FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

Development of an Intelligent Control System to Integrate Computer Vision Technology and Big Data of Safety Accidents in Korea

  • KANG, Sung Won;PARK, Sung Yong;SHIN, Jae Kwon;YOO, Wi Sung;SHIN, Yoonseok
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.721-727
    • /
    • 2022
  • Construction safety remains an ongoing concern, and project managers have been increasingly forced to cope with myriad uncertainties related to human operations on construction sites and the lack of a skilled workforce in hazardous circumstances. Various construction fatality monitoring systems have been widely proposed as alternatives to overcome these difficulties and to improve safety management performance. In this study, we propose an intelligent, automatic control system that can proactively protect workers using both the analysis of big data of past safety accidents, as well as the real-time detection of worker non-compliance in using personal protective equipment (PPE) on a construction site. These data are obtained using computer vision technology and data analytics, which are integrated and reinforced by lessons learned from the analysis of big data of safety accidents that occurred in the last 10 years. The system offers data-informed recommendations for high-risk workers, and proactively eliminates the possibility of safety accidents. As an illustrative case, we selected a pilot project and applied the proposed system to workers in uncontrolled environments. Decreases in workers PPE non-compliance rates, improvements in variable compliance rates, reductions in severe fatalities through guidelines that are customized according to the worker, and accelerations in safety performance achievements are expected.

  • PDF

Overview of Human Adaptive Mechatronics and Assist-control to Enhance Human's Proficiency

  • Suzuki, Satoshi;Furuta, Katsuhisa;Harashima, Fumio
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1759-1764
    • /
    • 2005
  • Human Adaptive Mechatronics(HAM) is a new concept which was proposed in our university's research project sponsored by Japanese Ministry of Education, Sports, Culture, Science and Technology(MEXT), and is defined as "intelligent mechanical systems that adapt themselves to the user's skill under various environments, assist to improve the user's skill, and assist the human-machine system to achieve best performance". In this paper, the concept and key-items of HAM are mentioned. And the control strategy to realize a HAM human-machine system is explained in the case of physical-interface system, i.e. haptic system. The proposed assist-control of a force-feedback type haptic system includes online estimation of a operator's control characteristics, and a `force assist' function implemented as a change in the support ratio according to the identified skill level. We developed a HAM-haptic device test system, executed evaluation experiments with this apparatus, and analyzed the measured data. It was confirmed that the operator's skill could be estimated and that operator's performance was enhanced by the assist-control.

  • PDF

Integrated design system for supporting product development process ($ezDesign^{(R)}$ System) (제품개발 프로세스를 지원하는 통합설계환경)

  • Lee, Sang-Bong;Kim, Su-Ok;Hong, Tae-Hwa
    • Proceedings of the KSME Conference
    • /
    • 2001.06c
    • /
    • pp.357-360
    • /
    • 2001
  • Design Engineering Group, LG Production engineering Research Center has been developing The Integrated Design Environment enabling engineering design task with ease, speedy and accurate for several years targeting the design departments in LG Electronics. $ezDesign^{(R)}$ System is consisted by Engineering Database Management, Engineering Knowledge Management, 3D Design Application, Design Evaluation Method and Project Management. Engineering Database Management manage the design information effectively. Engineering Knowledge Management takes control of design knowledge from design engineering activity systematically. It is possible for the engineering designer to utilized 3D CAD easily by 3D Design Application. Design Evaluation Method can evaluate several design alternatives synthetically. In Project management System, Designer can simulate the project schedule and cost. In this report, We will introduce how design process can be innovated by way of $ezDesign^{(R)}$ System.

  • PDF

정부출연연구기관에서의 자금조달환경의 불확실성이 관리통제시스템에 미치는 영향 - PBS 제도 도입을 중심으로 -

  • 이민형
    • Journal of Technology Innovation
    • /
    • v.11 no.1
    • /
    • pp.177-193
    • /
    • 2003
  • This paper examines empirically if the increase of funding uncertainty in government supported R&D institutes(GSRIs) in Korean cause managers to use more effective management control practices. Recently government introduced a new government R&D budget management system, based on competition, named PBS(Project Base System). Government requires GSRIs to be self-supporting and compete for funding from government. The introduction of new budget management system named PBS, has resulted in the increase of funding uncertainty in GSRIs. According to institutional theory, government organizations gain legitimacy by conforming to external expectations regarding management control practices, In contrast, contingency theory proposes that management control practices are driven by the fit between the technical features of the environment and the management control practices. The contingency literature provides that one external factor expected to motivate government managers to use more efficient control practices is the presence of competition and funding uncertainty. This paper use both theoretical perspective to develop hypotheses and examine the influence of funding environment on management control practices. Results show that the more institutionalized environment, the more managers in GSRIs rely on bureaucratic mode of control for conforming to external requirements, and the greater the funding uncertainty, the more managers use results and personal modes of control to improve research team performance.

  • PDF

A Study on the System-level Test and Evaluation for the CBTC System (CBTC 시스템에 대한 시스템 수준의 시험평가 방안 연구)

  • Lee, Young-Hoon;Lee, Jae-Chon
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.12
    • /
    • pp.115-121
    • /
    • 2008
  • The communication-based train control (CBTC) technology is a kind of railway signaling technologies and is to control the train operation through communication. A project adopting the CBTC technology is in progress and its object is to develop interoperable and interchangeable subsystems. Thus the purpose of this paper is on how to develop the required subsystems and integrate them successfully without sufficient design information at the system level. Accordingly this project shall require the integration and test at the system level. In order to do so, a top-level system specification shall be needed, which is not available in the current phase of the project. The main objective of the test and evaluation activities is to see whether the developed system meets the system specification. In this paper, we describe how the test and evaluation can be carried out based on the subsystems design specifications, considering the system architecture and the operation concept of the existing system as well.

A Review of Large-Scale Hydropower Project in Public Sector of Pakistan

  • Umair, Muhammad;Choudhary, Muhammad Abbas;Jahanzaib, Mirza
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.4
    • /
    • pp.47-59
    • /
    • 2014
  • Client organization inadequate project planning before awarding the contract and insufficient monitoring and control system among the parties involved create severe problems. Ultimately, large-scale projects go beyond the expected cost and time control limits. This paper discusses the major issues involved with a large-scale Hydropower Project in Pakistan Public Sector environment. The latest approved Baseline Plan of project was reviewed and analyzed using Variance Analysis and Trend Analysis techniques in Primavera project management software to assess the efforts made of the parties involved. It was found that Project is 202% Cost overrun and 25% time delays from original contract award. After analysis of baseline plan and quantification of various variance issues in impacted activities, the questionnaire survey was conducted to identify the impact of causative factors. There were almost 17 most significant causative factors identified among 60 identified factors and responsibilities are assigned accordingly. At the end recommendations are made for strategic decisions as lessons learned during project evaluation.

A Study on Flexible Automation of a Laser Semicutting System using the Path Control of Manipulator (매니퓰레이터의 궤적 제어를 이용한 레이저 부분 절단 시스템의 유연한 자동화에 관한 연구)

  • 김승우;조영완;박민용
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.4 no.6
    • /
    • pp.786-794
    • /
    • 1998
  • This paper proposes an automatic microshaping technology using laser and applies it to implementation of semicutting control system of the panel inside which a car air bag is equipped. Since it is impossible to project laser directly onto the desired working point of a target panel due to fixedness of laser generator, we reflect the generated laser, using reflection mirrors and focusing lenses, to project onto the desired working point. Also, in order to conduct an uniform semicutting control with constant width and depth, we control the end-effector of manipulator, which grasp the laser reflection mirror, to track working path with constant speed and orientation. The validity and effectiveness of the proposed methods are checked through experiments tracking a path formatted with straight lines and arcs.

  • PDF

Development of Optical Signal Transmission for the KSTAR Project Pertaining to Instrumentation and Control of the Neutral Beam Test Stand at KAERI

  • Jung, Ki-Sok;Oh, Byung-Hoon
    • KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
    • /
    • v.5B no.3
    • /
    • pp.289-295
    • /
    • 2005
  • Instrumentation and Control (I&C) of the Neutral Beam Test Stand (NB- TS) Facility at the Korea Atomic Energy Research Institute (KAERI) for the Korea Superconducting Tokamak Advanced Research (KSTAR) project has been underway since the start of the project to answer the diverse requests arising from the various facets of the development and construction phases of the project. Optical signal transmission constitutes a significant portion of I&C works and has been performed for the entirety of the project. During the NB- TS construction and related experiments, significant achievements to a more accurate as well as more refined optical signal transmissions have been made. Examples of those I&C works that utilized the optical signal transmission are the Langmuir probe signal transmission, gradient grid current signal transmission, gas flow control and signal transmission, ion source temperature measurement, beam line component temperature monitoring, and coolant flow signal transmission, etc. These optical signal transition provisions are now performing part of the indispensable functions for the proper operation of the NB- TS facility. Attained experience and expertise are expected to be well applied to the upcoming main neutral beam injection (NBI) system construction for the KSTAR project.

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF