• 제목/요약/키워드: Project Life-cycle

검색결과 479건 처리시간 0.027초

Exploring a BIM-based approach of project management

  • MA, Xiaozhi;XIONG, Feng;DONG, Na
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.241-244
    • /
    • 2015
  • Within the building industry, building information modelling has been widely applied among different organizations, disciplines and project phases. In order to achieve coordination and synergy collaborative effort, it demands organized information flow and communication for effective implementation of project management through the construction process. Although many BIM researches provides solutions for project management, few efforts have involved the whole life-cycle process of project. In this article, BIM-based project management relying on a series of applications of BIM technology was introduced by coupling management requirement of a project with BIM. Through adopting BIM to the life-cycle management of the project and incorporating BIM applications to project management practice, we have developed a BIM-based project management approach that specialize in integrated BIM chain and interface-supporting system. At the end, the developing process of BIM-based project management approach is concluded.

  • PDF

정보시스템 수명주기에 인프라가 미치는 영향관계에 대한 연구 (A Study on the Effects of ICT Infrastructure Cost on Information System Life Cycle)

  • 문흥근;김정호;이석준;박성식
    • 정보화연구
    • /
    • 제10권3호
    • /
    • pp.323-334
    • /
    • 2013
  • 사업기획, 프로젝트 관리, 품질 등 정보시스템의 구축에 관한 연구는 많이 수행되었다. 정보시스템의 수명주기에서 신규투자는 20%의 자원 비중을 차지하고 있고, 유지보수와 인프라가 자원 비용의 80%를 차지하고 있어 유지보수에 대한 관심과 연구가 매우 필요하다. 그동안의 정보시스템 경제적 수명주기 연구는 유지보수 비용을 활용하여 진행되었으며, 인프라 비용의 반영이 정보시스템의 경제적 수명주기에 어떤 영향을 주는지에 대한 연구가 없었다. 본 연구는 정보시스템 수명주기 비용의 40%를 차지하고 있는 인프라 비용을 경제적 수명주기 산정에 어떻게 반영해야 하는지, 그리고 인프라 비용 반영에 따른 정보시스템의 경제적 수명주기 변화에 대하여 살펴보았다.

건설 생애주기를 고려한 BIM 기반의 PMIS 활용 (Application of BIM-based PMIS Considering Construction Life-Cycle)

  • 문성우;권기남;김상도;정준호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.654-657
    • /
    • 2008
  • 최근 건설 프로젝트가 대형화 복잡화됨에 따라 단일 프로젝트의 건설 사업비 규모가 증가하는 반면 IT 산업의 발달과 더불어 건설현장에서 발생하는 다양한 자료 축적이 쉬워지고 있다. 따라서 건설공사 라이프싸이클 관점에서 축적된 실적 데이터를 활용하여 생산성을 향상시키기 위한 연구가 활발히 진행 중이다. 최근 건설사업관리를 위해서 많이 사용하고 있는 PMIS(Project Management Information System)는 시공단계에서 데이터의 축적과 활용에 많은 편리함을 준다. 그러나 대부분의 PMIS는 시공단계에 제한되어 있으며 기획, 설계 및 유지관리의 단계까지는 적용되지 않고 있는 실정이다. 본 논문에서는 기획, 설계, 시공, 유지보수 단계까지 관리를 위한 효율적인 하나의 방안으로 BIM(Building Information Modeling) 기반의 PMIS인 BPMS(BIM-based Project Management System)를 제시한다. BPMS는 대상물의 설계 및 시공정보를 포함하여 건설 생애주기 관점에서 사업관리를 지원하고자 개발되고 있다.

  • PDF

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

형상관리기법을 활용한 대형 프로젝트 정보화 전략개발 (A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project)

  • 원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

프로젝트 환경과 특성에 따른 소프트웨어 개발 경로 선정 알고리즘 (Algorithm selecting Software development route suitable for Project environment and characteristics)

  • 정병권;윤석민
    • 정보처리학회논문지D
    • /
    • 제13D권1호
    • /
    • pp.87-96
    • /
    • 2006
  • 본 논문은 프로젝트 환경과 특성을 고려하여, 소프트웨어 개발 경로를 커스터마이징 하는 방법을 설계한 것이다. 개발 경로 선정 기준은 ISO/IEC TR 15721 Information Technology Guide for ISO/IEC 12207(Software Life Cycle Processes), ISO/IEC 15504 Information technology - Process assessment의 프로세스 내용에 기반 한 10개의 영역 특성이다. 10개의 영역 특성은 프로젝트 환경과 특성을 반영한 것이며, 프로젝트 개발 경로 선정 항목들을 정의한다. 프로젝트 환경과 특성 항목인 10개 영역 특성 항목을 이용하여 소프트웨어 개발 프로세스를 선정하는 알고리즘을 제시한다. 본 논문에서 제안한 소프트웨어 개발 경로를 커스터마이징 하는 방법을 평가하기 위하여 소프트웨어 개발 경로를 커스터마이징 하는 방법을 반영한 개발 경로 선정 시스템을 가지고 웹 기반 시스템 개발 프로젝트를 적용한다. 그러나 입증된 수작업 프로젝트 경로 프로세스와 시스템에서 출력된 프로젝트 경로 프로세스가 차이가 난다 차이가 나는 주원인은 산출물이 서로 합쳐졌거나, 명칭이 바뀌었기 때문이다. 효과로는 소프트웨어 개발 프로젝트 환경과 특성에 적합한 경로 프로세스를 용이하게 선정한다.

가상 건설 시스템 비전과 구축 방향 (A vision and strategy for developing virtual construction system)

  • 최철호;진상윤;김재준;신현목;이광명;윤수원
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Cradle to Gate Emissions Modeling for Scheduling of Construction Projects

  • Sharma, Achintyamugdha;Deka, Priyanka;Jois, Goutam;Jois, Umesh;Tang, Pei
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.975-983
    • /
    • 2022
  • This paper presents an innovative way of integrating scheduling and project controls with the environmental impact of a construction project to track, monitor, and manage environmental emissions at the activity level. As a starting point, scheduling and project controls help monitor the status of a project to provide an assessment of the duration and sequence of activities. Additionally, project schedules can also reflect resource allocation and costs associated with various phases of a construction project. Owners, contractors and construction managers closely monitor tasks or activities on the critical path(s) and/or longest path(s) calculated through network based scheduling techniques. However, existing industry practices do not take into account environmental impact associated with each activity during the life cycle of a project. Although the environmental impact of a project may be tracked in various ways, that tracking is not tied to the project schedule and, as such, generally is not updated when schedules are revised. In this research, a Cradle to Gate approach is used to estimate environmental emissions associated with each activity of a sample project schedule. The research group has also investigated the potential determination of scenarios of lowest environmental emissions, just as project managers currently determine scenarios with lowest cost or time. This methodology can be scaled up for future work to develop a library of unit emissions associated with commonly used construction materials and equipment. This will be helpful for project owners, contractors, and construction managers to monitor, manage, and reduce the carbon footprint associated with various projects.

  • PDF

식품산업에 있어서 포장두부의 전과정평가 사례연구 (Case Study on the Life Cycle Assessment of the Packaged Bean-curd in Food Industry)

  • 황태연;윤성이
    • 한국유기농업학회지
    • /
    • 제15권3호
    • /
    • pp.277-290
    • /
    • 2007
  • This study has been analyzed an execution example of the life cycle assessment on the packaged bean-curd of P company, the first case of the regular life cycle assessment on the processed foods in Korea and considered on the significance and directions of the life cycle assessment on the foods. It is possible to divide the potential environmental impact through the life cycle of the bean-curd into six categories and analyze the environmental impact on the production, use and disposal phases of the product. The values of each environmental impact have been quantified from the strength of the potential impact fur the corresponding category of impact. In the future, it is expected that the result of the lift cycle assessment will be increasingly used fur many areas such as Climate Change Convention and ISO22000, etc. and it is required to promote a project to make database through the assessment on the individual corps or types of businesses for it from now on.

  • PDF