Adjudication in Australia: A Study of Adjudication Activity in New South Wales for 2013/14

  • Brand, Michael C.;Kim, Jinu
    • International conference on construction engineering and project management
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.396-400
    • /
    • 2015
  • The Building and Construction Industry Security of Payment Act 1999 (NSW) (the NSW Act) is a unique form of statutory regulation for the building and construction industry, which gives virtually all industry participants a statutory right to, and a means of recovering, payments for work done under a construction contract. The research aim is to examine current trends in adjudication applications and determinations under the NSW Act. The data used for this study was the collected by the NSW Office of Finance & Services as part of a regular reporting regime for the period from 1 July 2013 and ending on 30 June 2014. With just over 817 adjudication applications having been made over the 2013/14 period, the data indicates that adjudication is being frequently utilized by stakeholders in the NSW building and construction industry as a means of progress payment recovery. Adjudication is proving to be a popular choice for those making claims of less than AU$250,000. Claimants were awarded about 36% of the total of claimed amounts and claimants are generally successful at adjudication in terms of the proportion of the claimed amounts determined in their favour. This is particularly so in relation to claims of less than $100,000, which represents about 70% of the total applications made over the reporting period. The data indicates that adjudication fees are generally modest enough to conclude that adjudication provides claimants across all claim ranges with a relatively inexpensive means of having disputed progress payments determined by an independent adjudicator.

  • PDF

BIM-BASED TIME SERIES COST MODEL FOR BUILDING PROJECTS: FOCUSING ON MATERIAL PRICES

  • Sungjoo Hwang;Moonseo Park;Hyun-Soo Lee;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.1-6
    • /
    • 2011
  • As large-scale building projects have recently increased for the residential, commercial and office facilities, construction costs for these projects have become a matter of great concern, due to their significant construction cost implications, as well as unpredictable market conditions and fluctuations in the rate of inflation during the projects' long-term construction periods. In particular, recent volatile fluctuations of construction material prices fueled such problems as cost forecasting. This research develops a time series model using the Box-Jenkins approach and material price time series data in Korea in order to forecast trends in the unit prices of required materials. Building information modeling (BIM) approaches are also used to analyze injection times of construction resources and to conduct quantity take-off so that total material prices can be forecast. To determine an optimal time series model for forecasting price trends, comparative analysis of predictability of tentative autoregressive integrated moving average (ARIMA) models is conducted. The proposed BIM-based time series forecasting model can help to deal with sudden changes in economic conditions by estimating material prices that correspond to resource injection times.

  • PDF

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • International conference on construction engineering and project management
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

An Analysis on the Characteristics of Work Items for RFID Technology Application Possibility Valuation (RFID 기술적용 가능성 평가를 위한 각 공종별 주요자재 특성분석)

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sang-Yoon;Kim, Yea-Sang;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • 제9권2호
    • /
    • pp.159-169
    • /
    • 2008
  • Recently, domestic construction projects Have become more high-rised, bigger, sophisticated, so necessity of logistics and progress management through application of various management theories has also been increased and development of IT technologies like RFID can help to improve management method, although the existing logistics and progress management studies are applied only to single progress or important material. It is a basic research for integrated framework for logistics and progress management. An analysis on the characteristics of RFID tech was performed for major materials or components of each work item in office building projects. This paper will make foundation of integrated framework for logistics and progress management in construction project, utilizing RFID technology by analysing materials type like materials which can be chased and measured, materials which can be chased and measured by certain methodologies, materials which can be chased and measured by future technologies, materials which are difficult to be chased and measured. So we can effectively control logistics and progress management, appling the optimum RFID technology to each construction project, and we need to study out solution in order to overcome RFID technology limitation through development of specification counterproposal about delicate materials of the RFID technology application.

A Study on Users' Perception of Reference Services in National Archives of Korea (국가기록원 기록정보서비스에 대한 이용자 인식에 관한 연구)

  • Kim, Jihyun
    • Journal of Korean Society of Archives and Records Management
    • /
    • 제12권1호
    • /
    • pp.167-187
    • /
    • 2012
  • This study investigated the perception and experience of users who visited in Seoul office of the National Archives, a branch of the National Archives of Korea(NAK). For collecting data, the study utilized the Researcher Survey Toolkit developed by Archival Metrics Project and revised the questionnaire to reflect services of NAK. Questionnaires completed by 47 users were collected and analyzed, and interviews with one survey respondent and two staff were performed. It was found that the purpose of the visit is mostly to identify records that prove land ownership of users' ancestors. Types of records frequently used were also those concerning lands and forests. User feedback on the staff was generally positive, and users perceived them to be helpful and kind. However, there was an opinion that the staff did not provide accurate information about whether NAK hold records that the user wanted to find. The staff also said that it was challenging to confirm where requested records are located when providing services for users. User evaluation on the usefulness and the ease of use of NAK portal services was not very positive, and it was perceived to be very inconvenient to search in the portal. Overall, users were satisfied with the services of NAK, although some users suggested that services need be provided efficiently, and NAK must clarify the criteria for the non-disclosure of public records.

Study on Improving the System for the Revitalization and Efficient Management of the Local Commercial Area (지역상권 활성화 및 효율적 관리를 위한 제도 개선방안 연구)

  • Kim, Seung-Hee;Kim, Young-Ki
    • Journal of Distribution Science
    • /
    • 제11권5호
    • /
    • pp.55-62
    • /
    • 2013
  • Purpose - This study aims to determine the problems and limitations of the Commercial Area Activation System, which was created by a special law for promoting traditional markets and shopping districts to revitalize and efficiently manage the central commercial area in different regions. We also suggest different options for its improvement. Research design, data, and methodology - We also look into the problems of which is being promoted as a demonstration project, from the aspects of legal text and guidelines. Results - The current commercial area activation system has several problems. First, the establishment of a comprehensive basic plan on the commercial area activation is not a requirement. Second, the benefit principle should be established to prevent the moral laxity of merchants who serve important roles in the main components of the commercial area activation business when they conduct their business. Third, the current special law constrains the commercial management organization, as under the civil law yields a limitation on finding a profitable business model. Fourth, to efficiently, constructing a system that links the other central government businesses and is needed. into a regional development budget or a budget for funding small businesses that the central government can control, which is effective. Further, we offer some suggestions for medium- and long-term policies. First, an integrated coordination mechanism at the central office level should be installed while setting the basic policy to revitalize the Based on this policy, local governments need a system that exclusively based on the after establishing a comprehensive plan for urban regeneration and getting approval from the integration organization. Second, a system that enables an understanding of the problems with business promotion by monitoring the procedure of supporting projects and regularly assessing business achievements is needed. Third, a plan is needed for resolving conflicts between various interested parties that adopts the commercial area activation system for carrying out a total redevelopment of the commercial area where small shops are densely located. A market maintenance project has been conducted as a means to recover our traditional market, which was economically depressed, and to revive the local economy, but it is mostly conducted in the form of reconstruction or redevelopment and represents the interests of landowners and merchants. Thus, it is most likely to lead to a gradual disappearance of traditional markets. Conclusions - This study looks primarily into the problems that appeared in the legal text or the guidelines regarding the direction of improvement of the commercial area activation business that has been going on as a demonstration project since 2011 and suggests some solutions.

  • PDF

A Study on the Improvement of School History Archives Supported by the Office of Education (교육청 지원 학교역사관 운영 개선 방안 연구)

  • Sujeong Kwon;Jihyun Kim
    • Journal of Korean Society of Archives and Records Management
    • /
    • 제24권2호
    • /
    • pp.21-40
    • /
    • 2024
  • This study seeks to analyze the actual operation status of the school history archive, which collects, preserves, and utilizes school history records, and propose improvement strategies. The subjects of this study were divided into unit school history archives established in each school and integrated school history archives, which collect school history records under the jurisdiction of the Office of Education. The types and functions of school history records and school history archives were first identified, and the status of school history archives overseas was investigated. Afterward, interviews were conducted with six unit schools and five Offices of Education to examine the domestic status. The interview questionnaire was structured according to the following aspects: operation status, records and archives management, and archival information services. Based on this, the status and problems of the unit school type and integrated school history archives were identified, and improvement measures in terms of operation, record management, and record information service were proposed. In addition, comprehensive improvement strategies encompassing the unit school and integrated school archives were suggested. The results of this study can serve as useful material for operating and developing school history archives.

Analysis of the Efficiency Technology Transfer Offices in Management: The Case of Spain and Kazakhstan

  • KIREYEVA, Anel A.;TURDALINA, Sharbanu;MUSSABALINA, Dinara;TURLYBEKOVA, Nadira M.;AKHMETOVA, Zauresh B.
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제7권8호
    • /
    • pp.735-746
    • /
    • 2020
  • This research is defined as a study regarding on structured and systematized of existing literature review of the intersection between intellectual property management, management and technology transfer offices (TTOs). It takes a deeper look at requirements within universities, scientific institutions and the business environment should be interconnected with each other. The literature review shows that TTOs have control over the process of knowledge transfer and they have contributed to improving the efficiency of the use of production and human resources. In this paper, authors proposed the methodological tools based on methodology model, which identified success factors for using project management in TTO between two countries - Kazakhstan and Spain. Further, we used methodology is focused on solving the problems of quantitative analysis based on the use of primary data, which allowed us to reach a huge number of respondents without any restrictions, and secondary data from statistical database. Findings and results are summarized at the end of article show that Kazakhstan is following the path of the Spanish experience. However, Kazakhstan can become more successful in commercializing scientific technologies and transferring knowledge and technologies. In turn, Spain can use the data from our analysis to work on barriers and improve the activities of TTOs.

A Research on the development of evaluation model for the government's recognition regarding the program accrediting organizations in Higher Education (고등교육 프로그램 평가인증기관의 정부인정 평가모형 개발에 관한 연구)

  • Kim, Kyung-Soo;Hwang, Myung-Ku;Lee, Tae-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제13권1호
    • /
    • pp.87-98
    • /
    • 2012
  • The Ministry of Education, Science and Technology has been implementing the government's recognition project regarding the program accrediting organizations in Higher Education. This research is to establish an evaluation model for the government's recognition process of the program accrediting organizations, and develop the evaluation categories, items and indices for the model. The research has set the concept for the government's recognition regarding the program accrediting organizations and designed an evaluation model for such organizations. The evaluation model embraces a preliminary evaluation process, assessing an eligibility of the accrediting organizations for the higher education based on the formalities set forth for the government recognition organization accrediting process. It also includes the main evaluation process, which assess the eligibility based on the evaluation standards stipulated in the associated legislation and regulations. In addition, through in-depth verification processes by experts, this research finalized 2 evaluation domains, 5 evaluation categories, 24 evaluation items and 33 evaluation indices.

Evaluation of Agricultural Reservoirs Operation Guideline Using K-HAS and Ratio Correction Factor during Flood Season (수리·수문설계시스템 및 비율보정계수 기법을 활용한 농업용 저수지의 홍수기 운영기준 평가)

  • Jung, Hyoung-mo;Lee, Sang-Hyun;Kim, Kyounghwan;Kwak, Yeong-cheol;Choi, Eunhyuk;Yoon, Sungeun;Na, Ra;Joo, Donghyuk;Yoo, Seung-Hwan;Yoon, Gwang-sik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • 제63권4호
    • /
    • pp.97-104
    • /
    • 2021
  • Despite the practical limitations of calculating the amount of inflow and supply related to the operation of agricultural reservoirs, the role of agricultural reservoirs is gradually being emphasized. In particular, as interest in disaster safety has increased, the demand for preliminary measures to prepare for disasters has been rising, for instance, pre-discharging agricultural reservoirs for flood control. The aim of this study is to analyze the plans for the flood season reservoir operation considering pre-discharge period and water level limit. Accordingly, we optimized the simulation of daily storage using the ratio correction factor (RCFs) and analyzed the amount of inflow and supply using K-HAS. In addition we developed the drought determination coefficient (k) as a indicator of water availability and applied it for supplementing the risk level criteria in the Drought Crisis Response Manual. The results showed that it would be difficult to set the water level limit during the flood period in the situation of little water supply for flood control in agricultural reservoirs. Therefore, it is necessary to operate the reservoir management regulations after measures such as securing additional storage water are established in the future.