• Title/Summary/Keyword: Project Life-cycle

Search Result 479, Processing Time 0.025 seconds

A Study on Standard Repair Periods, Repair Rates of School Facilities for Revitalizing of the School BTL Project (학교 BTL사업의 활성화를 위한 학교시설의 수선주기와 수선율 및 내용연수 산정에 관한 연구 -서울시내 초·중·고등학교를 중심으로-)

  • Ha, Ho-Sung
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.6 no.1
    • /
    • pp.60-84
    • /
    • 2007
  • This study purpose is seeing that the independent standard sufficiently reflecting the characteristics of the school facility as the basic material needed to calculate the maintenance and repair expenses is needed to make a more realistic and valid qualitative VFM analysis of the school BTL project. this study attempted to develop the standard for the repair cycle and rate and economic year of the school facility. The quantitative VFM analysis should be conducted based on the repair cycle and repair rate proper to the school facility, not the residential space, when calculating the maintenance and repair expenses of the operating expenses of the school facility. An attempt was made to calculate the repair cycle, repair rate and economic life of 114 component materials of the school facility judged to be able to explain the school field best. And it was confirmed that the repair and maintenance expenses more is needed to be set by about 35% than the existing maintenance and repair expenses.

  • PDF

Safety Management Framework for Information Handover Effectiveness in the Construction Industry (건설 안전관리 개념적 틀 및 정보이양 효율성 분석)

  • JIN, Zhenhui;JUNG, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.50-61
    • /
    • 2020
  • Safety management has been one of the most critical issues in the construction industry for a long time. Despite continuous efforts, it still shows a higher accident rate than other sectors. To reduce the accident rate, a lot of studies have been performed, mostly focused on contractors or construction phase. Although the initial stage of the construction project has the most significant impact on construction safety and decision-makers at the initial stage play an important role, the safety management system throughout the project entire life-cycle is still insufficient. In addition, although a great deal of information is generated in the construction project and the value is increasing, while it shows an inefficient aspect. This is believed to be due to insufficient information exchange and a lack of standards. In this context, this study aims to analyze the efficiency of information handover in construction safety. For this purpose, a safety management framework for systematically and efficiently managing and utilizing for construction safety information is referred to as 'safety business functions', 'project life-cycle', and 'industrial hierarchy'. The 'safety business functions' are classified into three levels. And then, in order to analyze the efficiency of safety information handover, 'importance of safety business function' and 'efficiency of safety information handover' were evaluated by interviewing with experts. This study can be used as reference data for implementing systematical and efficient safety management, and can also increase construction safety competency.

An Extraction of the Risk Events in the Construction Planning Phase (건설기획단계에서의 위험요인 도출)

  • Kwon, Soon-O;Kim, Seon-Gyoo;Lee, Nak-Woon
    • Journal of Industrial Technology
    • /
    • v.25 no.B
    • /
    • pp.99-106
    • /
    • 2005
  • The planning phase of construction project success or failure of the enterprise decision the 1st dangerous duration which occurs very there is a possibility of making with the phase which is important, of construction project in life cycle most many risk. But the risk management from planning phase well does not become accomplished is the actual condition from existing construction project. Consequently, it classifies the risk event from project initial planning phase of construction project from this study which probably is substantial risk event the possibility of accomplishing from a planning phase successfully in order to be.

  • PDF

A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project (화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구)

  • Kim, Yoon;Lee, Dong-Eon;Yoo, Ho-seon
    • Plant Journal
    • /
    • v.6 no.2
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

AN EXPLORATORY STUDY ON THE IMPACT SIGNIFICANCE OF PROJECT STAKEHOLDERS ON CONSTRUCTION PROJECT HEALTH AND SAFETY (H&S)

  • Innocent Musonda;Theodore Conrad Haupt
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.621-628
    • /
    • 2011
  • Health and safety in the construction industry continue to fall behind many industries despite much effort to improve the status. A considerable amount of research has been conducted to try and contribute to addressing the problem of health and safety (H&S) in the construction industry. A number of studies have looked at the role of various construction project stakeholders and their contribution to H&S. However there is no clear identification of the extent to which various stakeholders could contribute and therefore influence the outcome of H&S on construction projects. In view of the above, the current Delphi study went a little bit further and sought to establish the impact significance of construction clients and designers on H&S. This paper will present findings from the study which is the impact significance of clients and designers on H&S consideration throughout the project life cycle.

  • PDF

Optimisation of Rolling Stock Wheelset Life through Better Understanding of Wheel Tyre Degradation

  • Vermeij, I.;Bontekoe, T.;Liefting, G.;Peen, J.
    • International Journal of Railway
    • /
    • v.1 no.3
    • /
    • pp.83-88
    • /
    • 2008
  • Since the 1990's the fleet of the Dutch Railways showed a dramatic decrease in wheel tyre life. This lifetime reduction led to an unacceptable increase in life cycle costs. Therefore Lloyd's Register Rail has proposed to NedTrain to investigate the possibilities of improving the wheel tyre life. Three improvements were determined as most promising and relatively easy to achieve: - Profile optimisation for Rolling Contact Fatigue (RCF) reduction - a new wheel profile has been developed with a better resistance against rolling contact fatigue of the wheel tread. The profile has been implemented on single deck intercity trains and shows an increase in wheel tyre life of 30%. - Selection of improved wheel tyre materials - combining information from literature and experiences of manufacturers five alternative wheel tyre materials have been selected and are now being tested in practice. - Optimisation of the maintenance strategy - an alternative, preventative maintenance regime has been developed. With this Scraping regime, during short term maintenance every wheel is reprofiled. Higher mileages are reached and savings on life cycle costs up to 50% and more have been achieved. Unplanned maintenance goes down with $30{\sim}60%$. The results from field tests, using a reference group for comparison, and preliminary results after implementation show that the increase in wheel tyre life that is achieved with this project is significant. The results will continue to be monitored using the asset management tool 'Wheel Watch', that was specially developed for this project and is also described in this paper.

  • PDF

A Study on the Research Support Services of the University Library based on the Research Life Cycle (연구 수명주기 기반 대학도서관의 연구지원서비스 분석 연구)

  • Oh, Sunhye;Kwak, Seing-Jin
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.54 no.2
    • /
    • pp.155-178
    • /
    • 2020
  • As the research environment, such as Open Science, has recently changed, the scope of research support services conducted by university libraries is also expanding. In particular, there is a movement that needs to develop research support services of university libraries that are suitable for this through a clear understanding of the research life cycle centering on overseas. The purpose of this study is to provide suggestions that university libraries can refer to when developing research support services that can systematically support all phases of the research life cycle. To this end, the research life cycle was divided into five stages, "planning," "project," "publishing," "preservation" and "disseminating" and the research support services provided at each stage were examined around the cases of U.S. and domestic university libraries. Based on the implications obtained from the case, a service plan was proposed for domestic university libraries to systematically support each phase of the research life cycle.