• Title/Summary/Keyword: Profit cost

Search Result 771, Processing Time 0.03 seconds

A Study on the optimum scale of the number of beds of both the standard and the high-class (기준병상수와 상급병상수의 적정규모에 관한 연구)

  • Back, Seung-Joon;Yu, Seung-Hum;Sohn, Tae-Yong
    • Korea Journal of Hospital Management
    • /
    • v.6 no.3
    • /
    • pp.109-129
    • /
    • 2001
  • The purpose of this study was the acquisition of the optimum scale of the apportionment of standard & high-class bed for the maximum profit representative of the desire of customers in a General Hospital with 1,100 beds located in Seoul. This investigation was proceeded by the analysis of the result of the simulation with the survey of both the patients' needs for bed and the degree of the medical service by the grade of the ward. And finally the consequence was obtained as follows: 1. The result of the investigation of the inpatients' preference for the grade of ward classes shows that a private ward reflected 4.3 percent, a semi-private ward 1.7 percent, a three-bed ward 0.1 percent, and a ward with six beds 93.9 percent each other. 2. A questionnaire poll was paralleled of service terms of a medical doctor and a nurse by ward class, the data were used for the standard of the allotment of labor cost by the ward class. The poll shows that the service tenn of a medical doctor and a nurse based on a ward with six beds by ward class showed 1.7 times in internal medicine and 1.9 times in surgery at a private ward; 1.4 times in internal medicine and 1.7 times in surgery at a semi-private room; and 1.2 times both in internal medicine and in surgery at a three-bed ward 3. The resultant findings revealed the most profit per bed and per patient in a private ward. However, an analysis of profit with a standard of unit area by ward class represented a higher profit in both the internal medicine and the surgery semi-private ward than other ward classes. 4. The result of the analysis through simulation based on the data of the prime cost per the ward class proved the optimum scale of the distribution of beds by class as follows: sixteen beds of the internal medicine and twenty three beds of the surgery in the private ward; two hundreds and two of the internal medicine and one hundred and ninety eight of the surgery in the semi-private room; three of both the internal medicine and the surgery each other in the three-bed ward; one hundred and ninety eight of the internal medicine and two hundred and fifty two of the surgery in the ward with six beds. The result of this research exhibits that the income and expenditure of the hospital could be improved by changing parts of wards into private ones(containing the maximum profit per a unit of width) in case the scale of the number of beds is reset with the consideration of the profit per the unit width. In the near future it's strongly expected that the research for the more scientific standard of the allotment of labour cost by ward class and for definition of the optimum scale of the number of beds that actualize the maximum profit with the change of the three elements of the prime cost: cost of materials; labor costs; management expenses.

  • PDF

A Study on the Profit Increase through a New Production/Distribution Method at S Plastic Injection Molding Factory (S 플라스틱 사출성형 공장에서 새로운 생산/배송 방법에 의한 수익증가의 연구)

  • Jung, Gyu-Bong;Park, Yang-Byung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.48-54
    • /
    • 2010
  • S plastic injection molding factory located at Namdong Industrial Complex in Incheon produces plastic parts for semiconductor, vacuum cleaners, office furniture, etc. It produces the parts to customers' order and delivers them directly to customers at due dates using the trucks of freight company. In recent years, it has been suffered from the excessive production cost, high lost sales rate, rigid response to customers' order, and high delivery cost, which affect negatively on its profit. This paper introduces a case study on the profit increase through a newly proposed production and distribution method which applies a make-to-stock and multi-visit delivery strategy at S plastic injection molding factory. The proposed method is evaluated by comparing with the current method with respect to sales profit using the historical data of customer demand. It is confirmed through the computational experiments that the proposed production and distribution method yields almost double increase in profit resulted from the increased production, reduced lost sales, reduced production cost, and reduced delivery cost.

Management for Company Objectives with Considerations of Optimal Production/Sales Planning (최적 생산/판매 계획을 통한 기업 목표 관리 사례)

  • Jung, Jae-Heon
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.34 no.2
    • /
    • pp.77-90
    • /
    • 2009
  • Total profit level Increases if a company increase the cost for achieving R&D related goals of equipment productivity enhancement, production cost saving, or for achieving equipment scale target, sales volume goal. But how much money should be invested to achieve a certain level of profit? We formulated the model to set the optimal goal levels to minimize the investment cost under the constraint that certain level of total profit should be guaranteed. This model derived from a case of P steel company. We found that this should be considered in relation with the production sales planning (known as optimal product mix problem) to guarantee the profit. We suggested a nonlinear programming model, 3 valiant form of the p+roduct mix problem. We can find the optimal Investment level for the R&D related goals or sales volume goal, equipment scale target for the P steel company using the model.

Analysis of Current Operational Practices and Issues of Contract-Managed Foodservice Companies in Republic of Korea (위탁급식 전문업체의 운영 현황 조사 및 현안과제 분석)

  • Eom, Yeong-Ram;Ryu, Eun-Sun
    • Journal of the Korean Dietetic Association
    • /
    • v.9 no.3
    • /
    • pp.197-208
    • /
    • 2003
  • This study was surveyed to provide the information on current operational practices and issues of contract-managed foodservice companies. Questionnaires were distributed to 79 contract-managed foodservice companies (eight large-size, 48 mid-size, 23 small-size companies) from March to May in 2002. The contract-managed foodservice companies provided averages of 269,184 (range 140,036-503,500), 14,837 (range 450-75,269), and 4,065 (range 930-8,050) meals daily from large, medium, and small-size companies, respectively. The companies managed to averages of 268.2 (160-619) foodservice contracts at large-size companies, 21.9 (5-63) contracts at mid-size companies, and 4.7 (1-10) contracts at small-size companies. The average numbers of dietitians were 298.6 (range 104-671) in large-size companies, 22.2(6-86) in mid-size companies, and 3.8(1-9) in small-size companies. The averages of sales were 156.5 billion at large-size companies, 6.7 billion at mid-size companies, and 1.7 billion at small-size companies in 2001. The contract was two types including management fee contract(5%), and profit and loss contract(95%). The cost ratios for office foodservice were 59.5% at food cost, 24.2% at labor cost, 6.3% at profit, and 10.1% at other cost. For hospital foodservice, the ratios were 54.0% at the food cost, 34.6% at labor cost, 3.0% at profit, and 11.8% at other cost. For high school foodservice, the ratios were 62.2% at the food cost, 21.5% at labor cost, 5.4% at profit, and 11.2% at other cost. When the contractors managed to the foodservice, the most important matters were the sanitation management and customer satisfaction. Also, the difficult problems were excess investment of equipments and low meal prices.

  • PDF

Complete Time Algorithm for Stadium Construction Scheduling Problem

  • Lee, Sang-Un
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.9
    • /
    • pp.81-86
    • /
    • 2015
  • This paper suggests heuristic algorithm with linear time complexity to decide the normal and optimal point at minimum loss/maximum profit maximum shortest scheduling problem with additional loss cost and bonus profit cost. This algorithm computes only the earliest ending time for each node. Therefore, this algorithm can be get the critical path and project duration within O(n) time complexity and reduces the five steps of critical path method to one step. The proposed algorithm can be show the result more visually than linear programming and critical path method. For real experimental data, the proposed algorithm obtains the same solution as linear programming more quickly.

A study on the MVNO Wholesale Price in Competitive Communication Service Market (경쟁적인 통신서비스 시장에서 MVNO 도매대가 산정에 관한 연구)

  • Sawng, Yeong-Wha;Bae, Khee-Su;Jeon, Heung-Joo
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.2
    • /
    • pp.217-231
    • /
    • 2012
  • In the past, companies should make enormous facility investment and acquire a right to do business in order to join communication markets, but now they can do business without important facilities, such as communication networks. Such a movement to ease regulations about companies which want to newly join the communication industry is expected not only to change a competition frame of the mobile communication market but also to greatly affect the entire communication industry. Through this study aiming to look into a way to calculate a reasonable wholesale price related to the government's introduction of the Mobile Virtual Network Operator (MVNO) system, I came up with a following result. I applied the operating profit percentage and the ratio of operating gain to cost to the cost plus model and retail minus model, respectively, to calculate the wholesale price and found that when I calculated with the cost plus model applying the operating profit percentage, I could get the highest wholesale price. On the other hand, I got the lowest wholesale price with the retail minus model by applying the operating profit percentage. Division of expenses and calculation of profit percentage are important factors in calculating the wholesale price and such results are expected to help accurate calculation of the MVNO wholesale price.

Financial Ratio Analysis of Oriental Medicine Hospital affiliated with Universities (한의과대학 부속 한방병원의 재무비율 분석 -본원과 분원의 비교를 중심으로-)

  • Lee, Woo-Chun
    • Journal of Society of Preventive Korean Medicine
    • /
    • v.18 no.1
    • /
    • pp.43-52
    • /
    • 2014
  • This study was conducted to analyze if there is a difference between the head hospital and branch hospital by comparing the profitability and operating expenses to patient revenue of oriental medicine hospitals affiliated with universities in order to find whether opening branch hospitals is an appropriate method to increase profitability. Profit indices used for the comparison of head hospital and branch hospital include ratio of operating profit on medical revenue, net-income on medical revenue, net profit to total assets, and operating profit to total assets; and cost indices included ratio of labor costs, material costs and administrative costs. In comparison of profit indices of head hospitals and branch hospitals, head hospitals displayed negative(-) in all four profit index averages while branch hospitals displayed positive(+), showing that branch hospitals have higher profitability. In particular, in the case of head hospitals, ratio of net profit to total assets was -13.6%, while that of branch hospitals was 12.9%, which was higher than 3.1%, the average of Korean oriental medicine hospitals in 2011. As a result of difference analysis between groups of head hospitals and branch hospitals, profit indices of ratio of operating profit on medical revenue, net-income on medical revenue, and ratio of net profit to total assets were found to vary by hospitals, but there was no statistically significant difference between head hospitals and branch hospitals(p<0.1). Only the ratio of operating profit to total assets of head hospitals and branch hospitals indicated significant difference between the two groups, showing that ratio of operating profit to total assets of branch hospitals is larger than that of head hospitals. Meanwhile, the cost indices of ratio of labor costs, material costs and administrative costs in the difference test results did not show significant difference between the head hospital and branch hospital(p<0.1). Thus, it cannot be said that a certain oriental medicine hospital's profitability is high or low depending on whether it is head hospital or a branch as profitability varies depending on the management environment of the hospital. Therefore, oriental medicine hospitals affiliated with universities would need to make efforts to increase their profitability as an individual hospital rather than focusing on whether they are head hospital or a branch.

The Derivation of a Model to Estimate Compensation for Damages in Chartered Fisheries by Using CVP Analysis (CVP 분석을 이용한 면허어업 손실보상액 평가 모형의 도출)

  • 정형찬
    • The Journal of Fisheries Business Administration
    • /
    • v.31 no.2
    • /
    • pp.133-153
    • /
    • 2000
  • During the last several decades, Korea has been regarded as one of the fastest growing economies in the world. However, the small size of national land has not met the vigorous demand for land necessary to develop economic infra-structures such as large-scale harbors airports and highways. In order to satisfy the growing demand for land, the Korean government and industry have implemented the national land development programs to reclaim land from the sea fur the several decades. It is certain that these land development programs have resulted in a lot of property disputes between fishermen and public project administrators. This paper is to develop a quantitative model to estimate compensation for damages or restriction of charted fisheries resulting from large-scale public projects. In this paper, the compensation model is derived by using cost-volume-profit analysis framework because the compensation for charted fisheries basically depends on the factors such as the costs, production volume, profit of charted fisheries damaged or restricted by public projects. The model shows that the compensation for damages or restriction of charted fisheries is determined by the average annual profit, damage duration period, and the degree of fishery damages. In addition, the degree of fishery damages measured by the ratio of lost profit to annual average profit turns out to be determined by the following factors: annul profit, unit variable cost, decrease in production volume, the rate of increase in variable cost, and a change in fixed cost. Furthermore, this parer discusses the nam issues related to practices and regulation of the compensation for fishery damages in the current Fishery Act of Korea and suggests some appraisal methods which will be able to lead to theoretically correct and fair compensation for fisheries damages resulting from large-scale public projects.

  • PDF

A Study on the Economics Evaluation using Weighted Average Cost of Capital (가중평균자본비용을 이용한 투자 안의 경제성평가에 관한 연구)

  • 김태성;구일섭
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.4
    • /
    • pp.135-144
    • /
    • 2001
  • The capital cost of the company is one that must be paid to the money owner as the price by using the money. The capital cost according to the source of money supply can be estimated by the expected profit rate undertaken by the use of the capital. But in the area of pre-existent economic evaluation, the evaluation of the company investment has been treated by the profit rate of the capital after considering the repayment conditions of the other's money or the interest. Thus in this study, in case the company makes an investment on various kinds of the capital at the same time, not make use of the capital as a one source, the economic evaluation of an investment should be handled by taking the weighted average cost of capital into consideration in proportion to the constitution of the capital cost by the sources of money supply, Especially, as the cost of the private money is very much connected with the profit rate through the stock market, the Capital Asset Pricing Model (CAPM) will be applied. This kind of economic evaluation method can be said to have much to do with the Economic Value Added : EVA) as well as to be highly thought as a standard to estimate the company' value recently To certify the usefulness of this approach, the case study of the output of the capital cost will be made for the purse of the economic evaluation of the alternative investment by using the financial statements of a motor company H.

  • PDF

An Economic Two-Sided Screening Procedure Using a Correlated Variable with Multi-Decision Alternatives (다 결정 대안을 갖는 대용특성을 이용한 경제적 양측 선별검사방식)

  • Hong, Sung-Hoon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.3
    • /
    • pp.387-396
    • /
    • 1995
  • For situations where there are several markets with different profit/cost structures, an economic two-sided screening procedure using a correlated variable is developed. It is assumed that the performance variable and the screening variable are jointly normally distributed. A profit model is constructed which involves selling price, cost incurred by imperfect quality, and screening inspection cost. Methods of finding the optimal screening procedure are presented and numerical examples are given.

  • PDF