• Title/Summary/Keyword: Project Definition

Search Result 255, Processing Time 0.026 seconds

Communication-Centered Project Management for Requirements Definition Phase

  • Ishii, Nobuaki;Muraki, Masaaki
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.1
    • /
    • pp.39-47
    • /
    • 2012
  • Requirements definition, which determines a project baseline, has a strong impact on the success of a project. However, since in-depth requirements are gradually revealed through the requirements definition process, the requirements definition is not a straight forward process and often falls into disorder. Thus project management standpoints are critical for the success of the requirements definition. In this paper, we present a framework and mechanisms of communication-centered project management, which controls the requirements definition process based on the situation of communication-oriented activities among stakeholders. In addition, we present a communication-centered project plan with a planning method. The project plan, which represents a time schedule of requirements definition activities, is made by a simulation-optimization algorithm using a stakeholder matrix showing the relations of requirements domains and relevant stakeholders. The effectiveness and the significance of communication-centered project management at the requirements definition phase are demonstrated by numerical examples.

A Fundamental Research on Scope Definition for Efficient Landscape Architecture Construction Project (효율적 조경공사 프로젝트 수행을 위한 과업범위설정관련 기초 연구)

  • Joo, Sang-Hyun;Lee, Jae-Keun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.3
    • /
    • pp.96-110
    • /
    • 2008
  • Differing from civil engineering and construction, landscape architecture projects are far from efforts in operation and project management. Under the circumstances, it is worthwhile to adopt scope definition from project management for construction and civil engineering in some respects. First, scope definition is able to be conducted through a simple procedure without additional investment in capital and time. Second, the output produced by scope definition is very substantial. The research scrutinized scope definition procedures accompanied by landscape architecture project execution and derived various methods in order to help scope definition for efficient landscape architecture projects. Based on the literature review, a design case study, and an exert interview, the project success elements were developed consisting of 3 sections, 8 categories and 50 elements, grounded on the theoretical base of PDRI. The elements are expected to pave a way to an adequate level of scope definition among participants of landscape architecture projects and contribute in efficient project execution.

A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index) (한국형 PDRI(Project Definition Rating Index)기법 개발 방향)

  • Hong, Sim-Hee;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

Investigating the Factors Influencing Project Satisfaction and Performance in Pre-Project Phase (프로젝트 준비단계에서 프로젝트 성과에 영향을 미치는 요인에 관한 연구)

  • Kim, Gimun;Park, Yu Jin;Kim, Kijoo
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.4
    • /
    • pp.293-313
    • /
    • 2013
  • Preproject phase is an important but often ignored research area in information systems field although it has an undeniable importance for successful project. The purpose of this study is to identify factors affecting project performance in preproject phase and to find empirically critical factors among them. After deriving 9 factors through literature review including clear project definition, project leader position, staffing efforts, preproject team expertise, preproject knowledge scope, preproject partnering, top-management support, resource sufficiency, and project climate, the study investigate the influence of those factors on project performance. The study results reveal that clear project definition, project climate, resource sufficiency, pre-project knowledge scope, project leader position have significant impact on project process satisfaction, a measure of project performance, but the other factors do not. Based on the empirical results, the study discuss academic and practical implications.

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

THE FEATURE CONSIDERATION AND PLAN FOR DEFINITION SYSTEMATIZATION OF CLIENT'S REQUIREMENT

  • Su-Kyung Cho;Chang-Hyun Shin;Jea-Sauk Lee;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.635-641
    • /
    • 2007
  • The construction starts its business by receiving the order from client and owner. The client presents requirements and related information so that the desired result can come out while the designer and the builder express and implement the building according to set objectives and goals of project based on information on project environment and presented requirements. Because the construction project makes decisions on such objectives at its early stage and previous stage becomes the situation for decision making of next stage as the computation to implement decisions get performed. Accordingly, this study has mentioned necessity of requirement analysis and systematization of construction project, analyzed the work of construction's early stage and resented a plan for objective of construction project requirement definition model in which requirements engineering has been applied and using it while making decisions on designing.

  • PDF

A New Definition of an IRR (내부수익률의 새로운 정의)

  • Jin Wook Kim;Hyun joo Lee;Dong Soo Cha
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.9-18
    • /
    • 2002
  • A capital investment problem is essentially one of determining whether the anticipated cash Inflows from a proposed project are sufficiently attractive to invest funds in the project. The net present value(NPV) criterion and internal rate of return(IRR) criterion are widely used as means of making investment decisions. A positive NPV means the equivalent worth of the inflows is greater than the equivalent worth of outflows, so, the project makes profit. Business people are familiar with rates of return because they all borrow money to finance ventures, even If the money they borrow is their own. Thus they are apt to use the IRR in preference to the NPV. The IRR can be defined as the discount rate that causes the net present value of a cash flow to equal zero. Why the project are accepted if the project's IRR is greater than the investor's minimum attractive rate of return. Against the NPV, the definition cannot distinctly explain the concept of the IRR as decision criterion. We present a new definition of the IRR as the ratio of profit on the invested capital.

  • PDF

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

A Study on the Definition Method for Integrated Development Project using QFD (QFD를 활용한 통합된 개발프로젝트 정의 방법 연구)

  • Kim, Jin Hoon;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.63-75
    • /
    • 2012
  • For the definition of development project, this paper proposes an integrated design model for the project 3P's(Products, Process, and People) architecture solutions balancing the originating requirements as well as the design targets of product, process, and IPDT. The model is suggested to develop the integrated design method with trade-off analysis and alternatives evaluation of products, processes, and IPDT using QFD.

Application of Systems Engineering in SURION R&D Project (수리온 체계개발에서의 시스템엔지니어링 적용사례)

  • Kim, Jin Hoon;Rhee, Dong Wook
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.1
    • /
    • pp.81-86
    • /
    • 2014
  • Systems Engineering application focused on requirement definition and management for SURION System Development Project is described in this paper. To perform the development process effectively based on systems engineering processes; Requirements Definition, Design Review, Configuration Management, Quality Assurance, Data Management, are applied in this project. In this processes, the Stakeholder's Requirements are transferred to Specifications verified with design reviews, prototyping inspections, and integration tests. All engineering data, especially verification plan & results are recorded, and traced to each requirements of system specification in Surion database. Therefore, it could be assured that all requirements of specification are evaluated and verified successfully in Surion Project.