활동기준예방에 의한 프로젝트 품질코스트 최소화 (Minimizing Project Quality Costs by Activity-Based Prevention)

  • 김종열;강창욱;황인극
    • 산업경영시스템학회지
    • /
    • 제34권4호
    • /
    • pp.89-97
    • /
    • 2011
  • Traditional quality control for manufacturing or service sector is not suitable for the quality control of a project as the project is one-time task constrained by time, cost, and quality. To meet the internal and external customers' requirements, quality costs approach to the project will be effective. Hence, we propose PONC (price of nonconformance) estimation procedure and a mathematical model, which are focused on activity-based prevention in the execution step and warranty step of EPLC (extended project life cycle). This procedure and model will help project manager develop preventive action plan for project quality costs minimization from nonconformance risk activities and PONC estimates information.

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

건설 생산의 Life Cycle을 고려한 효율성 측정방안 (An Approach on Life Cycle Based Efficiency Measurement in Construction Industry)

  • 정순오;윤수원;진상윤;김예상;박지훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.608-611
    • /
    • 2004
  • 건설 프로세스에서 효율성은 프로젝트의 성패를 좌우하는 중요한 요인 중의 하나이다. 하지만 기존의 생산성 향상 방안들은 1인당 매출과 같이 단순히 결과 위주의 지표를 중심으로 프로젝트를 관리함으로써 많은 변화 요인을 가지고 있는 건설 산업을 특성을 반영하는데 한계를 가지고 있으며, 특히 다수의 참여자에 의해 여러 단계로 진행되는 건설 프로젝트의 Life cycle 상에서 각 공종별 생산성 측정 및 관리, 그리고 생산성 저하의 원인을 도출하는데 한계를 가지고 있다. 따라서 본 연구는 결과 위주의 성과측정 방법인 생산성 개념을 보완하기 위해 프로젝트의 Life cycle의 각 단계별 정성적 평가를 포함하는 건설 효율성 개념을 제안하고 이를 측정하는 방법론을 제시하였으며, 초고층 빌딩의 커튼월 프로세스를 대상으로 제안한 모델을 적용하져다.

  • PDF

eWorks21: 건설프로젝트협업시스템의 개발 (The Development of a Construction Project Collaboration System: eWorks21)

  • 구상회;최성철
    • 한국전자거래학회지
    • /
    • 제6권3호
    • /
    • pp.149-161
    • /
    • 2001
  • Construction and engineering is one of the world largest industry. Yet, it Is one of the most inefficiently operated industry. Since buildings are not constructed by mass production, construction projects usually require intense communication and collaboration between participants, who are usually widely dispersed. That is the main reason for the inefficiency. eWorks21 that we developed in this research, is a project management system that can improve communication and collaboration among project participants using the Internet. eWorks21 can reduce project life-cycle, costs, and increase revenue, resource utilization, controls, transparency, and competitiveness, which will eventually provide infrastructure for knowledge management of construction projects. In this research, we classified currently available project collaboration systems, and analyzed the benefits gained by using project collaboration systems. Then we describe the implementation of eWorks21, and discuss employment and utilization strategies of project collaboration systems.

  • PDF

Advanced Work Packaging (AWP) in Practice: Variables for Theory and Implementation

  • Jung, Youngsoo;Jeong, Yeheun;Lee, Yunsub;Kang, Seunghee;Shin, Younghwan;Kim, Youngtae
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.201-206
    • /
    • 2020
  • Diversification of project delivery methods (PDM) under ever-changing construction business environment has significantly changed the role of project participants. Active efforts to effectively sharing the roles and responsibilities have been observed in the project management offices (PMOs) among owner/operator organizations as well as engineering, procurement, construction and maintenance (EPCM) firms. In order for being effective in a holistic way throughout the project life-cycle, a PMO needs to have 'adequate management skills' as well as 'essential technical capabilities' in cooperating with many different participants. One of the well-known examples of the PMO's tool to support these skills and capabilities is the effective 'work packaging (WP)' that serves as a common basis integrating all relevant information in a structured manner. In an attempt to enhance the construction productivity, the concept of 'advanced work packing (AWP)' has been introduced by Construction Industry Institute (CII). The AWP enables productivity to be improved by early planning of construction packages in the design phase "with the end in mind". The purpose of this study is to identify and evaluate the 'variables' of advanced work packing (AWP) for life-cycle information integration. Firstly, an extended concept of advanced WP based on the CII AWP was defined in order to comprehend many different issues of business functions (e.g. cost, schedule, quality, etc.). A structured list of major components and variables of AWP were then identified and examined for practical viability with real-world examples. Strategic fits and managerial effectiveness were stressed throughout the analyses. Findings, implications and lessons learned are briefly discussed as well.

  • PDF

THE RESEARCH OF CONSTRUCTION PROJECT MATERIALS REQUIREMENT SYSTEM

  • Pan Nai-Hsin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.764-767
    • /
    • 2005
  • In the construction industry, materials management is one of the most important components in construction engineering life cycle. Materials management optimization is one of the research subjects in the field of construction management. In the materials management system of a construction project, the suitability of selecting procurement planning strategy will influence the result of project completion. This study conducts literature review at first and also refers the related issue in other industry's application. Associated with the characteristics of construction project in civil engineering and the concept of object oriented design applied in the materials management, this research is aimed to establish a construction materials requirement preliminary system.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF