• Title/Summary/Keyword: Project Management Office

Search Result 243, Processing Time 0.031 seconds

Calculation of the target revenue water ratio of local waterworks considering economic feasibility (경제성을 고려한 지방상수도 목표 유수율 산정)

  • Donghong Kim;Jaebum Lee;Jungkwan Song;Taeho Choi
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.6
    • /
    • pp.311-324
    • /
    • 2023
  • As an advanced study on the method of calculating the target revenue water ratio of local waterworks through the leakage component analysis method proposed by Kim et al. (2022), this study developed a model to calculate the achievable revenue water ratio within the specified project cost, the required project cost to achieve the specified target revenue water ratio, and the economically appropriate target revenue water ratio level by considering the leakage reduction cost and leakage reduction benefit for each revenue water ratio improvement strategy, and conducted an applicability evaluation of the developed model using actual field data. The procedure for calculating the target revenue water ratio of local waterworks considering economics proposed in this study consists of three stages: physical data linkage model construction, leakage component analysis, and economic analysis, and the applicability was evaluated for Zone H with branch type and the Zone M network type. As a result of the application, it was calculated that approximately 32.5 billion won would be required to achieve the target revenue water ratio of 70% in the Zone H, and approximately KRW 10.5 billion would be required to achieve the target revenue water ratio of 75% in the Zone M. If the business scale of Zones H and M was corrected to 10,000 m3/day of water usage, the required project cost for a 1% improvement in the revenue water ratio of Zone H was calculated to be 0.7642 billion won and 0.4715 billion won for Zone M.

A Qualitative Analysis of Construction Projects From Supply Chain Management Perspective

  • Min Jung-Ung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.80-87
    • /
    • 2004
  • This paper presents an analysis of construction project management from supply chain management perspective to gain insight from all constituents and to identify areas of improvement. In order to suggest opportunities for improvement, interviews with the members of a typical urban office building project in US were held. Based on that, a qualitative analysis of construction projects is presented. Focusing on electrical and mechanical sub-systems, this study illustrates the roles of subcontractors, suppliers, distributors, and manufacturing representatives as well as the complexity that a general contractor fares in managing its supply chain. The author$^{\circ}\phi$s recommendations are focused on process restructuring and automation, which include some quantifiable performance measures, incentives, and their alignment with each other

The Taste-alleys Pilgrimage in Cheonyeon·Chunghyeon Seodaemun-gu: A Semantic Network Analysis of the Hashtag and Cooking Class Operation of Industry-academic Cooperation (서대문구 천연·충현 지역 맛골목 순례: 해시태그 단어의 의미연결망분석과 지역 대학연계 쿠킹클래스 운영)

  • Kyung Soo Han;Ji Eun Min;Ji Hyun An;Jin Hee Kim
    • Journal of the FoodService Safety
    • /
    • v.4 no.1
    • /
    • pp.35-41
    • /
    • 2023
  • This study was based on the results of the study of 'Cheonyeon and Chunghyun Taste Alley Pilgrimage- Introducing Hidden Restaurants in Our Town', which was adopted as a project to revitalize urban regeneration as part of the Cheonyeon and Chunghyun Urban Regeneration New Deal project. This study was conducted in total of two stages, as a first step, the commercial district of Seodaemun Station was analyzed by analyzing the hashtag (#) mentioned along with the "Seodamun Station Restaurant" on Instagram from 2015 to 2020. As a result of the analysis, it was found to be an office commercial district related to "office workers", and it was found to be a commercial district with the characteristics of "small but certain happiness" where you can find hidden restaurants in front of your house. Based on the characteristics of these commercial districts, five stores utilizing the characteristics of the region were selected and cooking classes were conducted for students of Kyonggi University, who are local residents. The purpose of this study was to revitalize the aging Seoul city and contribute to the formation of positive relationships between local residents and merchants through cooking classes. In addition, the process was produced as digital media content and used as local promotional materials.

A Study on the Improvement of the Management Plan of City Master Planning as ODA Project (ODA 사업으로서 도시 마스터플랜 수립 사업의운영방식 개선에 관한 연구)

  • Kim, Yong-Jin;Kim, Seong-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2799-2806
    • /
    • 2015
  • This study aims to find out the better management plan for city master plannning as an ODA to accomplish the economic effect. For this study, the "Hai Phong New Town Development Project" and the "Modification of Hue City's Master Plan" were studied. The result of the case study shows that there was difference between the two projects which was the status of following projects. While those two projects were highly acclaimed, only Hue project had several projects. This is because of the understanding degree on ODA project of participants, the distinct characteristics of the recipient country; Vietnamese local and central government, and the difference of each project's main purpose. And the result of FGI shows that to accomplish economic effects of master planning project as ODA, the enthusiastic approach to find out following project from the beginning step of the master planning, the experience of project manager on ODA, the close association with the recipient country, and the positive support from the Koica especially, the local office were crucial.

CONSTRUCTION BUSINESS PROCESS AUTOMATION USING WORKFLOW TECHNOLOGY

  • Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.569-574
    • /
    • 2005
  • This paper presents the core technology of Construction Business Process Automation to model and automate construction business processes. Business Process Reengineering (BPR) and Automation (BPA) have been recognized as one of the important aspects in construction business management. However, BPR requires a lot of efforts to identify, document, implement, execute, maintain, and keep track thousands of business processes to deliver a project. Moreover, existing BPA technologies used in existing Enterprise Resource Planning (ERP) systems do not lend themselves to effective scalability for construction business process management. Application of Workflow and Object Technologies would be quite effective in implementing a scalable enterprise application for construction community. This paper present the technologies and methodologies for automating construction business processes by addressing how: 1) Automated construction management tasks are developed as software components, 2) The process modeling is facilitated by dragging-and dropping task components in a network, 3) Raising business requests and instantiating corresponding process instances are delivered, and 4) Business process instances are executed by using workflow technology based on real-time simulation engine. This paper presents how the construction business process automation is achieved by using equipment reservation and cancellation processes simplified intentionally.

  • PDF

Financial Feasibility Study by Considering Risk Factors for High-Rise Development Project (초고층 개발사업의 리스크 요인을 고려한 재무적 타당성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.3-16
    • /
    • 2017
  • Forecasting cash flow is very important but is difficult and complicated to analysis in high-rise development projects. And An expected value which was forecasted on the early stage is likely to fluctuate due to uncertainties around such complicated huge project to consider the probable uncertainty. There are not objectified method which are able to cope with uncertainty of project, and feasibility study based on selected financial analysis does not include liquidity of cash flow. Through such a stochastic method, developer can cope with cash flow fluctuation and set up a financial plan. Also this study is meaningful for laying the foundation for high-rise development project and feasibility study as well as the suitability and accuracy of feasibility study. Analysis showed that NPV and IRR include residential apartments shows surplus revenue as return of apartments offset deficit of hotel and office. Factors influencing the project feasibility for high-rise development project are sales account of $1^{st}$ year and annual vacancy rate of office.

R&D Quality Assurance : General Types and Key Quality Elements (연구개발 품질보증 적용유형 분석 및 핵심 연구품질요소 도출)

  • Kim, Deok-Hwan;Kang, Mi-Sun;Ji, Doo-Hwan;Choi, Sang-Jin
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.4
    • /
    • pp.581-599
    • /
    • 2013
  • Purpose: This study aims to analyze general types of R&D Quality Assurance(R&D QA) and to identify key quality elements for R&D QA. R&D QA is defined as all the planned and systematic actions to verify whether R&D processes are conducted in a proper manner and the results of R&D fully satisfy customers' requirements. Methods: The existing R&D QA guidelines and the some cases were reviewed. From the review, three general types are analyzed and thirteen key quality elements are identified. Then, the survey on the eighteen domestic experts has been conducted for prioritization of the identified elements. Results: As the result of this study, three types for R&D QA based on quality elements, standard process, and final evaluation are analyzed. Related to the first type, thirteen quality elements, e.g., administrative plan, project plan, process management and so on, are identified and prioritized. Conclusion: This study contributes to develop the baseline for R&D QA including the types and the key quality elements. It may be helpful for the institute that has an interest adopting R&D QA.

A Study on development of Assesment System for BTL Project;Prediction of Reasonable Construction and Maintenance Cost in Education Facilities. (합리적 교육시설물 유지보수 및 공사비 예측을 위한 BTL 적격성 평가 시스템 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.111-116
    • /
    • 2006
  • The objective of this research is to develop an assesment system for BTL Project. A new method for the prediction of construction and maintenance cost in the educational facilities has been considered and under development by the authors. This paper explains the current BTL assesment method used by most local district office of education and lists its potential problems. Main conceptual modules in the new Assesment System are shown in this paper. Also, viable results of each module are discussed in this paper.

  • PDF

A Study on the New RFP for the PMO-based Development of Next-Generation MIS (PMO 기반의 차세대 MIS개발을 위한 신RFP 작성 연구)

  • Han, Moonhee;Kim, Yousin;Kim, Dae Ho
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.11
    • /
    • pp.585-594
    • /
    • 2016
  • Information system development projects are increasingly enlarging in size and are becoming more complex in the development environment. The traditional approaches for the development of information system, however, haven't shown the expected performances in the management for them and many researchers have been trying to find a new approach for overcoming this challenges. And one of the new approaches is the PMO and it is introduced to solve the problems of project management and the related organizational, technical, and administrative problems. This study attempted to find the efficient information system establishment plan. In particular, this study wants to research the practicality of PMO and the detailed utilization plans. As a result, this study proposes the structure of project implementation, the requirements, the direction of the basic system design, the scope of system development, and the budgeting for the systems. It is expected to contribute the successful implementation of the project.

INTRODUCTION OF THE SIMC PROJECT

  • Chae, Gee-Ju;Cho, Seong-Ik;Park, Jong-Hyun;Jo, Kwan-Bok
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.356-359
    • /
    • 2006
  • The high prices and lack of information for satellite images prevent researchers from studying remote sensing and most non-professional people can't have the simple and easy solutions for the manipulation of satellite images. 'Satellite Imagery Information Management Center'(SIMC) project which is promoted by ETRI (Electronics and Telecommunications Research Institute) from 2002 to 2005 in Korea have the purpose to provide the satellite images freely to the public domain and the solutions for the above mentioned problems. Our project have the following five systems; Data Acquisition System, Data Preservation System, Integrated Solution System, Technology Development System, Operation Plan System. Data Acquisition System collects the satellite images such as LANDSAT, IKONOS, etc. Data Preservation System consists of database which registers the diverse satellite images. Integrated Solution System gives the user of public domain for the web service which search, order and transfer the satellite images. Technology Development System has the many processing technologies for the satellite images. Finally, the Operation Plan system has the role to plan the future of our SIMC project. In this paper, we will give the result of SIMC Project for each five systems during the fast four years from 2002 to 2005.

  • PDF