• 제목/요약/키워드: Project Life Cycle Cost

검색결과 172건 처리시간 0.025초

Estimating the Loss Ratio of Solar Photovoltaic Electricity Generation through Stochastic Analysis

  • Hong, Taehoon;Koo, Choongwan;Lee, Minhyun
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권3호
    • /
    • pp.23-34
    • /
    • 2013
  • As climate change and environmental pollution become one of the biggest global issues today, new renewable energy, especially solar photovoltaic (PV) system, is getting great attention as a sustainable energy source. However, initial investment cost of PV system is considerable, and thus, it is crucial to predict electricity generation accurately before installation of the system. This study analyzes the loss ratio of solar photovoltaic electricity generation from the actual PV system monitoring data to predict electricity generation more accurately in advance. This study is carried out with the following five steps: (i) Data collection of actual electricity generation from PV system and the related information; (ii) Calculation of simulation-based electricity generation; (iii) Comparative analysis between actual electricity generation and simulation-based electricity generation based on the seasonality; (iv) Stochastic approach by defining probability distribution of loss ratio between actual electricity generation and simulation-based electricity generation ; and (v) Case study by conducting Monte-Carlo Simulation (MCS) based on the probability distribution function of loss ratio. The results of this study could be used (i) to estimate electricity generation from PV system more accurately before installation of the system, (ii) to establish the optimal maintenance strategy for the different application fields and the different season, and (iii) to conduct feasibility study on investment at the level of life cycle.

무기체계 업체주관 연구개발 사업의 개발시험평가 개선방안 고찰 (A Study on the Improvement Method of DT&E for Company Organized Weapon Systems Research and Development)

  • 김성경;김찬동;허장욱
    • 한국군사과학기술학회지
    • /
    • 제18권6호
    • /
    • pp.721-727
    • /
    • 2015
  • The improvement of the reliability of weapon systems and the reduction of the total life-cycle cost based on the improving of the DT&E system for Company Organized weapon systems research and development are urgently required. The major advanced countries operate test and evaluation centers for military (U.S.), manage a large scale organization of IPT personnel (England) or conduct management of DT&E through a third party organization (France). Based on a survey of experts, an improvement of the DT&E policy in terms of reliability and objectiveness is needed, and management through a third party national defense agency and civilian agency such as the Surion development case is required. In addition, although it appears that efficiency improves when management of DT&E is performed by national defence agencies rather than civilian agencies, it is necessary to proceed by selecting a civilian agency based on competition in the case that it is difficult to select a national defence agency.

모듈러 교각의 BIM 기반 정보 모델 인터페이스 모듈 개발 (Development of BIM Based Information Model Interface Module for a Modular Pier)

  • 김동욱;이광명;남상혁
    • 한국BIM학회 논문집
    • /
    • 제5권1호
    • /
    • pp.1-7
    • /
    • 2015
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the data exchange between the contractors, designers, fabricators and constructors. Therefore, a readily accessible information model interface module based on BIM technology is essential for their communication during a project life-cycle. In this study, BIM based information model interface module for a modular pier was developed. For the information models, the PBS(Product Breakdown Structure) and LOD(Level of Development) were defined. Next, all components of a modular pier were conducted by the parametric modeling technique, and then 3D cell library interface was developed. An nterface module was also developed using VBA(Visua basic Application) for exchanging a data from 3D model library to other softwares such as Microstation, AutoCad and Excel and was connected with MS Access database. The developed information model interface module would improve the design quality of the modular pier and reduce the time and cost for design. Updated 3D information models could be utilized for the fabrication, assembly, and construction process for modular piers.

Sustainable retrofit design of RC frames evaluated for different seismic demand

  • Zerbin, Matteo;Aprile, Alessandra
    • Earthquakes and Structures
    • /
    • 제9권6호
    • /
    • pp.1337-1353
    • /
    • 2015
  • Seismic upgrading of existing structures is a technical and social issue aimed at risk reduction. Sustainable design is one of the most important challenges in any structural project. Nowadays, many retrofit strategies are feasible and several traditional and innovative options are available to engineers. Basically, the design strategy can lead to increase structural ductility, strength, or both of them, but also stiffness regulation and supplemental damping are possible strategies to reduce seismic vulnerability. Each design solution has different technical and economical performances. In this paper, four different design solutions are presented for the retrofit of an existing RC frame with poor concrete quality and inadequate reinforcement detailing. The considered solutions are based on FRP wrapping of the existing structural elements or alternatively on new RC shear walls introduction. This paper shows the comparison among the considered design strategies in order to select the suitable solution, which reaches the compromise between the obtained safety level and costs during the life-cycle of the building. Each solution is worked out by considering three different levels of seismic demand. The structural capacity of the considered retrofit solutions is assessed with nonlinear static analysis and the seismic performance is evaluated with the capacity spectrum method.

Framework of Non-Nuclear Methods Evaluation for Soil QC and QA in Highway Pavement Construction

  • Cho, Yong-K.;Kabassi, Koudous;Wang, Chao
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권2호
    • /
    • pp.45-52
    • /
    • 2012
  • This study introduces a methodology to evaluate different types of non-nuclear technologies to see how they are competitive to the nuclear technology for quality control (QC) and quality assurance (QA) in soil condition measurement for highway pavement construction. The non-nuclear methods including the Electrical Density Gauge (EDG) and the Light Weight Deflectometer (LWD) were tested for their performance against a nuclear gauge, and traditional methods were used as baselines. An innovative way of comparing a deflection gauge to a density gauge was introduced. Results showed that the nuclear gauge generally outperformed the non-nuclear gauge in accuracies of soil density and moisture content measurements. Finally, a framework was developed as a guideline for evaluating various types of non-nuclear soil gauges. From other perspectives rather than accuracy, it was concluded that the non-nuclear gauges would be better alternative to the nuclear gauge when the followings are considered: (1) greater life-cycle cost savings; (2) elimination of intense federal regulations and safety/security concerns; and (3) elimination of licensing and intense training.

공공시설물의 LCC 평가기준 개선방안 (Life Cycle Cost Evaluation Index Enhancing of Public Facilities)

  • 구본학;김태희;김옥규;박태근;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.412-415
    • /
    • 2007
  • 최근 들어 선진국에서는 LCC에 대한 평가 제도를 활발히 활용 중에 있고, 우리나라는 건설공사비용을 절감하기 위하여 그 제도를 신규로 도입하고 있는 실정이다. 그리고 새로운 정부공사 발주방식인 "기술제안형 입찰방식" 도입에 따라 시설물 LCC를 평가하는 가격평가방식이 필요하게 되었다. 그러나 현재 우리나라는 BTL과 턴키 프로젝트에서 LCC를 평가하고 있으나 평가요소와 기준이 불명확하여 평가에 어려움을 겪고 있고 BTL과 턴키를 제외한 공공건설사업은 LCC 평가가 이루어지지 않고 있는 실정이다. 따라서 본 연구에서는 LCC를 체계적이고 객관적인 평가를 위한 평가기준을 제시하고자 한다.

  • PDF

ESTIMATING THE LOSS RATIO OF SOLAR PHOTOVOLTAIC ELECTRICITY GENERATION THROUGH STOCHASTIC ANALYSIS

  • Taehoon Hong;Choongwan Koo;Minhyun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-385
    • /
    • 2013
  • As climate change and environmental pollution become one of the biggest global issues today, new renewable energy, especially solar photovoltaic (PV) system, is getting great attention as a sustainable energy source. However, initial investment cost of PV system is considerable, and thus, it is crucial to predict electricity generation accurately before installation of the system. This study analyzes the loss ratio of solar photovoltaic electricity generation from the actual PV system monitoring data to predict electricity generation more accurately in advance. This study is carried out with the following five steps: (i) Data collection of actual electricity generation from PV system and the related information; (ii) Calculation of simulation-based electricity generation; (iii) Comparative analysis between actual electricity generation and simulation-based electricity generation based on the seasonality; (iv) Stochastic approach by defining probability distribution of loss ratio between actual electricity generation and simulation-based electricity generation ; and (v) Case study by conducting Monte-Carlo Simulation (MCS) based on the probability distribution function of loss ratio. The results of this study could be used (i) to estimate electricity generation from PV system more accurately before installation of the system, (ii) to establish the optimal maintenance strategy for the different application fields and the different season, and (iii) to conduct feasibility study on investment at the level of life cycle.

  • PDF

국내 해양 CCS 사업의 HSE 관리 프레임워크 구축 전략 (Strategy for Development of HSE Management Framework for Offshore CCS Project in Korea)

  • 노현정;강관구;강성길;이종갑
    • 한국해양환경ㆍ에너지학회지
    • /
    • 제20권1호
    • /
    • pp.26-36
    • /
    • 2017
  • 지구온난화를 방지하기 위해 대량의 $CO_2$를 감축 시킬 수 있는 해양 CCS(Carbon dioxide Capture and Storage) 실증 및 상용화를 국내에서 준비 중이다. 해양 CCS 사업은 해양내 심부 퇴적층을 대상으로 대규모 $CO_2$를 수송, 주입, 저장하는 기술로써, 누출 등의 사고 발생 시 인명, 환경, 재산 등에 큰 피해를 야기할 잠재적 가능성을 가지고 있다. 따라서 해양 CCS 사업 안전성을 확보하기 위해서는 생애주기에 걸쳐서 유 가스 생산 해양플랜트에 준하는 엄격한 HSE(Health, Safety and Environment) 관리 방안이 요구된다. 하지만 국내에는 CCS 사업에 적용 가능한 HSE 법 또는 규정이 없을 뿐만 아니라 관련 연구도 미비한 상황이다. 이에 본 연구에서는 국외 해양플랜트 관련 HSE 관리 방법론, 해양 CCS HSE 관리 가이드라인 및 국외 사례를 분석하고, 이를 통하여 국내에서 해양 CCS를 추진시 HSE 관리 프레임워크 구축에 필요한 요구사항을 도출하였다. 이를 위해 본 연구에서는 먼저 범용적으로 활용되는 위험 관리방법론인 ISO 31000에 대한 분석을 수행하였다. 또한 해양플랜트 HSE 관리체계를 체계적으로 구축 운영 중인 노르웨이와 영국의 해양 CCS HSE 관리가이드라인 및 적용사례를 각각 분석하였다. 이를토대로 국내에서 해양 CCS 사업 추진시 HSE 관리 프레임워크 구축을 위해 우선적으로 수행해야할 사항으로 HSE Philosophy의 작성의 필요성을 피력하였고 생애주기 단계에 따른 HSE 관리 프로세스를 제안하였다. 본 논문에서 제안한 HSE 관리 프레임워크를 통해 국내 해양 CCS 실증 사업 추진시 기획 설계 단계부터 HSE 관리를 한다면 보다 안전하고 체계적인 사업을 이행할 수 있을 것으로 기대된다.

LCI DB를 활용한 해체공사 환경경제성 평가 (Evaluation of Environmental Economics on Dismantling Projects Using LCI DB)

  • 권석현;김경주;김병수;김상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.233-238
    • /
    • 2008
  • 우리나라는 경제규모에 비해 환경오염물질 배출량이 많으며, 이는 에너지 다소비업종의 비중 증가에 따른 것이다. 이에 따라 에너지 다소비업종 중 하나인 건설 관련 공사에 대한 효율적인 에너지 절약이 이루어지지 않는 문제점이 대두되고 있다. 뿐만 아니라 근래 노후화된 건축물의 해체공사가 빈번하며, 이러한 상황에서 좀 더 나은 에너지 절약효과를 갖기 위해서는 건설공사의 전과정(Life Cycle) 중 해체단계에서 발생하는 에너지소비량, 환경오염물질 배출량, 환경비용등에 관한 기본적인 DB 구축 및 활용방안 개발이 필요할 것이다. 이에 본 연구에서는 지식경제부와 환경부에서 제시하는 LCI DB를 활용하여 해체공사시 발생하는 환경오염물질 배출량을 산출하고 환경오염물질별 환경비용을 환산하여 건축물 해체공사에 대한 환경경제성을 평가하고자 하였다. 이를 위해 관련 자료조사, 기존 문헌연구 및 현장조사 등을 실시하였고 이들 수집자료의 분석결과를 바탕으로 사례대상인 건축물의 환경경제성을 평가하였다.

  • PDF

효율적인 자산관리를 위한 건설정보 이양요건 평가 (Evaluation of Handover Requirements of Construction Information for Efficient Facility Management)

  • 이익행;정영수
    • 한국건설관리학회논문집
    • /
    • 제19권4호
    • /
    • pp.12-20
    • /
    • 2018
  • 최근 시설이 대형화, 복합화, 첨단화됨에 따라 건축물 운영단계에서 수행되는 자산관리 업무의 중요성이 대두되고 있으며, 이에 따라 자산관리 업무의 범위가 확대되고, 요구 정보가 증가하고 있다. 그러나 건설 생애주기 단계 간 업무 중첩, 협업 배제 등으로 인한 비효율적인 정보교환이 이루어지며, 이로 인해 비용 손실이 발생된다. 이러한 생애주기 간 낮은 정보호환성 문제는 전 생애주기 관점의 건설 정보관리를 통해 보완할 수 있다. 각 생애주기 단계 참여자의 건설정보 관리는 발주자의 건설정보 이양요건을 통해 구체화된다. 이에 본 연구는 발주자 관점의 자산관리 개념 정리와 생애주기 간 정보호환성 개선을 목적으로, 자산관리의 유형분류, 자산관리 업무기능, 그리고 건설정보 이양요건 항목의 가치 평가방법론을 제시하였다. 본 연구의 방법론을 이용하여 시공자가 발주자에게 제공하는 '인수인계 항목'을 발주자의 이양요건으로 참조하여 평가하였다. 그 결과 건축물 정보, 도면 등의 순서로 가치 순위가 도출되었다. 본 연구를 통하여 사업 초기단계에서 발주자의 건설정보 이양요건 도출, 그리고 정보이양(Information Handover)의 성과측정을 위한 기초자료로써 활용될 수 있다.