The Effect of the Project Plan Variance on Customer Satisfaction: Focus on IT Project Results (프로젝트 계획의 변동이 고객만족도에 미치는 영향: IT 프로젝트 결과 중심으로)

  • Yoon, Hyeong-Seok;Lee, Seouk-Joo;Kim, Seung-Chul;Park, So-Hyun
    • Journal of Information Technology Services
    • /
    • v.21 no.5
    • /
    • pp.51-64
    • /
    • 2022
  • Companies are planning and executing IT projects using information technology as a means to secure external competitiveness. However, IT projects have high risks and uncertainties due to the invisibility of outputs (systems, services, products), and changes in plans frequently occur during project execution. As a result, most IT projects are closed without achieving the target performance. This can lead to a waste of resources and money for the company, which in turn leads to the loss of opportunities to enter new markets. This study intends to analyze the effect of changes in the project plan on customer satisfaction, which is the project performance. Also, we want to find the importance of project planning so that the target performance of the IT project can be achieved. For the empirical analysis of this study, about 500 actual project data were collected. As for the analysis method, statistical analysis such as simple and multiple regression analysis and control effect was performed. Looking at the results of the analysis, it was found that the scope change affects the cost change and the schedule change. Also, changes in scope and cost were found to affect project performance. The theoretical performance of this study proved the theoretical fact that good project performance comes out if the IT project is executed as planned. The practical performance suggested the need for a change in project management by proving that thorough execution of the project planning stage can improve the project performance in the Korean project management culture, where the project planning stage is poorly performed for the rapid implementation of the IT project.

Risk Management for R&D Projects in the Military Aircraft Systems (군용항공기 연구개발 사업의 리스크 관리)

  • Kim, Sung Hun;Lee, Hyun Cheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.4
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.12 no.1
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

Integrated Planning Process Implementation Method Based on the Cost, Schedule, and Technical Performance (비용, 일정 및 기술적 성과를 고려한 통합 계획수립 프로세스 구현 방안)

  • You, Yi-Ju;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.100-108
    • /
    • 2007
  • The purpose of the research is to propose an integrated project planning process and its implementation method. Although there is increasing interest in the application of the Earned Value Management(EVM) method in the project management area, the progress and maturity of the technical performance have not been included in assessing the Earned Value. The main concept of the planning process is to use cost, schedule, as well as the technical performance in the assessment of the Earned Value Management for Military R&D project management practices. The resulting process can enhance the efficiency of the project work by eliminating the currently duplicated activities between traditional project planning process and the newly implemented Earned Value Management process and by shortening the early planning process duration of projects adopting EVM practices.

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects (선보상-후시공 제도의 공공건설사업 파급효과 분석)

  • Kim Sang-Bum;Choi Jeong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.245-254
    • /
    • 2004
  • Pre-compensation and post-construction policy'(PCPC) is a part of $\ulcorner$public project performance improvement policies (PPPIP)$\lrcorner$ whose purpose is to reduce the construction project cost by $20\%$. This research focuses on measuring the quantitative and qualitative impacts of PCPC public construction project. The evaluation of PCPC was conducted using five performance indices which are measuring performance improvement in terms of project cost and schedule. The analysis results show that implementation of this policy reduced $4.8\%$ of public construction project budget while playing a positive role in shortening the project schedule.

Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase (대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석)

  • Ham, Nam-Hyuk;Yuh, Ok-Kyung;Ji, Kyu-Hyun
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project (화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구)

  • Kim, Yoon;Lee, Dong-Eon;Yoo, Ho-seon
    • Plant Journal
    • /
    • v.6 no.2
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.