Application of Project Management on Pyro Project (파이로 프로젝트에 프로젝트 관리 적용 방안)

  • Kim, Jeong-Guk;Kim, Hyuck-Jong;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.26-33
    • /
    • 2017
  • Pyro project, one of complex project, is now under research and development. To manage this kind project successfully, it is essential to apply the processes of technical management (TM) based on systems engineering (SE) and project management (PM). In this paper, the project management processes from ISO-21500 standard, PMBOK guide, and PRINCE2 guide were reviewed, and then some common PM for the large national R&D project were selected. An integrated technical management and project management frame work was finally established and suggested for Pyro project.

The Scope and Relationship of Project Management and Systems Engineering Management (프로젝트 관리(PM)와 시스템엔지니어링 관리(SEM)의 범위 및 관계)

  • Lee, Joongyoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.1-13
    • /
    • 2014
  • Put Abstract text here. Recently, the Korea industry need systems engineering technology more than yesterday. The systems engineering management function is needed to use the systems engineering engine process effectively. The systems engineering management function is overlapped a lot with project management function and has vague interface. The project management and systems engineering are two independent disciplines. So there are few references which address the scope and relationships clearly between systems engineering management and project management. This paper suggest the scope and relationships between systems engineering management and project management and revise the PMP and SEMP structure of Blanchard and Fabrycky. Followings are the key concept of this paper presenting. The project management(PM) composed of technical management and non-technical management. The technical management scope is same with systems engineering management. The non-technical management scope is composed of parts of enterprise support processes.

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.