• Title/Summary/Keyword: Procurement System

Search Result 435, Processing Time 0.022 seconds

Review of Laser Based Uranium Enrichment Technology for Nuclear Power Fuel Production (원전연료 생산을 위한 레이저 공정 개발동향)

  • Kim, Jae-Woo;Lee, Jae-Chul;Yang, Maeng-Ho
    • Journal of Korea Technology Innovation Society
    • /
    • v.14 no.4
    • /
    • pp.965-982
    • /
    • 2011
  • Currently, dependency of natural and energy resources on world economy may not be more serious than any before increasing the uncertainty of Korea's national economy, especially as China uses unexpectedly fast glowing portion of world resources. Due to insufficient natural resources and unmatured renewable energy system, it is very important for Korea to secure the energy sources not only for national prosperity but also security for the future. In this regard, importance and necessity of nuclear energy as a major electric power source in Korea are in need to be emphasized. Korea currently imports all the necessary enriched uranium for fabrication of nuclear fuel from abroad. Thus, it is extremely important to establish a secured supply system for enriched uranium regardless of the global political unstability as well as economic fluctuation. In order to build the nuclear fuel procurement system, it is required to analyze the global market status, current enrichment service systems, and the future technology under development. For this purpose, this study comparatively analyzes the laser based advanced technology for uranium enrichment under development in the United States, which is assumed to be 2~3 times more economically viable than currently available technologies.

  • PDF

Effects of the Innovative Company Certification System on Technological Innovation Activities and Performance of SMEs (혁신형 기업 인증 제도가 중소기업의 기술적 혁신 활동과 성과에 미치는 영향)

  • Yoo, Hyoung Sun;Jun, Seung-pyo;Kim, Ji Hui
    • Journal of Korea Technology Innovation Society
    • /
    • v.20 no.4
    • /
    • pp.1212-1242
    • /
    • 2017
  • In this study, the effectiveness of the innovative company certification system, which is one of the important means of the SME innovation promotion policies, was examined in terms of technological innovation activity and performance. To this end, we used the results of 'SME Technology Statistical Survey' conducted by the Small and Medium Business Administration and the Korea Federation of Small and Medium Business in 2013~2015 to compare the innovative SMEs that have received the certifications such as Venture Certification, Innobiz Certification, and Mainbiz Certification with the general SMEs that did not. As a result, it was found that the innovative SMEs have comparative advantage in many detailed indicators related to the technological innovation activity and performance. However, the ratio of external use of R&D expenditure, the number of technology development attempts and the number of successes were not different according to the survey year, so it is necessary to strengthen the follow-up management of the system. On the other hand, the proportion of self-procurement R&D expenditure of the general SMEs was significantly higher than that of the innovative SMEs in all three-year surveys. Therefore, it is necessary to regulate the government funding for the innovative SMEs to be used as a complementary material, not as a substitute for their own R&D investment. In addition, the technological innovation activity and performance of a company were more influenced by the size of the company and the participating industry rather than by the certification, so it is necessary to consider it when establishing the technology innovation promotion policies.

Object Classification List for BIM-based Maintenance Information Modeling in Electrical and Telecommunications Field of Architecture (BIM 기반 유지관리정보 모델링을 위한 객체분류목록 개발 -건축 전기/정보통신 분야를 중심으로-)

  • Song, Jong-Kwan;Cho, Gen-Ha;Won, Ji-Sun;Ju, Ki-Beom;Bea, Si-Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.3183-3191
    • /
    • 2014
  • It is essential to effectively manage facilities because operating and maintenance cost for them accounts for more than 83% of lifecycle cost. This study developed BIM Object-based classification list to manage information required to operating and maintenance phase of them from design and construction phase. In order to develop this classification list, Construction Information Classification System, Design Criteria for Architectural Electrical Installations, commodity list classification of PPS(Public Procurement Service) were analyzed. and problems for consisting of object classification list were drawn. And each materials is classified that drawings discipline code (KSF 1540:2010 (Principle and criteria for CAD Drawing) was classified as level 1 to cover main areas and construction information classification system was classified as level 2 to cover elements also UNSPSC was classified as level 3 to cover objects for devices and equipments. this classification criteria was given code. This study is expected to be useful to exchange and share information in operating and maintenance phase by offering object point of view classification in design and construction phase. besides, it is looking forward to effective operating and maintenance of facilities by enabling management of devices and equipments by function, space, use.

A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price (건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구)

  • Sung, Ju-yong;Kim, Dong-jin;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.3-11
    • /
    • 2019
  • The construction of a facility is an act whereby infrastructure such as roads and railways and other facilities such as housing and office spaces are constructed, and due to the characteristics of the relevant industry where such construction is carried out in a custom order method, it requires a long period of time mostly. While the construction is carried out over a long period of time, fluctuations in the price of raw materials required for the construction occur. Therefore, the cost of the construction also fluctuates inevitably. The fluctuation of the construction cost meshes closely with the profit of a constructor and the efficiency of government spending. Therefore, it is necessary to maintain the construction cost at a reasonable level by adjusting the construction cost rationally in order to secure the required construction quality and spend the budget efficiently. The buffer system for solving such problem is the contract amount adjustment system by fluctuations in prices (Escalation/De-Escalation). In this study, the method combining the escalation method based on the item adjustment method was suggested for an efficient contract amount adjustment method. In addition, it is proposed that there be an investigation and codification of matters not applied to government acts and regulations on contracts related to the adjustment of fluctuations in prices legally.

Development of Intelligent ATP System Using Genetic Algorithm (유전 알고리듬을 적용한 지능형 ATP 시스템 개발)

  • Kim, Tai-Young
    • Journal of Intelligence and Information Systems
    • /
    • v.16 no.4
    • /
    • pp.131-145
    • /
    • 2010
  • The framework for making a coordinated decision for large-scale facilities has become an important issue in supply chain(SC) management research. The competitive business environment requires companies to continuously search for the ways to achieve high efficiency and lower operational costs. In the areas of production/distribution planning, many researchers and practitioners have developedand evaluated the deterministic models to coordinate important and interrelated logistic decisions such as capacity management, inventory allocation, and vehicle routing. They initially have investigated the various process of SC separately and later become more interested in such problems encompassing the whole SC system. The accurate quotation of ATP(Available-To-Promise) plays a very important role in enhancing customer satisfaction and fill rate maximization. The complexity for intelligent manufacturing system, which includes all the linkages among procurement, production, and distribution, makes the accurate quotation of ATP be a quite difficult job. In addition to, many researchers assumed ATP model with integer time. However, in industry practices, integer times are very rare and the model developed using integer times is therefore approximating the real system. Various alternative models for an ATP system with time lags have been developed and evaluated. In most cases, these models have assumed that the time lags are integer multiples of a unit time grid. However, integer time lags are very rare in practices, and therefore models developed using integer time lags only approximate real systems. The differences occurring by this approximation frequently result in significant accuracy degradations. To introduce the ATP model with time lags, we first introduce the dynamic production function. Hackman and Leachman's dynamic production function in initiated research directly related to the topic of this paper. They propose a modeling framework for a system with non-integer time lags and show how to apply the framework to a variety of systems including continues time series, manufacturing resource planning and critical path method. Their formulation requires no additional variables or constraints and is capable of representing real world systems more accurately. Previously, to cope with non-integer time lags, they usually model a concerned system either by rounding lags to the nearest integers or by subdividing the time grid to make the lags become integer multiples of the grid. But each approach has a critical weakness: the first approach underestimates, potentially leading to infeasibilities or overestimates lead times, potentially resulting in excessive work-inprocesses. The second approach drastically inflates the problem size. We consider an optimized ATP system with non-integer time lag in supply chain management. We focus on a worldwide headquarter, distribution centers, and manufacturing facilities are globally networked. We develop a mixed integer programming(MIP) model for ATP process, which has the definition of required data flow. The illustrative ATP module shows the proposed system is largely affected inSCM. The system we are concerned is composed of a multiple production facility with multiple products, multiple distribution centers and multiple customers. For the system, we consider an ATP scheduling and capacity allocationproblem. In this study, we proposed the model for the ATP system in SCM using the dynamic production function considering the non-integer time lags. The model is developed under the framework suitable for the non-integer lags and, therefore, is more accurate than the models we usually encounter. We developed intelligent ATP System for this model using genetic algorithm. We focus on a capacitated production planning and capacity allocation problem, develop a mixed integer programming model, and propose an efficient heuristic procedure using an evolutionary system to solve it efficiently. This method makes it possible for the population to reach the approximate solution easily. Moreover, we designed and utilized a representation scheme that allows the proposed models to represent real variables. The proposed regeneration procedures, which evaluate each infeasible chromosome, makes the solutions converge to the optimum quickly.

Analysis of Munitions Contract Work Using Process Mining (프로세스 마이닝을 이용한 군수품 계약업무 분석 : 공군 군수사 계약업무를 중심으로)

  • Joo, Yong Seon;Kim, Su Hwan
    • Journal of Intelligence and Information Systems
    • /
    • v.28 no.4
    • /
    • pp.41-59
    • /
    • 2022
  • The timely procurement of military supplies is essential to maintain the military's operational capabilities, and contract work is the first step toward timely procurement. In addition, rapid signing of a contract enables consumers to set a leisurely delivery date and increases the possibility of budget execution, so it is essential to improve the contract process to prevent early execution of the budget and transfer or disuse. Recently, research using big data has been actively conducted in various fields, and process analysis using big data and process mining, an improvement technique, are also widely used in the private sector. However, the analysis of contract work in the military is limited to the level of individual analysis such as identifying the cause of each problem case of budget transfer and disuse contracts using the experience and fragmentary information of the person in charge. In order to improve the contract process, this study analyzed using the process mining technique with data on a total of 560 contract tasks directly contracted by the Department of Finance of the Air Force Logistics Command for about one year from November 2019. Process maps were derived by synthesizing distributed data, and process flow, execution time analysis, bottleneck analysis, and additional detailed analysis were conducted. As a result of the analysis, it was found that review/modification occurred repeatedly after request in a number of contracts. Repeated reviews/modifications have a significant impact on the delay in the number of days to complete the cost calculation, which has also been clearly revealed through bottleneck visualization. Review/modification occurs in more than 60% of the top 5 departments with many contract requests, and it usually occurs in the first half of the year when requests are concentrated, which means that a thorough review is required before requesting contracts from the required departments. In addition, the contract work of the Department of Finance was carried out in accordance with the procedures according to laws and regulations, but it was found that it was necessary to adjust the order of some tasks. This study is the first case of using process mining for the analysis of contract work in the military. Based on this, if further research is conducted to apply process mining to various tasks in the military, it is expected that the efficiency of various tasks can be derived.

Research on Ways to Promote Community Care for People with Developmental Disability (발달장애인의 커뮤니티 케어 실현방안에 대한 연구)

  • Shin, Jun-Ok
    • Journal of Digital Convergence
    • /
    • v.18 no.6
    • /
    • pp.531-540
    • /
    • 2020
  • The purpose of this study was to present ways and tasks for the successful settlement of community care that the korea government recently aimed to convert the care system of the vulnerable from the center of institutional care to the community-based care system. As a research method, we tried to find out the community care policies for foreign developmental disabilities and explore major issues and problems in the process. As a result of the study, de-institutionalization and maintenance and enactment of laws related to community-based care systems, the division of subjects and tasks in policy implementation, and above all, it is necessary to specify necessary financial estimation, procurement plan, and budget securing method. In addition, sincere deliberation on the form of living space for people with developmental disabilities after de-institution and clarification of the subjectivity of using the services provided Establish reliable statistics on the characteristics and degree of disability of people with developmental disabilities, worry about human rights violation factors that can occur in community residential facilities that will be provided after de-facility, and create consensus in the community was also analyzed as an important factor. I think it is a key factor to secure the success of the community care policy by carrying out the above multiple tasks simultaneously.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

A Study on the Economic Analysis of the Defense Acquisition Projects -Focued on ○○ Guided Missile- (국방획득사업 경제성 분석에 관한 연구 -○○유도무기사업 사례를 중심으로-)

  • Lim, Yong-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.394-400
    • /
    • 2018
  • Recently, it is expected to significantly increase the defense budget by acquiring large-scale weapons systems to enhance defensive capabilities. In order to secure funds needed to acquire such weapons systems, it is necessary to improve the efficiency of the defense budget. In addition, interest in economic factors affecting the domestic economy such as export opportunities and employment creation are increasing, as well as budget reduction of the defense acquisition business. In order to respond to these demands, this study conducted cost- benefit analysis and examined economic ripple effects in the implementation of defense procurement projects. However, research on economic analysis methodology considering characteristics of defense acquisition projects is still in its early stage. This study proposes a methodology to analyze the economic feasibility of defense acquisition projects and conducted a case study on the economic feasibility of the ${\bigcirc}{\bigcirc}$ guided missile project which is being prepared against local provocation. The proposed economic analysis method provides the cost-effectiveness analysis that has been performed in many weapon system acquisition projects in connection with the more general cost-benefit analysis method. This study contributes to the establishment of an improved theoretical methodology for weapon system acquisition projects.