• 제목/요약/키워드: Project Definition

검색결과 255건 처리시간 0.027초

Communication-Centered Project Management for Requirements Definition Phase

  • Ishii, Nobuaki;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • 제11권1호
    • /
    • pp.39-47
    • /
    • 2012
  • Requirements definition, which determines a project baseline, has a strong impact on the success of a project. However, since in-depth requirements are gradually revealed through the requirements definition process, the requirements definition is not a straight forward process and often falls into disorder. Thus project management standpoints are critical for the success of the requirements definition. In this paper, we present a framework and mechanisms of communication-centered project management, which controls the requirements definition process based on the situation of communication-oriented activities among stakeholders. In addition, we present a communication-centered project plan with a planning method. The project plan, which represents a time schedule of requirements definition activities, is made by a simulation-optimization algorithm using a stakeholder matrix showing the relations of requirements domains and relevant stakeholders. The effectiveness and the significance of communication-centered project management at the requirements definition phase are demonstrated by numerical examples.

효율적 조경공사 프로젝트 수행을 위한 과업범위설정관련 기초 연구 (A Fundamental Research on Scope Definition for Efficient Landscape Architecture Construction Project)

  • 주상현;이재근
    • 한국조경학회지
    • /
    • 제36권3호
    • /
    • pp.96-110
    • /
    • 2008
  • 토목이나 건축공사와는 달리 조경공사 프로젝트는 그 공정상의 특수성과 규모의 영세성으로 인해 공정관리나 프로젝트관리에 대한 노력이 부족한 실정이다. 이러한 상황 하에서 건축이나 토목 프로젝트 관리 차원에서 많은 연구가 진행되고 있는 과업범위설정에 대한 개념을 조경프로젝트에 적용해 보는 것은 두 가지 측면에서 큰 유익이 있을 것으로 판단된다. 첫째, 파업범위설정은 적용을 위한 추가적인 비용이나 시간적 투자 없이 간단한 절차를 통해 시행해 볼 수 있다는 것이고 둘째, 과업범위설정과 관련된 절차를 통해 얻어지는 결과는 매우 실질적이라는 점이다. 본 연구는 국내 조경공사 프로젝트 수행 시 수반되는 과업범위설정 과정에 대한 조사를 실시하였고 또한, 효율적인 조경프로젝트 수행을 위한 과업범위설정을 돕기 위하여 다양한 방법을 통해 조경공사 프로젝트의 성공요인을 도출하였다. 문헌 연구와 설계사례 분석 그리고 전문가 인터뷰와 설문조사를 통하여 3개 분야 8개 부분의 50개 요소를 조경프로젝트 성공요소로 도출하게 되었다. 도출된 요소들은 조경공사 프로젝트 참가자들 간의 과업범위설정 수준을 향상시키며 효율적인 조경 공사 프로젝트 수행에 기여할 것으로 기대된다.

한국형 PDRI(Project Definition Rating Index)기법 개발 방향 (A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index))

  • 홍심희;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구 (Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase)

  • 김기문;박유진;김기주
    • Journal of Information Technology Applications and Management
    • /
    • 제20권4호
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

THE FEATURE CONSIDERATION AND PLAN FOR DEFINITION SYSTEMATIZATION OF CLIENT'S REQUIREMENT

  • Su-Kyung Cho;Chang-Hyun Shin;Jea-Sauk Lee;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.635-641
    • /
    • 2007
  • The construction starts its business by receiving the order from client and owner. The client presents requirements and related information so that the desired result can come out while the designer and the builder express and implement the building according to set objectives and goals of project based on information on project environment and presented requirements. Because the construction project makes decisions on such objectives at its early stage and previous stage becomes the situation for decision making of next stage as the computation to implement decisions get performed. Accordingly, this study has mentioned necessity of requirement analysis and systematization of construction project, analyzed the work of construction's early stage and resented a plan for objective of construction project requirement definition model in which requirements engineering has been applied and using it while making decisions on designing.

  • PDF

내부수익률의 새로운 정의 (A New Definition of an IRR)

  • 김진욱;이현주;차동수
    • 한국산업경영시스템학회:학술대회논문집
    • /
    • 한국산업경영시스템학회 2002년도 춘계학술대회
    • /
    • pp.9-18
    • /
    • 2002
  • A capital investment problem is essentially one of determining whether the anticipated cash Inflows from a proposed project are sufficiently attractive to invest funds in the project. The net present value(NPV) criterion and internal rate of return(IRR) criterion are widely used as means of making investment decisions. A positive NPV means the equivalent worth of the inflows is greater than the equivalent worth of outflows, so, the project makes profit. Business people are familiar with rates of return because they all borrow money to finance ventures, even If the money they borrow is their own. Thus they are apt to use the IRR in preference to the NPV. The IRR can be defined as the discount rate that causes the net present value of a cash flow to equal zero. Why the project are accepted if the project's IRR is greater than the investor's minimum attractive rate of return. Against the NPV, the definition cannot distinctly explain the concept of the IRR as decision criterion. We present a new definition of the IRR as the ratio of profit on the invested capital.

  • PDF

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

QFD를 활용한 통합된 개발프로젝트 정의 방법 연구 (A Study on the Definition Method for Integrated Development Project using QFD)

  • 김진훈;박영원
    • 시스템엔지니어링학술지
    • /
    • 제8권1호
    • /
    • pp.63-75
    • /
    • 2012
  • For the definition of development project, this paper proposes an integrated design model for the project 3P's(Products, Process, and People) architecture solutions balancing the originating requirements as well as the design targets of product, process, and IPDT. The model is suggested to develop the integrated design method with trade-off analysis and alternatives evaluation of products, processes, and IPDT using QFD.

수리온 체계개발에서의 시스템엔지니어링 적용사례 (Application of Systems Engineering in SURION R&D Project)

  • 김진훈;이동욱
    • 시스템엔지니어링학술지
    • /
    • 제10권1호
    • /
    • pp.81-86
    • /
    • 2014
  • Systems Engineering application focused on requirement definition and management for SURION System Development Project is described in this paper. To perform the development process effectively based on systems engineering processes; Requirements Definition, Design Review, Configuration Management, Quality Assurance, Data Management, are applied in this project. In this processes, the Stakeholder's Requirements are transferred to Specifications verified with design reviews, prototyping inspections, and integration tests. All engineering data, especially verification plan & results are recorded, and traced to each requirements of system specification in Surion database. Therefore, it could be assured that all requirements of specification are evaluated and verified successfully in Surion Project.