• 제목/요약/키워드: Project Assessment

검색결과 1,271건 처리시간 0.027초

Development of safety system for Road Tunnel - The study of Quantitative risk assessment for middle scale road tunnel with natural ventilation system - (도로터널 방재시스템 개발 - 자연환기를 수행하는 중규모 도로터널의 정량적 위험도평가관한 연구 -)

  • Yoo, Ji-Oh;Shin, Hyun-Jun;Kim, Jong-Won
    • Proceedings of the SAREK Conference
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.67-70
    • /
    • 2008
  • As a part of the project on road tunnel fire safety system development, Quantitative Risk Assessment program was developed. In this study, We carried out Quantitative Risk Assessment with this program by using a factor of cross passage interval, warning announcement time and congestion ratio etc for 1km tunnel with natural ventilation. In the case of 250m below of cross passage interval, Risk value due to warning announcement time was a slightly changed. but if cross passage interval is more than 250m, expected fatalities in the same HRR(heat release rate) was sharp increased. As a result, Quantitative Risk Assessment program which was developed in this research project is possible to risk assessment with ventilation type, cross passage for evacuation and detection system response property etc. hereafter, this program look forward to use as a tool for road tunnel performance based design.

  • PDF

RAMS Management Planning in CBTC System Development for Metropolitan Railroad Applications (도시철도용 CBTC시스템 개발을 위한 RAMS관리계획 수립에 대한 연구)

  • Shin, Duc-Ko;Kim, Gon-Yop;Oh, Seh-Chan;Yoon, Yong-Ki
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.711-716
    • /
    • 2011
  • Ministry of Land, Transportation and Maritime Affairs of Korea has started a research project on verification process and safety assessment of Communication Based Train Control (CBTC) system for metropolitan railroad control as a 3-year project starting from 2010. As a number of companies has made efforts in securing the technologies for domestic production of CBTC systems, the purpose of the project is to develop the specification for interoperability with the considerations for local environments including metropolitan train operations and wireless communications. And the developed systems and the RAMS related outcomes from the participating companies are subject to Independent Safety Assessment (ISA) performed by a foreign specialized agency and the corresponding certificates are to be issued as a part of the project. In this paper, the RAMS management for verification and commercialization of metropolitan railroad CBTC systems has been studied. The study includes response strategy for the requirements of international standards, responsibility and authority of the related institute and the companies, quantitative RAMS objectives, and risk management strategies in project fulfillment.

  • PDF

An Analysis and Evaluation of the Effectiveness of Decision Making During the Review of Scientifically Constructed Project Proposals

  • Abdykerova, G.Zh;Bukayeva, A.D.
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • 제3권2호
    • /
    • pp.31-44
    • /
    • 2008
  • A selection technique for innovative projects on the beginning stage has been presented in this article. It can be applied in projects assessment in HEI, enterprises, development institutes, etc. It is rather difficult to assess the project quality on the beginning stage of R&D due to the uncertainty in the technical and economic indices but the new development analysis on this stage is of a great interest. By innovative project quality as a management object we will mean those characteristics relating to the results capacity of the projects and its realization process to satisfy the requirements to the innovative products competitiveness and their innovative attractiveness for investors. The most important question in the innovative projects management is the determination of its quality level under modern conditions. The aim of the research is to analyze and evaluate the decision making during the project management process. The objectives and hypotheses are assessment of an innovative project with the application of McKinsey's model is better to realizes by 3 stages: a) selection of optimal criteria; b) determination of weighing coefficients; c) projects positioning in a matrix.

  • PDF

An assessment of the Systems Engineering Capability Maturity of the Railway Safety Project applied the Systems Engineering (시스템엔지니어링을 적용한 철도안전프로젝트의 시스템엔지니어링 능력성숙도 평가)

  • Choi, Yo Chul;Lee, Jae Chon
    • Journal of the Korean Society of Systems Engineering
    • /
    • 제4권2호
    • /
    • pp.55-61
    • /
    • 2008
  • In this paper, there is the case study which assesses the systems engineering capability maturity of the safety organization that performs the Railway Safety project using systems engineering method. To In ore effective and efficient a research and development to railway safety domain, a new research and development method can be progressively needed such as systems engineering. To assess quantitatively research of systems engineering efforts in the railway safety project, SECM(EIA/IS 731) Standard is utilized in the paper. It is by questionnaire that the capability maturity assessment is executed wit h the safety organization and staffs who performs the systems engineering activities; requirement analysis and management, interface control management. product verification and validation, and so on. As a result, the systems engineering capability level of the safety organization rises from 0 level at the initial project to 2 level after two years and all staffs give an affirmative answer about the importance and effectiveness of the systems engineering approach.

  • PDF

A Decision Support System for Small & Medium Construction Companies (SMCCs) at the early stages of international projects

  • Park, Chan Young;Jang, Woosik;Hwang, Geunouk;Lee, Kang-Wook;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.213-216
    • /
    • 2015
  • Despite the significant increase of Korean contractors in the international construction market, many SMCCs (Small & Medium Construction Companies) have suffered in the global financial crisis, and some of them have been kicked out of the international market after experiencing huge losses on projects. SMCCs face obstacles in the international market, such as an insufficient ability to gather information and inappropriate management of associated risks, which lead to difficulties in establishing effective business strategies. In other words, making immature decisions without an effective business strategy may cause not only the failure of one project but also the bankruptcy of the SMCC. To overcome this, the research presented herein aims to propose a decision support system for SMCCs, which would screen projects and make a go/no-go decision at the early stages of international projects. The proposed system comprises a double axis: (1) a profit prediction model, which evaluates 10 project properties using an objective methodology based on a historical project performance database and roughly suggests expected profit rate, and (2) a feasibility assessment model, which evaluates 17 project environment factors in a subjective and quantitative methodology based on experience and supervision. Finally, a web-based system is established to enhance the practical usability, which is expected to be a good reference for inexperienced SMCCs to make proper decisions and establish effective business strategies.

  • PDF

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

IMPLEMENTATION OF TRL TOOLS TO KOREAN NATIONAL CONSTRUCTION AND TRANSPORTATION R&D PROJECTS FOR IMPROVING PRACTICAL USE

  • Namgyun Kim;Byungho An;Jaehong Choi;Hyunseok Lee;Sanghyuk Park;Yeasang Kim
    • International conference on construction engineering and project management
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.608-615
    • /
    • 2013
  • The major countries including Korea extend the national investment on R&D and implement the business performance diffusion policy as the knowledge based competition age arrives recently. The necessity for risk management and systematic management system for R&D achievement have been appeared to prevent the failure as the R&D scale becomes larger as it was said. For this matter, the organization such as NASA and DoD in USA defines the Technology Readiness Level (TRL) as a quantitative accomplishment management index and utilize the Technology Readiness Assessment (TRA) system as a criterion. Such tool is evaluated as very effective in the R&D project purposed the practicalization. It is expected that the disadvantage of evaluation system which is oriented to the academic accomplishment in its contents of current research and to contribute greatly to the practicalization of outcomes when such technology readiness level concept is applied to Korean national construction and transportation R&D project. Accordingly, this study analyzed the concept of TRL·TRA, the characteristics and current evaluation management system of Korean national construction and transportation R&D project and suggested the construction and transportation R&D project TRL·TRA performance model to accomplish the practicalization purpose.

  • PDF

A Study on the Improvement and Problems of Environmental Impact Assessment (환경영향평가 내용의 문제점과 개선방안 -문화재항목의 영향평가를 중심으로-)

  • 성현찬;안동만
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • 제21권2호
    • /
    • pp.91-106
    • /
    • 1993
  • The objective of this study is to prepare a proposal for desired changes in the laws and regulations system of the Environmental Impact Assessment (EIA) about cultural assets preservation. The related Korean regulatory system and literature for EIA have been surveyed and case studies have been analyzed and actual cases where cultural assets protection were of issue have been studied to deduce the problems of those areas. Based on the result of this study, proposed changes are as follows; 1. "Status of cultural Assets" is to be included as common assessment factor for all categories of object projects in "Table 2: Essential Assessment Factors for Individual Project Category" of "Ordinance for Preparation of EIA Statement, etc." 2. "Status of Underground Cultural Assets and Potential Underground Cultural Assets" is to be inserted as a survey factor in "Table 3:Format of and Instruction for Impact Statement". 3. The clause of "-- the survey should be performed on-site and the investigation report should be submitted." is to be inserted in methods of survey in "Table 3". 4. Ground survey of cultural assets should be performed prior to completion of project planning, that is, from the stage of pre-study for site selection. 5. The application of impact abatement from "Methods and Plants for Impacts Abatement" of "Report for Development of EIA Statement Technologies" should be included, with proper modification of timing, in "Ordinance for Preparation of EIA Statement, etc." 6. The expense liability clause in "Cultural Assets Preservation Act" is to be revised as "a certain ratio of expenses for excavation should be borne by the government." 7. Regulatory device for collecting appropriate opinions should be established. It may include Cultural Assets Preservation Committee's hearing to the project owner's opinion. be established. It may include Cultural Assets Preservation Committee's hearing to the project owner's opinion.

  • PDF

Evaluation of Environmental Stress for Highway Construction Project by Life Cycle Assessment Method (전과정평가기법에 의한 도로건설공사 환경부하량 평가 연구)

  • Moon, Jinseok;Ju, Kibeom;Seo, MyoungBae;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • 제15권6호
    • /
    • pp.83-91
    • /
    • 2014
  • The global community demands the reduction of environmental pollution such as greenhouse gas and carbon dioxide emissions. According to these requirements, the road construction project in the highest energy consuming industry is required the efficient way of reducing environmental pollution emissions. In this study, during the whole life cycle process, an environment impact assessment was performed for the several road construction projects in order to evaluate environmental stress through the road construction process. This study provides a proper process of environment impact assessment for life cycle assessment (LCA) analysis of road construction project, and figures the environmental stress regarding to the major construction materials for the case projects. In addition, this study conducted a sensitivity analysis for the key materials of environmental stress through the quantity analysis of major materials for the 1km section of a road construction. By this sensitivity analysis of total environmental stress change from the different volumes of constructing materials, it would be useful information for the environment impact assessment for the future road construction project.

Analysis of Competency Assessment Using IPA for Construction Project Managers (IPA 기법을 활용한 현장소장 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Lee, Na-Kyung;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • 제14권1호
    • /
    • pp.115-123
    • /
    • 2013
  • Changes have occurred in the professional capabilities of the construction project managers after the global financial crisis. As representatives of construction companies and projects, construction project managers have full responsibility over a construction project. Throughout its life cycle, from design through construction to completion, the business capabilities of such managers are regarded as critical elements in the changes in the country's construction economy. Therefore, this study aimed to determine the main capabilities of current construction project managers, and to analysis of its competitiveness using Important-Performance Analysis(IPA). The results of IPA were as follows; (1)capability to win new contracts and capability to collect information of new project are needed for external relation competitiveness, (2)gerentocratic management mind-set and active breakthrough are needed for internal project management competitiveness, and (3)capability to predict issues and self-improvement are needed for self discipline competitiveness. However, this work is still considered to provide the basic data that can help Korean construction companies who plan to educate the project manager's strengthen their medium and long-term capabilities.