1 |
Moses, S., H. Grant, L. Gruenwald and S. Pulat, "Real-time due-date promising by buildto- order environments", International Journal of Production Research, Vol.42, No.20(2004), 4353-4375.
DOI
ScienceOn
|
2 |
Pibernik, R., "Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management", International Journal of Production Economics, Vol.93-94, (2005), 239-252.
DOI
ScienceOn
|
3 |
Srinvas, M. and L. M. Patnaik, "Adaptive Probbilities of Crossover and Mutation in Genetic Algorithms," IEEE Transaction on Systems, Man and Vybernetics, Vol.24, (1994), 656-667.
DOI
ScienceOn
|
4 |
Xiong, M. H., S. B. Tor and L. P. Khoo, "WebATP: a Web-based flexible available-to-promise computation system", Production Planning and Control, Vol.14, No.7(2003), 662-672.
DOI
ScienceOn
|
5 |
Xiong, M. H., S. B., Tor, L. P. Khoo and C. H. Chen, "A web-enhanced dynamic BOMbased available-to-promise system", International Journal of Production Economics, Vol.84, No.2(2003), 133-147.
DOI
ScienceOn
|
6 |
Yang, J. H. and Y. S. Choi, "A Case Study on Implementation of Global ATP System for A Global Manufacturing Company", Journal of the Korean Society of Supply Chain Management, Vol.3, No.1(2003), 33-40.
|
7 |
Han, J. Y., H. S. Jeong, J. T. Jeon and B. J. Jeong, "Development of an Efficient ATP System Using Safety Stock Level in Supply Chain Management", Journal of the Korean Society of Supply Chain Management, Vol.2, No.1(2002), 31-40.
|
8 |
Jeong, B. J., S. B. Sim, H. S. Jeong and S. W. Kim, "An Available-to-Promise (ATP) System for TFT LCD Manufacturing in Supply Chain", Computers and Industrial Engineering, Vol.43, No.1-2(2002). 191-212.
DOI
ScienceOn
|
9 |
Jung, H., I. Song, B. Jeong and W. Yoo, "An Optimized ATP (Available-to-Promise) System for Make-to-Order Company in Supply Chain Environment", International Journal of Industrial Engineering-Theory Applications and practice, Vol.10, No.4 (2003), 367-374.
|
10 |
Kim, N. H., S. J. Noh, G. N. Wang and S. C. Rim, "Production Planning and Order Receiving System for Capable-To-Promise in Supply Chain Management", IE Interfaces, Vol.13, No.3(2000), 396-404.
|
11 |
Kim, J. S., K. Y. Shin, Y. C. Kim and C. W. Moon, "Integrated production/dsitribution planning with non-integer time lag in supplay chain using adaptive genetic algorithm", Journal of the Korean Society of Supply Chain Management, Vol.4, No.2 (2004), 71-81.
|
12 |
Kim, J. S., K. Y. Shin and C. W. Moon, "A frame of the integrated production/distribution model with non-integer lags", Journal of Korean Institute of Industrial Engineers, Vol.31, No.2(2005), 120-126.
|
13 |
Moses, S. A., "Due Date Assignment Using Feedback Control with Reinforcement Learning", IIE Transactions, Vol.31, (1999), 989-999.
|
14 |
Cheng T. C. E., "Optimal Due-date Assignment in an Assembly Shop", International Journal of Operations and Production Management, Vol.14, No.2(1994), 31-42.
DOI
ScienceOn
|
15 |
함용석, 김태영, 알기 쉬운 생산운영관리–생산이론부터 ERP 실무지식까지, 서울 : 두남, 2010.
|
16 |
Chen, C. Y., Z. Zhao and M. O. Ball, "Quantity and Due Date Quoting Available to Promise", Information Systems Frontiers, Vol.3, No.4(2001), 477-488.
DOI
ScienceOn
|
17 |
Chen, C. Y., Z. Zhao and M. O. Ball, "A Model for Batch Advanced Available-To-Promise", Production and Operations Management, Vol.11, No.4(2002), 424-440.
|
18 |
Dobson, G. and E. Stavrulaki, "Capacitated, finish- to-order production planning with customer ordering day assignments", IIE Transactions, Vol.35, (2003), 445-455.
DOI
ScienceOn
|
19 |
Goldberg, D. E., The Design of Innovation, Kluwer Academic Pub., MA, 2000.
|
20 |
Hackman, S. T., and R. C. Leachman, "A General Framework for Modeling Production", Management Science, Vol.35, No.4(1989), 478-495.
DOI
ScienceOn
|
21 |
심승배, 한주윤, 정봉주, "공급사슬경영에 있어서의 납기 회신 시스템", IE Interface, Vol.13, No.3(2000), 405-415.
|
22 |
김태영, 함용석, "공급 사슬 관리를 위한 비 정수타임 랙을 갖는 ATP(Available-to Promise) 시스템", 대한경영학회지, 22권, 6호(2009), 3673-3691.
|