A Study on the Improvement and Problems of Environmental Impact Assessment

환경영향평가 내용의 문제점과 개선방안 -문화재항목의 영향평가를 중심으로-

  • Published : 1993.07.01

Abstract

The objective of this study is to prepare a proposal for desired changes in the laws and regulations system of the Environmental Impact Assessment (EIA) about cultural assets preservation. The related Korean regulatory system and literature for EIA have been surveyed and case studies have been analyzed and actual cases where cultural assets protection were of issue have been studied to deduce the problems of those areas. Based on the result of this study, proposed changes are as follows; 1. "Status of cultural Assets" is to be included as common assessment factor for all categories of object projects in "Table 2: Essential Assessment Factors for Individual Project Category" of "Ordinance for Preparation of EIA Statement, etc." 2. "Status of Underground Cultural Assets and Potential Underground Cultural Assets" is to be inserted as a survey factor in "Table 3:Format of and Instruction for Impact Statement". 3. The clause of "-- the survey should be performed on-site and the investigation report should be submitted." is to be inserted in methods of survey in "Table 3". 4. Ground survey of cultural assets should be performed prior to completion of project planning, that is, from the stage of pre-study for site selection. 5. The application of impact abatement from "Methods and Plants for Impacts Abatement" of "Report for Development of EIA Statement Technologies" should be included, with proper modification of timing, in "Ordinance for Preparation of EIA Statement, etc." 6. The expense liability clause in "Cultural Assets Preservation Act" is to be revised as "a certain ratio of expenses for excavation should be borne by the government." 7. Regulatory device for collecting appropriate opinions should be established. It may include Cultural Assets Preservation Committee's hearing to the project owner's opinion. be established. It may include Cultural Assets Preservation Committee's hearing to the project owner's opinion.

Keywords