This study purpose is seeing that the independent standard sufficiently reflecting the characteristics of the school facility as the basic material needed to calculate the maintenance and repair expenses is needed to make a more realistic and valid qualitative VFM analysis of the school BTL project. this study attempted to develop the standard for the repair cycle and rate and economic year of the school facility. The quantitative VFM analysis should be conducted based on the repair cycle and repair rate proper to the school facility, not the residential space, when calculating the maintenance and repair expenses of the operating expenses of the school facility. An attempt was made to calculate the repair cycle, repair rate and economic life of 114 component materials of the school facility judged to be able to explain the school field best. And it was confirmed that the repair and maintenance expenses more is needed to be set by about 35% than the existing maintenance and repair expenses.
건설산업에서 안전관리가 오랫동안 중요한 화제중의 하나로 대두되고 있으며 수많은 노력에도 불구하고 여전히 타 산업에 비해 높은 재해율을 보이고 있다. 이와 관련되어 많은 연구들이 진행되었으며, 대부분 시공자 또는 시공단계를 중심으로 진행되었다. 그러나 사업초기단계가 건설안전에 미치는 영향이 가장 높고 발주자 등 사업초기단계의 의사결정자들이 중요한 작용을 함에도 불구하고, 아직까지 건설사업 생애주기를 포괄하는 안전관리체계가 미흡한 실정이다. 게다가 건설사업에서 방대한 정보가 생성되지만, 이러한 정보들은 각 생애주기를 거듭할수록 정보들의 가치가 증가하는 반면에 비효율적인 측면을 보이고 있다. 이는 참여자들 간의 부족한 정보 공유 및 전달과 미흡한 표준으로 인한 것으로 판단되며, 이는 또한 정보가치들의 손실을 야기한다. 따라서 본 연구에서는 건설산업 측면에서 안전관리 정보이양의 효율성을 분석하는 것을 목적으로 하며, 이를 위해 우선적으로 건설안전 정보를 체계적이고 효율적으로 관리 및 활용하기 위한 안전관리 Framework을 '안전관리 업무기능', '건설사업 생애주기', '산업위계'를 포괄하여 제안하고, '안전관리 업무기능'을 계층적 구조로 5개의 대분류, 13개의 중분류, 32개의 소분류로 세분화함으로써 Framework을 구체화하였다. 다음으로, 안전정보이양의 효율성을 분석하기 위해 '업무기능의 중요도'와 '정보이양의 효율성'을 평가지표로 설정하고 전문가 인터뷰를 통해 평가를 실시하였다. 본 연구결과는 건설산업에서 안전관리를 보다 체계적이고 효율적으로 구현하는 기반을 마련하고 나아가 안전관리 역량을 강화하기 위한 기초자료로의 활용을 기대한다.
The planning phase of construction project success or failure of the enterprise decision the 1st dangerous duration which occurs very there is a possibility of making with the phase which is important, of construction project in life cycle most many risk. But the risk management from planning phase well does not become accomplished is the actual condition from existing construction project. Consequently, it classifies the risk event from project initial planning phase of construction project from this study which probably is substantial risk event the possibility of accomplishing from a planning phase successfully in order to be.
In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.
Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.506-513
/
2009
The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.
Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.621-626
/
2005
Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.
The 6th International Conference on Construction Engineering and Project Management
/
pp.718-719
/
2015
As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.621-628
/
2011
Health and safety in the construction industry continue to fall behind many industries despite much effort to improve the status. A considerable amount of research has been conducted to try and contribute to addressing the problem of health and safety (H&S) in the construction industry. A number of studies have looked at the role of various construction project stakeholders and their contribution to H&S. However there is no clear identification of the extent to which various stakeholders could contribute and therefore influence the outcome of H&S on construction projects. In view of the above, the current Delphi study went a little bit further and sought to establish the impact significance of construction clients and designers on H&S. This paper will present findings from the study which is the impact significance of clients and designers on H&S consideration throughout the project life cycle.
Since the 1990's the fleet of the Dutch Railways showed a dramatic decrease in wheel tyre life. This lifetime reduction led to an unacceptable increase in life cycle costs. Therefore Lloyd's Register Rail has proposed to NedTrain to investigate the possibilities of improving the wheel tyre life. Three improvements were determined as most promising and relatively easy to achieve: - Profile optimisation for Rolling Contact Fatigue (RCF) reduction - a new wheel profile has been developed with a better resistance against rolling contact fatigue of the wheel tread. The profile has been implemented on single deck intercity trains and shows an increase in wheel tyre life of 30%. - Selection of improved wheel tyre materials - combining information from literature and experiences of manufacturers five alternative wheel tyre materials have been selected and are now being tested in practice. - Optimisation of the maintenance strategy - an alternative, preventative maintenance regime has been developed. With this Scraping regime, during short term maintenance every wheel is reprofiled. Higher mileages are reached and savings on life cycle costs up to 50% and more have been achieved. Unplanned maintenance goes down with $30{\sim}60%$. The results from field tests, using a reference group for comparison, and preliminary results after implementation show that the increase in wheel tyre life that is achieved with this project is significant. The results will continue to be monitored using the asset management tool 'Wheel Watch', that was specially developed for this project and is also described in this paper.
최근 오픈 사이언스 등 연구 환경이 변화함에 따라 대학도서관에서 수행하는 연구지원서비스의 영역도 넓어지고 있다. 특히 해외를 중심으로 연구 수명주기에 대한 명확한 이해를 통해 이에 맞는 대학도서관의 연구지원서비스 개발의 필요성이 강조되고 있다. 본 연구는 대학도서관이 연구 수명주기의 모든 단계를 체계적으로 지원할 수 있는 연구지원서비스를 개발할 때 참고할 수 있는 시사점을 제공하는 것을 목적으로 하였다. 이를 위해 선행연구 분석을 통해 연구 수명주기를 '계획', '프로젝트', '출판', '보존', '배포'의 다섯 단계로 구분하고 각 단계에서 제공하고 있는 연구지원서비스를 미국과 국내 대학도서관 사례를 중심으로 조사하여 시사점을 도출하였다. 사례에서 얻은 시사점을 바탕으로 국내 대학도서관이 연구 수명주기의 각 단계를 체계적으로 지원할 수 있는 서비스 방안을 제안하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.