• Title/Summary/Keyword: Project Life-cycle

Search Result 479, Processing Time 0.029 seconds

Design of an Integrated Product Management System for Game Software Development (게임 소프트웨어 산출물 통합관리시스템 설계)

  • Kim, Byung-Cheol
    • Journal of Digital Convergence
    • /
    • v.13 no.12
    • /
    • pp.319-324
    • /
    • 2015
  • This paper proposes an integrated management system for products of game software development. Those products generated over software life-cycle are generally huge in numbers, various in kinds and interconnected in relationships among them. Especially they are highly complex and tightly coupled each other because they are used to build another world which is composed of multi-modal data such as graphics, sound, logics and so on. Therefore it is critical to manage development products in an integrated manner to guarantee the quality of software. The proposed system is designed to provide project/requirement/configuration/traceability management capabilities and interfacing to CASE standards. To achieve the objective, it is based on data warehouse technologies which provide central repositories of heterogeneous data, multi-aspect reporting&analysis capabilities, traceability, verification, etc.

BIM based Design of Steel Box Girder (STEEL BOX 교량 상부구조의 BIM기반 설계)

  • Lee, Jin-Kyoung;Lee, Heon-Min;You, Jae-Myoung;Shin, Hyun-Mock
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.6-11
    • /
    • 2011
  • In domestic construction industry, there is lack of the communication between planning, design, construction and maintenance. This problem makes the omission of information and the loss of cost. Therefore, the introduction of BIM can be a solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the design process of steel box bridge for structural design work of bridge construction project based on BIM. This process has 3D modeling progress done by using the information decided in design phase. When the subject for the proposed process is superstructure of steel box bridge in construction, the structural calculation sheet can be derived with the structural design process based on BIM.

A Study on the Lifting Progress for Composite Precast Concrete Members of Green Frame (그린 프레임 합성 PC부재의 양중공정 분석 연구)

  • Joo, Jin-Kyu;Kim, Shin-Eun;Lee, Gun-Jea;Kim, Sun-Kuk;Lee, Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.34-42
    • /
    • 2012
  • Green frame technology intended to facilitate the remodeling of apartment housing complexes in Korea and extend their service life has been developed. Green frame design is a Rahmen structure using composite precast concrete members and, unlike a bearing-wall structure, lifting and installing structural members accounts for major steps of structural construction. Therefore, if green frame structure construction is to be scheduled appropriately, systematic lifting plan needs to be developed in advance. Development of lifting plan also requires unit lifting process of composite PC members (columns and beams) that consist of green frame to be analyzed first. Therefore, this study attempts to analyze the lifting process of composite PC members used in green frame structure. To that end, lifting procedure and time of composite PC column and beam are estimated and applied to a project case to analyze the lifting cycle of reference floor. Outcomes produced herein will be used as key data for development of lifting plan in subsequent green frame structure construction.

Application of Generally Annual Maintenance Concept for LCC Analysis with a Highway (고속도로 LCC분석시 연간일상유지관리 개념의 적용)

  • Heo, In;Lee, Yong-Gu;Yang, Jae-Gyeong;Choe, Yeong-Min;Kim, Seung-Hyeon
    • Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.43-54
    • /
    • 2011
  • LCC(Life Cycle Cost) analysis on design process has to be performed for a selection of reasonable and economical design alternatives in highway construction projects. To be performed of LCC analysis, the maintenance data such that are maintenance periods, rate of repair, maintenance cost, and so on are required. Therefore the Hi-Portal System had been developed and the maintenance data has been accumulating in the Korean Expressway Corporation. However, the data are not effectively used because the system have no consideration for LCC concept, and currently, th data are acquired by survey with experts. In the study, it is proposed that the concept of Generally Annual Maintenance are practically and easily used to perform LCC analysis. Some of generally annual maintenance data are suggested through Hi-portal data analysis due to the proposed concept and LCC analysis of a real highway construction project is preformed by comparison with a current approach. From the results, it make sure that the proposed concept are effectively used to preform LCC analysis until during exactly practical data from Hi-Portal system are obtained.

SELECTING NIR EQUIPMENT TO MEET THE STRATEGIC REQUIREMENTS OF A GLOBALIZED PHARMACEUTICAL COMPANY

  • Dowd, Chris;Horvath, Steve;Lonardi, Silvano;Salton, Neale;Scott, Chris;Viviani, Romeo
    • Proceedings of the Korean Society of Near Infrared Spectroscopy Conference
    • /
    • 2001.06a
    • /
    • pp.3113-3113
    • /
    • 2001
  • Some two years ago our company undertook a project on manufacturing network rationalization to maximize competitiveness through continuous improvement in manufacturing efficiency. One key outcome was the recognition of the benefits that could be derived from timely application of new technology or novel use of existing technologies and even more importantly the need to develop company wide strategies to maximize the impact of such applications. As a direct result an exercise was undertaken to identify the ten most promising technologies from a list of literally hundreds seen as having the capability of making a rapid impact on the manufacturing initiative. One of the outcomes of this exercise was the identification of Near Infrared Spectroscopy as a pivotal technology for improving process understanding, performance, and control to deliver consistent product quality cost effectively with broad applicability across our product range. While NIR had been in use in targeted areas on some of our sites for some years our new challenge was to develop a strategy to extend NIRs application, initially over 17 manufacturing sites, while concurrently expanding the NIR skill base company wide to ensure that the return on initial investment could be further maximized as shared applications across the remaining sites as required. This presentation will provide an overview of how life cycle based user requirement specifications were developed covering: ㆍSpectrophotometers ㆍSample interfaces ㆍSoftware ㆍEquipment and Software qualification ㆍCalibration transfer ㆍ Ease of developing effective user interfaces and control for applications transferred to a production area ㆍUser training ㆍWorld wide support The presentation will also describe the process adopted for vendor selection to ensure maximum utilization of the existing company wide NIR skill base and its future development to expedite applications of the technology in development, quality control and production areas.

  • PDF

A Study on Participation of Consultant in Curtain Wall Construction (커튼월 공사에서의 단계별 컨설턴트 참여방안 연구)

  • Yoon Hyung-Soo;Yi Dong-Seob;Koo Cho-Jin;Hyun Chang-Tack
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.618-621
    • /
    • 2003
  • The purpose of this study was to propose the participation of consultant pertinent to ground situations. The careful consideration of participating consultant reduces life cycle cost. duration and improves quality. The first step is studying Curtain-wall construction process by researching the documents, and Second step is analyzing Curtain-wall construction's problem through having a interview with a concerned experts (Architect, Gene-con, Sub-con. Consultant). Then we study how consultant solves the problem, propose the way of participation of consultant. The way of participation consist of three phases. the first one is to participate in design & construction process and the second one is to participate in design process, the third one is to participate in construction process. These participations are decided by evaluating project, design phase. construction phase. The verification of these participating strategies was implemented by the interview with the experts.

  • PDF

Effect of the Application of the CBD Output Management Technique for the Development of Operation Software for a Space Observation System

  • Seo, Yoon Kyung;Rew, Dong Young;Kirchner, Georg;Nah, Jakyoung;Jang, Bi-Ho;Heo, Jiwoong;Youn, Cheong
    • Journal of Astronomy and Space Sciences
    • /
    • v.31 no.3
    • /
    • pp.265-276
    • /
    • 2014
  • The application of software engineering is not common in the development of astronomical observation system. While there were component-wise developments in the past, large-scale comprehensive system developments are more common in these days. In this study, current methodologies of development are reviewed to select a proper one for the development of astronomical observation system and the result of the application is presented. As the subject of this study, a project of operation software development for an astronomical observation system which runs on the ground is selected. And the output management technique based on Component Based Development which is one of the relatively recent methodologies has been applied. Since the nature of the system requires lots of arithmetic algorithms and it has great impact on the overall performance of the entire system, a prototype model is developed to verify major functions and performance. Consequently, it was possible to verify the compliance with the product requirements through the requirement tracing table and also it was possible to keep to the schedule. Besides, it was suggested that a few improvements could be possible based on the experience of the application of conventional output management technique. This study is the first application of the software development methodology in the domestic astronomical observation system area. The process and results of this study would contribute to the investigation for a more appropriate methodology in the area of similar system development.

A Model to Estimate Software Development Effort Based on COSMIC-FFP Using System Complexity (시스템 복잡도를 적용한 COSMIC-FFP 기반 소프트웨어 개발노력 추정 모델)

  • Park, Sang-Ki;Park, Man-Gon
    • Journal of Korea Multimedia Society
    • /
    • v.13 no.11
    • /
    • pp.1575-1585
    • /
    • 2010
  • It is very important to forecast a back resource of a software development effort at the early stage of development life cycle for successful project processing, and it is carried out through software size estimation. The recent trend of software size estimation method is focused on the user's value such as FPA. We measure the actual development effort through case study and calculate CFP directly according to the cosmic-ffp manual V.3.0. in this paper. We also propose the software development effort estimation model by using the produced data. COSMIC-FFP does not use weights of necessary function elements, and so it has disadvantage in estimating sizes. This paper proposes the estimation model to estimate the precision software size by using system complexity as weight.

Strategic Development Plan of Standardization on Korean Medicine : Comparison with Traditional Medicine Policies between Korea and China (한의약 표준화 발전방안 연구: 한-중 전통의학 표준화 정책비교를 바탕으로)

  • Lee, Juyeon;Lee, Minho;Choi, Sun-mi;Kim, Yong-suk;Koh, Byunghee;Moon, Jinseok
    • The Journal of Korean Medicine
    • /
    • v.37 no.3
    • /
    • pp.97-111
    • /
    • 2016
  • Objectives: This study aims to investigate the policy status of traditional medicine standardization between Korea and China as well as to derive a strategic development plan for Korean medicine standardization. Methods: The existing national plans and preceding studies on traditional medicine standardization in Korea and China were reviewed, and scope of the study was categorized as having three main aspects: infrastructure; standard development and standardization activities; and application and diffusion. Results: Nine development plans for Korean medicine standardization derived under the study were as follows: With regard to infrastructure of standardization, 1) standardization plan of Korean medicine shall be established based on involvement of multi-government ministries. 2) It shall be set with a consistent cooperation process among standardization-related organizations, as well as 3) encourage the industry to participate in standardization activities. To activate standards development, 4) launching the R&D-standardization-industrialization linked project, 5) supporting Korean medicine society and the mirror committee for motivation, and 6) planning the international joint research for development of standard and expanding standardization activities are recommended. In the aspect of application, there is a need for 7) expanding certification systems for the industry and 8) evaluation and feedback on the life-cycle of standardization. Lastly, 9) educational programs for training experts of standardization shall be developed and implemented. Conclusions: In order to invigorate standardization activities for Korean medicine, enhancement of planning and evaluation capacity, ensuring the strategic development of standards, broadening boundaries of international standardization activities, and training professionals are required.

A Study on the Possibility of 2D Design Drawing Implementation by Revit Architecture (Revit Architecture를 이용한 2D 설계도면 구현 가능성에 관한 연구)

  • Cho, Yong-Sang;Lee, Heewon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5243-5250
    • /
    • 2013
  • BIM(Building Information Modeling) enables 3D model-base management for all information produced by construction project during its life cycle. Also as a national policy, BIM has been institutionalized as design criteria. But, on the matter of 2D drawing using BIM software (Revit Architecture), it has been recognized as difficult to realize the same quality drawing drawn by CAD. The purpose of this study is verifying the possibility of printable design drawing implemented by BIM software at the same quality of 2D shop drawing drawn by 2D CAD. Through the analysis of basic design elements of 3D BIM software and 2D CAD software, with the case of partial cross sectional drawing which is most faithful representation of the basic design elements, this study find out that the 3D BIM software can produce the same quality 2D printable drawing utilizing its implicit function.