• Title/Summary/Keyword: Project Life-cycle

Search Result 479, Processing Time 0.027 seconds

Factors Affecting the BIM Acceptance of Construction Managers (건설사업관리자의 BIM 수용에 영향을 미치는 요인 연구)

  • Chung, Yongche;Chin, Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.11-23
    • /
    • 2015
  • Construction Management(CM) and Building Information Management(BIM) have a lot in common that they need to establish a cooperation system among different disciplines and promote smooth communication among project stakeholders throughout the project life-cycle. BIM can be an effective information management tool for CM's business and improve their service value. However, BIM uses by Construction Managers(CMr) are very limited. The objective of this study is to analyze the intention of CMrs to adopt BIM and establish effective BIM use strategy in the CMr's point of view. This study utilizes Technology Acceptance Model(TAM) as a research method, and the results show that 1) CMrs think it is more important whether BIM is required to be adopted in their business process at the social or industry level than that BIM can improve their personal competence, recognition, and impressions through their voluntary BIM adoption; 2) that CMrs think it is important to figure out business processes where BIM can be smoothly incorporated; and 3) that CMrs hesitate the use and trial of BIM in their realworld business although they agree that BIM needs to be eventually adopted in their business in the future. Based on these results, directions for establish a strategy for BIM adoption were proposed at the CMr's point of view

HOW TO DEFINE CLEAN VEHICLES\ulcorner ENVIRONMENTAL IMPACT RATING OF VEHICLES

  • Mierlo, J.-Van;Vereecken, L.;Maggetto, G.;Favrel, V.;Meyer, S.;Hecq, W.
    • International Journal of Automotive Technology
    • /
    • v.4 no.2
    • /
    • pp.77-86
    • /
    • 2003
  • How to compare the environmental damage caused by vehicles with different foe]s and drive trains\ulcorner This paper describes a methodology to assess the environmental impact of vehicles, using different approaches, and evaluating their benefits and limitations. Rating systems are analysed as tools to compare the environmental impact of vehicles, allowing decision makers to dedicate their financial and non-financial policies and support measures in function of the ecological damage. The paper is based on the "Clean Vehicles" research project, commissioned by the Brussels Capital Region via the BIM-IBGE (Brussels Institute for the Conservation of the Environment) (Van Mierlo et at., 2001). The VriJe Universiteit Brussel (ETEC) and the universite Libre do Bruxelles (CEESE) have jointly carried out the workprogramme. The most important results of this project are illustrated in this paper. First an overview of environmental, economical and technical characteristics of the different alternative fuels and drive trains is given. Afterward the basic principles to identify the environmental impact of cars are described. An outline of the considered emissions and their environmental impact leads to the definition of the calculation method, named Ecoscore. A rather simple and pragmatic approach would be stating that all alternative fuelled vehicles (LPG, CNG, EV, HEV, etc.) can be considered as ′clean′. Another basic approach is considering as ′clean′ all vehicles satisfying a stringent omission regulation like EURO IV or EEV. Such approaches however don′t tell anything about the real environmental damage of the vehicles. In the paper we describe "how should the environmental impact of vehicles be defined\ulcorner", including parameters affecting the emissions of vehicles and their influence on human beings and on the environment and "how could it be defined \ulcorner", taking into account the availability of accurate and reliable data. We take into account different damages (acid rain, photochemical air pollution, global warming. noise, etc.) and their impacts on several receptors like human beings (e.g., cancer, respiratory diseases, etc), ecosystems, or buildings. The presented methodology is based on a kind of Life Cycle Assessment (LCA) in which the contribution of all emissions to a certain damage are considered (e.g. using Exposure-Response damage function). The emissions will include oil extraction, transportation refinery, electricity production, distribution, (Well-to-Wheel approach), as well as the emission due to the production, use and dismantling of the vehicle (Cradle-to-Grave approach). The different damages will be normalized to be able to make a comparison. Hence a reference value (determined by the reference vehicle chosen) will be defined as a target value (the normalized value will thus measure a kind of Distance to Target). The contribution of the different normalized damages to a single value "Ecoscore" will be based on a panel weighting method. Some examples of the calculation of the Ecoscore for different alternative fuels and drive trains will be calculated as an illustration of the methodology.

The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle - (공공발주자 의사결정에 미치는 가치공학(VE)의 영향력 분석 - 프로젝트 생애주기를 중심으로 -)

  • Park, Jongsoon;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.12-20
    • /
    • 2015
  • The public employers are faced the mounting importance of decision process to settle the optimum VE delivery system of such public facilities buildings and etc. The elements of decision process of the public employer are formed in the various relationships of the concerned and when the projects are coming into effect, the decision process in the VE delivery method and the selection of contractor will be the name of the game. The decision process in the VE delivery method and the selection of contractor are created a case to be one and the same as well as initiates a consistency for the performance. However, the function and role of the public employer are projective accordingly to the organization of employer and the employer especially no system is equal to the capability of perfect evaluation and verification of the ability of the employer. Especially the lowest bidder policy that started with justification to increase the competitiveness and technical capability of the contractors through the completion in between contractors has been providing the hotbed for insolvency, irregularity and irrationality as a result. From this point of view it is declared that the buildup the edifice of supporting system in the process of decision to recover the mutual trust and respect of the concerned in the VE delivery system with the technostress and the systematization based on drawing the elements which affect the decision process of public employer.

Design of Interface between 3D Object Model and Structure Analysis Program (3D 객체 모델과 구조해석 프로그램의 인터페이스 설계)

  • Park, Jae-Geun;Kim, Min-Hee;Lee, Kwang-Myong;Choi, Jung-Ho;Shin, Hyun-Mock
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.21 no.3
    • /
    • pp.247-252
    • /
    • 2008
  • Recently, the virtual construction system in which project participants efficiently share and control the information throughout the life-cycle of construction project using 3D object models is being developed all over the world. In this paper, a design of interface between 3D object model of structures and structural analysis system that is essential for the analysis and design of civil structures in the virtual space is treated. The relation parametric modeling technique that is needed to make the 3D object models and the construction method of product breakdown structure(PBS) that considers the several parameters for the structural analysis are presented. PBS is built so that it is possible to extract needed attribute information from 3D object model and to apply it to the structural analysis. Design methodology for interface program is proposed that several numerical values determined by the cooperative work same as structural analysis are delivered to 3D object models without additional work. An interface program between 3D object models and structural analysis system developed based on the proposed method would be effectively used to develop virtual construction system.

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.

Strategic Issues in Managing Complexity in NPD Projects (신제품개발 과정의 복잡성에 대한 주요 연구과제)

  • Kim, Jongbae
    • Asia Marketing Journal
    • /
    • v.7 no.3
    • /
    • pp.53-76
    • /
    • 2005
  • With rapid technological and market change, new product development (NPD) complexity is a significant issue that organizations continually face in their development projects. There are numerous factors, which cause development projects to become increasingly costly & complex. A product is more likely to be successfully developed and marketed when the complexity inherent in NPD projects is clearly understood and carefully managed. Based upon the previous studies, this study examines the nature and importance of complexity in developing new products and then identifies several issues in managing complexity. Issues considered include: definition of complexity : consequences of complexity; and methods for managing complexity in NPD projects. To achieve high performance in managing complexity in development projects, these issues need to be addressed, for example: A. Complexity inherent in NPD projects is multi-faceted and multidimensional. What factors need to be considered in defining and/or measuring complexity in a development project? For example, is it sufficient if complexity is defined only from a technological perspective, or is it more desirable to consider the entire array of complexity sources which NPD teams with different functions (e.g., marketing, R&D, manufacturing, etc.) face in the development process? Moreover, is it sufficient if complexity is measured only once during a development project, or is it more effective and useful to trace complexity changes over the entire development life cycle? B. Complexity inherent in a project can have negative as well as positive influences on NPD performance. Thus, which complexity impacts are usually considered negative and which are positive? Project complexity also can affect the entire organization. Any complexity could be better assessed in broader and longer perspective. What are some ways in which the long-term impact of complexity on an organization can be assessed and managed? C. Based upon previous studies, several approaches for managing complexity are derived. What are the weaknesses & strengths of each approach? Is there a desirable hierarchy or order among these approaches when more than one approach is used? Are there differences in the outcomes according to industry and product types (incremental or radical)? Answers to these and other questions can help organizations effectively manage the complexity inherent in most development projects. Complexity is worthy of additional attention from researchers and practitioners alike. Large-scale empirical investigations, jointly conducted by researchers and practitioners, will help gain useful insights into understanding and managing complexity. Those organizations that can accurately identify, assess, and manage the complexity inherent in projects are likely to gain important competitive advantages.

  • PDF

A Study on Recent Research Trend in New Product Development Using Keyword Network Analysis (키워드 네트워크 분석을 이용한 NPD 연구의 진화 및 연구동향)

  • Pyun, JeBum;Jeong, EuiBeom
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.23 no.5
    • /
    • pp.119-134
    • /
    • 2018
  • Today, many firms face the environment of high uncertainty and severe competition due to the rapid technology development and the diverse needs of customers. In the business environment, one of the most important ways to gain sustainable competitive advantage and future growth engine is related to NPD (New Product Development), which is a very important issue for practice and academia. Thus, this study intends to provide new values to practitioners and researchers related to NPD by analyzing current research trends and future trends in NPD field. For this, we bibliometrically analyzed keyword networks which consist of keywords that were already published in the eminent journals from Scopus database to generate insights that have not been captured in the previous reviews on the topic. As a result, we could understand the extant research streams in NPD field, and suggest the changes of specific research topics based on the connected relationships among keywords over the time. In addition, we also foresaw the general future research trends in NPD field based on the keywords according to preferential attachment processes. Through this study, it was confirmed that NPD keyword network is a small world network that follows the distribution of power law and the growth of network is formed by link formation by keyword preferential attachment. In addition, through component analysis and centrality analysis, keywords such as Innovation, New product innovation, Risk management, Concurrent engineering, Research and development, and Product life cycle management are highly centralized in NPD keyword network. On the other hand, as a result of examining the change of preferential attachment of keywords over the time, we suggested the required new research direction including i) NPD collaboration with suppliers, ii) NPD considering market uncertainty, iii) NPD considering convergence with the other academic areas like technology management and knowledge management, iv) NPD from SME(Small and medium enterprises) perspective. The results of this study can be used to determine the research trends of NPD and the new research themes for interdisciplinary studies with other disciplines.

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.

Status of Economics Analysis Using LCC in Turn-Key Project : Focus on Landscape Architecture (설계시공일괄발주(턴키) 설계에서 LCC를 활용한 경제성 분석 실태: 조경분야를 중심으로)

  • Yoon, Yong-Han;Kim, Jeong-Ho
    • Journal of Environmental Policy
    • /
    • v.10 no.4
    • /
    • pp.39-59
    • /
    • 2011
  • In this article, I would like to analyze the conditions in applying the LCC method for each construction type by selecting 10 apartment complexes among the Turn-key projects which have been ongoing for the last 5 years. In addition, this article will identify the problems to the application of double landscape architecture and suggest improvement measures. Among the 10 case targets, a total of 151 LCC analyses were conducted, and the average application ratio placing for each construction type was shown in the following order: architecture (34.4%)> electricity (21.2%)>machine (18.5%)>civil engineering (13.2%)>landscape architecture (12.6%). As numbers show, landscape architecture was the lowest. The ratio of LCC reduction amount was shown in the following order: machine (32.1%)> architecture (23.9%)>electricity (23.4%)>civil engineering (17.5%)>landscape architecture (3.1%). The field of landscape architecture had a reduction amount that was about 5 to 6 times lower than civil engineering which had a similar number of LCC analysis cases. The total LCC analysis items of landscape architecture was 19, including 15 double packing material, 1 building covering, 1 grass planting, 1 planting infrastructure, and 1 facility. The following measures were suggested to promote LCC analysis in landscape architecture: first, set an analysis item that considers the construction expense ratio of landscape architecture; second, legal regulation of landscape architecture and expansion of its application; third, prepare VE/LCC standards which are suitable for landscape architecture.

  • PDF

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.