• Title/Summary/Keyword: Procurement Specification

Search Result 18, Processing Time 0.026 seconds

Performance-Oriented Procurement Process and VE/PSC for Private Finance Initiatives (민간투자사업의 성능중심적 발주방식 및 PSC의 활용방안)

  • Lim Jong-Kwon;Park Heung-Min;Jung Kun-Ho;Woo Ji-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.51-58
    • /
    • 2004
  • The input-oriented project promotion system private participation in infrastructure projects currently in use in Korea has encountered difficulties in securing the primary benefits of private sector creativity problem solving and inflow of private capital. As such, the performance (or output)-oriented procurement process implemented in England and other developed countries should be evaluated for introduction. In Korea, private participation projects are currently identified as either solicited or unsolicited projects, each with different promotional procedures, the problem with these procedures is that competition is not pre-activated, the private sectors creativity is under utilized, and the rationality of project evaluations is inconsistent. Korea should, in order to raise the level of private sector creativity and efficiency, go beyond the currently applied Input Specification project promotion system to a Performance-oriented system similar to those implemented in England and other countries. To achieve this, we mate several proposals for the introduction of the performance-oriented system. We divide the main features of our proposals into three categories, including a reformed concessionaire selection system, a performance orientation in preparation of the concession agreement, and a performance orientation in contract management, and discuss each. 1'his study describes performance-oriented promotion systems in an output-focused way As this is an initial study on the introduction of performance orientation in private participation, various key points and proposals were identified. However, in the future, detailed research in technical fields and systems, legal research, and practical projects will be needed for implementation

  • PDF

A Study on the Dispute Boards in International Medium and Long-term Transaction - Focus on the Construction Contract - (중장기 국제거래에서 분쟁해결위원회에 관한 고찰 - 건설계약을 중심으로 -)

  • Yu, Byoung Yook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.57
    • /
    • pp.79-108
    • /
    • 2013
  • International transactions of plant and construction project need to time to time for completing the contract. During the performing the contract there may arise many claims and disputes it should be settled rapidly for processing schedule of works. However, arbitration and litigation for settlement of dispute are inappropriate in time and expense under the specifications of plant and construction project. Dispute boards are one of the successful resolution method of dispute prior to litigation or arbitration. If the dispute board was failed, of course, it may be allowed to continue into litigation or arbitration. As the creative methods of parties agreement, dispute boards may be expected to avoid claims and dispute in long and medium international contract. The purpose of this paper is to explore the specification and limitations of dispute boards that may clear disputes under long and medium contract of construction and procurement. It needs to be understand to determine whether is the useful methods for resolving dispute in the international project. This paper considers the specific natures of dispute board and its rules, procedures and problems including ICC and FIDIC for the contract of long and medium transaction.

  • PDF

A study on RAMS parameters in the Procurement requirement for rolling stock (철도차량의 구매 요구사항에 포함되는 RAMS 특성값에 관한 연구)

  • Chung, In-Soo;Kim, Jong-Woon;Lee, Kang-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.780-788
    • /
    • 2008
  • As a railway is receiving attention as an environment-friendly transportation mode, many high speed, inter-city and urban railway are constructed and remodeled in the world. With this trend, railway RAMS was included in the international standard IEC 62278 in 2002. RAMS activity in domestic market is also increased with this international trend. However, IEC 62278 does not describe the methodology of substantial contents like how reliability target is set although it can be used as an overall guideline when RAMS requirements are included in the purchase specification. That is because RAMS requirements should be set with the specific railway condition. It is required to fully understand the meaning of railway RAMS parameters and apply those correspond to the specific railway system and environment condition especially when a quantitative RAMS requirement is set. In this study, the meaning and characteristics of RAMS parameters applicable to the development of quantitative RAMS requirement of rolling stock is described. And the basic concept of RAMS and the definition of failure that IEC 62278 describes is modified and suggested in order to make more suitable to the development of quantitative RAMS requirement.

  • PDF

A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases (설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안)

  • Park, Bo Sung;Kim, Sean Hay
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.12
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

Preparatory Applications for Performance-based Regulatory System in Japanese Landscape Architecture Related Fields (일본 조경관련 분야의 성능규정화 대비방안)

  • Kim, Min-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.5
    • /
    • pp.37-45
    • /
    • 2007
  • WTO/TBT requires that, for technical regulations affecting trade, technical regulatory requirements must be specified where possible in terms of performance rather than design or descriptive characteristics. The movement which made "performance" a keyword in landscape architecture was activated in Japan, one of the leading counties in performance-based regulatory system(PBRS). The Japanese recent movement of systematization activity on performance-based standards and specifications was reviewed and operational applications for performance-based regulatory system in South Korea are summarized as follows: 1. The establishment of performance standards that can be properly evaluated by assessment indicators is necessary in cases when quantitative evaluation is difficult. 2. As a preparation for PBRS, a brief procurement system by technical proposal for the landscape design and construction is necessary. 3. As a preparation for PBRS, activation of an environmental performance evaluation on experimental construction is necessary. 4. As a preparation for PBRS, a certification system of environmental performance on various landscape construction methods is necessary. 5. The Private Finance Initiative Project is the most similar to PBRS therefore, activation of the Private Finance Initiative Project is necessary in landscape architecture projects for park rehabilitation.

Corporate Vertical Coordination, and Farmer's Land Use in Contract Farming Relations between Discount Store and Contract Farmers: A Case Study of the Watermelon Farming District in Buyeo-gun, Chungcheongnam-do (대형마트와 농가 간 계약생산에서 계약기업의 수직적 조정과 계약농가의 토지이용: 충청남도 부여군 일대 수박 주산지를 사례로)

  • Jang, YoungJin
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.19 no.4
    • /
    • pp.712-728
    • /
    • 2016
  • This study examines the foundations of contract farming, the extent of corporate vertical coordination, and farmer's land use in regards to the contract farming between discount store and watermelon farmers in Buyeo-gun, Chungcheongnam-do. In the above case, contract farming is led by the group of producers. As the corporate's role is limited due to the specification of watermelon breed, contract farming takes the form of procurement contract with restrained levels of corporate vertical coordination. Thus, it has become common for contract farmers to freely enter and leave contracts and sign contracts with multiple clients. Furthermore, farmers participate in contract farming by using contract breeds in existing crop rotation systems. Through this process, watermelon farming is undergoing a process of diversification via the spread of contract varieties in this region.

A Study on the Revision Efficiency of Referenced Specifications/Standards for Raw and Subsidiary Materials in the Field of National Defense (국방분야 인용 원·부자재 규격/표준 개정 효율화 연구)

  • Park, KC;Baek, HM;Kim, TW;Gil, HJ;Kwon, JS;Lee, IL;Song, SB;Won, SH
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.3
    • /
    • pp.497-508
    • /
    • 2018
  • Purpose: The purpose of this study is to research the revision efficiency of the referenced specifications/standards for raw and subsidiary materials in the field of national defense. Methods: Firstly, it was carried out to investigate the all of the Korean military drawings and establish the database for specifications/standards referenced in the field of national defense. Secondly, it was reviewed the validity of referenced specifications/standards of raw and subsidiary materials. Finally, proposal documents were made for invalid referenced specifications/standards of raw and subsidiary materials in order to suggest alternative specifications/standards. Results: All of the specifications/standards referenced in the Korean military drawings were 11,924 kinds and raw and subsidiary specifications/standards were 2,711 kinds. The proposal documents for revision of invalid referenced specifications/standards were suggested and approved by the military procurement standardization committee of DAPA (Defense Acquisition Program Administration). Therefore, the revision process of 472 kinds of referenced specifications/standards and 160,177 papers of the Korean military drawings were finished. Conclusion: Based on the results of this investigation, it could be significantly reduce to administrative costs and efforts through revision of referenced specifications/standards instead of conventional engineering change.

A Study on the Escape Measures and Fire Protection System Improvement in Discount Stores (대형할인점의 피난대책 및 소방시설 개선방안에 관한 연구)

  • 홍성우;이영재
    • Fire Science and Engineering
    • /
    • v.16 no.4
    • /
    • pp.20-27
    • /
    • 2002
  • This study in focused on proposing the improvement plans for refuge and fire-fighting facilities in large shopping malls that are radically spreading. The main subjects are as follows. - The refuge measure for large shopping malls - Problems of installing the refuge facilities in stores and the solutions - Problems of installing the incendiary facilities in stores and the solutions - Problems of installing the indoor fire plug in stores and the solutions As result of the study, it has turned out that escape stairs which are set up according to the standard of size in the process of design plan, have to be decided for their amount, position, specification, etc, in consideration of the number of residents. It is also required to tighten a standard of installing a sprinkler instead of lightening the fire-fighting section in stores, considering obstacles due to facilities installed and procurement of the escape path. In addition, it needs to lighten a standard of installing the indoor fire plug, which is voluntarily set up at the store section incase of installing a sprinkler to make a practical fire-fighting facility available.