• Title/Summary/Keyword: Project Delay

Search Result 282, Processing Time 0.021 seconds

A Study for Selecting the Plant Project Risk Management Check List (플랜트 PRM (Project Risk Management) 체크리스트 항목 선정을 위한 연구)

  • Choi, Doo-hoi;Bang, Hong-soon;Lee, Tae-hyeong;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.54-64
    • /
    • 2018
  • Currently, as construction businesses develop and diversity, risk became one of the most crucial considerations. Risks are potential and difficult to predict by nature. Also, they are important as they influence delay in construction period and increase of project costs. In construction projects in South Korea and elsewhere, the importance of risk management widely recognized and relevant research is being conducted continuously. The companies use PRM checklist but apply different criteria and items. For efficient risk management in plants, plant PRM checklist is necessary. This study analyzed risk factors that are taken into account in construction projects and proposed a plant PRM checklist based on case analysis and opinions of experts. Also, it rated the frequency and importance of each risk.

An Exploratory Study on Conceptual Framework for Project-based Supply Chain Management : Focusing on Plant Engineering Firms (프로젝트형 SCM의 개념적 틀에 관한 탐색적 연구 : 플랜트 엔지니어링 기업을 중심으로)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.16 no.12
    • /
    • pp.123-135
    • /
    • 2018
  • The objective of this paper is to investigate the issues related to the supply chain management in plant engineering industry, and propose the framework to improve the project efficiency. The preliminary case study shows that EPC's fragmented nature, lack of coordination and information sharing, and lack of proper risk and change management contribute to project delay and cost overrun. To examine the level of informatization and information sharing in supply chain, survey responses from the suppliers and subcontractors have been collected. The statistical results show that information sharing, early involvement in design process and awareness in SCM have influenced the level of collaboration, but supplier assessment and informatization have no impact on the collaboration. A conceptual model is proposed in order to facilitate the integration of design, procurement and construction functions. Implications from the study are also provided.

A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing (공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구)

  • Lee, Young-Jae;Cho, Dong-Hyun;Lee, Mi-Young;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facliity (건설사업의 효율적인 리스크관리를 위한 RBES 분석기법과 적용에 대한 연구)

  • Park, Jaeil;Kim, Dongjin;Kim, Gyeonghyun;Lim, Jongkwon;Lee, Minjaee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.125-133
    • /
    • 2016
  • The Project Risk Management is intended to result in the effective management by identifying in advance and mitigating all significant risks including project risks and opportunities during the entire project life cycle - from project inception to completion of construction. It is impossible to predict an exact budget and construction duration before finishing a project. So, Washington Department of Transportation mandates that workshop-based risk management is conducted for projects over specific cost. However, the domestic construction sites have depended on numerical risk analysis without any workshop and efficient risk management have not made. Therefore, in this study, we propose the effective risk management using the RBES program which is very useful for workshop-based risk management and pre & post mitigation, by workshop-based risk management techniques. This proposed risk management approach is applied to a domestic 'A' river recovery project. It is concluded that we may expect the effect to mitigate the total cost overrun problem and the construction duration delay effect in the project by identifying significant risks and by preparing effective risk mitigation strategies.

The Role of CM for Fast track Completion of Urgent Typhoon Recovery Construction Projects - Gangwon-Do Cases - (수해복구공사 조기착공을 위한 CM의 역할 재조명 - 강원도 사례를 중심으로 -)

  • Kim, Kyoung Nam;Choi, Jae-ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.355-362
    • /
    • 2008
  • Fast track completion of urgent typhoon damage recovery construction project is becoming crucial for the prevention of the secondary damage from the next year typhoon, prompt psychological stabilization of flood sufferers, the early recovery of damaged infrastructure condition and so forth. As the recovery learning process has been continued for last consecutive typhoons and experts suggested, the keys in attaining the goals of the project (preventative, sustainable, cleaner and fast tracking development) are found to be the early contracting and improved competencies in project management especially during the design phase. It can be presumed that the former is attainable through administrative supports in the form of government guidelines, but the latter necessitates more research efforts. In this regards, this study aims to find a way how to lift up the current level of project management capability facing ever changing project mangement environment of urgent typhoon recovery project. By comparing the current level of application of government guidelines in flooded districts and analyzing the time required for each phase from design contracting to construction starting, several reformative ideas are illustrated in association with the necessity of adopting CM method in the deign phase. It is highly expected that CM application in the design phase can be an effective alternative in overcoming current limits in improving the quality of the project and prevent the delay due to the lack of expertise and professional workers in the owner side.

Improvement of Manufacturing Drawings for Manufacturing Quality Assurance of Modular Housing Unit (모듈러 주거시설의 단위유닛 제작품질 확보를 위한 공장제작도서 개선 연구)

  • Hwang, Hyun-Jun;Jung, Chan-woo
    • Journal of the Korean housing association
    • /
    • v.27 no.6
    • /
    • pp.137-144
    • /
    • 2016
  • In modular architecture, manufacturing drawing which includes whole information for modular unit production is essential since works for modular unit have to be performed in manufacturing factory not construction field. Although the manufacturing drawing is important as known it is insufficient to utilize the manufacturing drawing in modular architecture project and this makes modular unit low-quality with re-work and work time delay. To prevent low-quality modular unit caused by insufficient manufacturing drawing, in this research firstly manufacturing drawing's current situation and error cases in manufacturing phase of past modular housing project were analyzed, and correlation between reduction of errors occurance frequency and improving manufacturing drawing was verified. Secondly manufacturing drawing improvement factors were deducted in interior, furniture, mechanical work phase which errors' occurance rate is high and the way of deducting manufacturing drawing lists and contents were suggested with light-weight work as an example in case of new type of errors occurance. A series of research process can contribute to good-quality modular unit by errors reduction. As a result of research, about half of errors occurance can be reduced with suggested manufacturing drawing improvement factors. And the manufacturing drawing process can contribute to modular production which have uniform quality.

A Study on Introduction of Critical Chain Project Management(CCPM) to Construction Projects (건설 프로젝트에서의 CCPM 도입에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Im Hye-Man
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.427-431
    • /
    • 2002
  • Nowadays in Korea, there has been extreme competition due to market reduction in the domestic construction industry. As a result every company try to change rapidly to secure competitive power, Although it isn't betterment for the way of construction project management then there has many problem such as a delay of the appointed date of delivery and go over the budget. In this study, we suggest an introduction of CCPM which is based on TOC to construction projects.

  • PDF

Local Scheduling method based on the User Pattern for Korea@Home Agent (Korea@Home 에이전트를 위한 사용자패턴기반의 로컬 스케줄링기법)

  • Choi, JiHyun;Kim, Mikyoung;Choi, JangWon
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2007.11a
    • /
    • pp.226-230
    • /
    • 2007
  • This paper proposes a local scheduling method based on user pattern for Volunteer computing project, Korea@Home. It enables Korea@Home participants to run the agent without disturbance. It is devised to prevent user's application from delay while running the agent and decreases the frequency of switching resource between the user and the agent. We analyze the user's patterns of donating computing resource with Korea@Home which is a representative volunteer computing project in Korea. It has contributed the computing power to several applications including climate prediction and virtual screening. It promotes the volunteers to participate continuously without disturbance and increases the potential computing power with non-disturbance scheduling based on user usage pattern for Volunteer Computing.

  • PDF

Collaborative Process to Facilitate BIM-based Clash Detection Tasks for Enhancing Constructability

  • Seo, Jung-Ho;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.299-314
    • /
    • 2012
  • One of reasons for introducing Building Information Modeling (BIM) is to support clash detection tasks by means of a 3D product model. In the conventional construction project process, clashes have been found during construction phase. However, it can cause cost overrun and time delay. In order to investigate and correct clash detections at design phase, relevant business process and guide for this task should be provided. This study aims to identify hindrances in clash detection tasks at the design phase and analyze its current process using IDEF0 model. Despite the convenience of IDEF0 as a systems analysis tool, professional participants might have difficulties to understand their own tasks according to business process. For this reason, in this research, Business Process Model and Notation (BPMN) is introduced to provide ideal process and required decision making governance. The provide BPMN model will provide insights for a BIM-based collaborative environment to enhance the constructability through the construction project.

TRL Impact on Development Schedule and Cost in the Aerospace Project (항공우주개발 프로젝트에서 개발기간과 비용에 대한 TRL의 영향 분석)

  • Hwang, Hyung-Won;Kim, Hong-Rae;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.40 no.3
    • /
    • pp.264-272
    • /
    • 2012
  • TRL has a direct impact on development schedule and cost in the system or technology development projects. If TRL capability of development organization for specified CTEs can be accurately assessed and the impact of TRL on development schedule and cost are analyzed as detailed as possible, the risk of development schedule delay and cost increase can be minimized during the development process. This paper describes analysis results of TRL impact on development schedule and cost in the aerospace project. The development schedule and cost change are quantitatively estimated for the TRL improvement in the Unmanned Aerial Vehicle(UAV) system development program.