 PLS 경로모형을 통해 파악하는데 있다. 또한, PMO 역량 및 최고 경영진의 지원에 따른 프로젝트 성과의 차이의 상호 효과 및 그 효과의 크기를 찾고자 한다. 본 연구에서는 방법론 제공, 행정적 지원, 교육 및 훈련, 자원 관리, 지식 관리를 통하여 형성되는 PMO기능과 통합, 범위, 시간, 비용, 품질, HR, 커뮤니케이션, 위험, 자원조달 등을 통하여 형성되는 프로젝트 관리과정을 측정하기 위하여 2차 요인 모형(second-order construct model)으로 연구 모형을 검증하였다. 본 연구에서 각 1차 요인(first-order construct)은 반영지표를 이용하여 분석 하였으며, 2차 요인은 조형지표를 이용하여 분석하였기에, 반영지표와 조형지표가 모두 포함되어있는 모형 분석에 용이한 자료처리 도구인 PLS를 이용하였다. 본 연구의 설문대상은 PMO의 지원 하에서 프로젝트를 수행해 본 경험이 있는 프로젝트관리자나 프로젝트 리더와 같은 전문가 집단으로 한정하여 온라인 설문조사를 실시하였다. 분석 결과, PMO 기능 및 프로젝트 관리과정 모두 프로젝트 성과에 유의한 영향을 미치는 것으로 확인되었다. 또한 PMO기능을 수행할 때, PMO역량에 따라 프로젝트 성과에 유의한 차이가 존재함이 확인되었다. 따라서 경영진들은 프로젝트 수행 시 프로젝트 성과에 긍정적 영향을 미치는 PMO의 설립을 적극적으로 검토해야 한다. 또한 PMO의 역량에 따라 프로젝트 성과에 차이가 발생하므로 프로젝트를 관리하는 PMO에 충분한 권한을 부여하고 경영진의 지원을 신속하게 함으로써 프로젝트를 성공적으로 수행할 수 있을 것이다.

Comparative Study of Regional Growth and Urban Project Management between Bogotá and Seoul Metropolitan Area (보고타와 서울 대도시권간의 지역 성장과 도시프로젝트 관리 비교연구)

  • Velasco, Vanessa;Gonzalez, David Burbano;Choi, Jun Young
    • Land and Housing Review
    • /
    • v.10 no.2
    • /
    • pp.29-43
    • /
    • 2019
  • Colombia experiences a population growth in their metropolitan areas through an accelerated urbanization process, a housing deficit and a shortage of urban developable land. To solve these problems, the central government developed a national policy for a large-scale housing city development including supra-municipalities planning instruments such as Macroprojects. However, the amount of housing land supplied by this policy is insufficient and additional policies for shortage housing and qualitative deficit are required, particularly in regions with a high concentration of population. The purpose of the study is to compare urban development systems of Colombia and Korea and explore the possibility of applying guidelines to Colombia through i) comparing the capital region cities of the two countries with an asymmetry context method, ii) comparing both urban planning system founding similarities and differences, and iii) suggesting new urban development challenges in the Bogotá metropolitan area based on Korea's new town experience.

S&T Collaboration in Developing Countries: Lessons from Brazilian Collaboration Activities with South Korea

  • Fink, Daniel;Hameed, Tahir;So, Minho;Kwon, Youngsun;Rho, Jae Jeung
    • STI Policy Review
    • /
    • v.3 no.2
    • /
    • pp.92-110
    • /
    • 2012
  • An active policy role is suggested for collaboration that will enhance national level Science and Technology (S&T) capabilities. In contrast, some studies see a limited role of policy support for collaborative S&T research at the individual level (including research groups or institutional levels) due to their self-organizing nature. Two views on S&T collaboration look at different levels but existing research largely ignores the context of developing countries. This paper shows how S&T collaborations between Brazil and Korea have developed over the past two decades. The paper indicates the gaps between initiation and the actual establishment of collaborative research at national and individual levels, differences in the focus areas of research, differences in resources and project planning, and the nature of collaborations. Collaborative research activities at the national level were initiated before the individual level but activated later than the individual level; in addition, the focus areas of research were laid down earlier at the national level with individual collaborations focused on different areas. Project types remained different at each level (i.e. top-down and bottom-up) or with a slightly changing mix. This study suggests appropriate policy measures (such as the timely and effective information collection of activities at different levels and proactive coordination) that could reduce the gaps in the timing and alignment of research areas. This paper also alludes to an evolutionary model to develop S&T collaboration among developing countries.

Development of an outline project cost calculation module for disaster prevention facilities in the living area due to winds and floods (풍수해 생활권 방재시설에 대한 개략 사업비 산정 모듈 개발)

  • Kim, Sol;Lee, Dong Seop;Lee, Jong Jin
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.1
    • /
    • pp.45-52
    • /
    • 2023
  • Due to natural disasters such as heavy rain that occurred in the metropolitan area in August 2022, human casualties and property damage are increasing. Accordingly, the government is making efforts to respond to natural disasters, but due to the absence of related standards and standardized standards, problems such as increased construction costs and deterioration in construction quality for disaster prevention facility maintenance projects are occurring. Accordingly, a rough construction cost estimation module was developed and applied to 25 new pumping stations in Korea. As a result of the analysis, the accuracy of the rough construction cost derived through the module recorded 70% of the detailed design cost, which is 4% higher than the previously used rough construction cost accuracy of 66% by the Ministry of Environment. Accordingly, it is expected that the efficiency of the disaster prevention project can be increased if the developed module is used to calculate the rough construction cost for storm and flood disaster prevention in the future.

A Study on the Multiple Real Option Model for Evaluating Values based on Real Estate Development Scenario (다중 실물옵션을 활용한 시나리오기반 부동산 개발사업 가치평가 연구)

  • Jang, Mikyoung;Ku, Yohwan;Choi, Hyemi;Kwon, Tae-Hwan;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.114-122
    • /
    • 2015
  • Real estate development requires significant amount of capital investment. The project duration has been increased according to its enlarged size. For this reason, cost overrun and time delay are important risk factors that should be managed properly. As a method to hedge the risk, varoius real option methods have been presented. However, conventional project value assesment methods such as NPV(Net Present Value) have weakness to support decision making by reflecting dynamic situations in terms of variation of cost and time. Furthermore, the decision making process is serious of actions rather than discrete event. The purpose of this paper is to present a multiple real option valuation method to overcome the deterministic aspect of real option presented in previous research and practice. The method is developed as following: firstly, to select the model that can be applied in the real estate development project through a survey from previous literature on real options analysis; secondly, to apply data from office development case in order to verify the model by applying conventional real option and multiple real option valuation. According to analysis result, multiple real option provides enhanced values comparing to NPV and single real option.

A Study on the Collaboration of the Function Analysis and Idea Creation Phase with Function Integration FAST(FI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) (통합 기능계통도와 계층적 컨셉모듈을 활용한 기능분석단계와 창조단계의 연계성에 관한 고찰)

  • In, Chi-Sung;NamKung, In-Il;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.355-360
    • /
    • 2006
  • Function analysis and idea creation phase in Value Engineering(VE) Process is applied to manufacturing Industry for developing functions for elements of products, and in construction come to use various components like process, size of project, spaces as well as function itself due to multi-functional aspect. For this reason, VE applications to the construction industry are considered to be less frequent and efficient than to the manufacturing. To resolve this problem, a new technique of Function Integration Fast(HI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) was made for practical integration and sequence of VE job Plan. Two types of function would be defined In this method, first and second function, during the job Plan process, and two function champions be selected for next creation phase process. For verification of consecutiveness of function analysis and idea creation phase for successful VE project implementation, this methodology was tested under design phase in office and IT Multi-functional building project. Make sure the successful application of this process with this method, need to develop the talent of VE experts and team members for process of function analysis and creation phase.

  • PDF