• Title/Summary/Keyword: Process management

Search Result 16,489, Processing Time 0.042 seconds

The LIS with the Kernel of the Process Management

  • Yong, He;Zhong, Chen
    • Journal of Korea Spatial Information System Society
    • /
    • v.11 no.2
    • /
    • pp.34-38
    • /
    • 2009
  • Based on the design of the LIS of GuangZhou and BeiJing, this paper discusses the resolution of the LIS with the kernel of process management. It applies the idea of workflow in the management supporting stratum, applies the process-oriented mechanism in the definition, coordination, supervision and control of the management process. The scheme has the character of information-media-oriented, work process dynamic changing supported, application system extended and restructure supported and is independent of the running environment of specific work.. Due to the previous character, the LIS is flexible, useable, elastic and able to support the dynamic application.

  • PDF

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

BPM-based Six Sigma : Concepts and Procedural Model (BPM 기반의 6 시그마 : 개념 및 절차 모델)

  • Kim, Kwang-Jae;Yook, Jin-Bum;Kim, Kwang-Soo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.4
    • /
    • pp.314-322
    • /
    • 2006
  • Despite its brilliant success, Six Sigma has suffered from two shortcomings, namely, the lack of a systematic method to identify the right projects in the "Define" stage and to sustain the improvement in the "Control" stage. The integration of Six Sigma and Business Process Management(BPM) seems to be a promising way to overcome the shortcomings of Six Sigma. This paper first reviews the existing efforts on this issue, and then proposes a framework for an effective integration of Six Sigma and BPM. The framework consists of five phases - DEFINE, EXECUTE, MONITOR, ANALYZE, and IMPROVE(DEMAI). A detailed description on the procedural model is also presented.

A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management (프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례)

  • Jung, Ha-Sung;Lee, Dong-Wha;Lee, Min-Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.3
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

A Study on the Analysis of IT Service Core Process using the AHP -In the Perspective of ITIL- (AHP기법을 이용한 IT서비스 핵심 프로세스 분석에 관한 연구 -ITIL 관점에서-)

  • Lee, Hwi-Jae;Kim, Dae-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.10a
    • /
    • pp.207-212
    • /
    • 2005
  • The SM(System Management) is more important than SI(System Integration) in business model of software industry. And the role of ITO(IT Outsourcing) is increasing, recently. Also, The interest of ITIL increasing in the software industry. In the perspective of business, IT organization has been transformed from supportive division the core business organization, IT organization needs the satisfaction of customer’s requirements. So, process oriented IT management is required. In the perspective of technique, according to need of IT infra for a rapid change management, an application management, systematic development and operating process are required. Therefore, this paper analyzes of IT service core process in service support and service delivery that was offered by ITIL using the AHP methodology This paper shows the results of IT service survey in domestic software industry. And this paper gives a guideline of introduction ITIL

  • PDF

Analysis of Production Process Improvement with Life Cycle Assessment $Technology{\sim}$ Example of HDPE Pipe Manufacturing

  • Tien, Shiaw-Wen;Chiu, Chung-Ching;Chung, Yi-Chan;Tsai, Chih-Hung;Chang, Chin-Fa
    • International Journal of Quality Innovation
    • /
    • v.8 no.2
    • /
    • pp.32-56
    • /
    • 2007
  • Life Cycle Assessment (LCA) aims to analyze possible impact upon manufacturing process and availability of products, and also study the environmental considerations and potential influence during entire life cycle ranging from procurement, production and utilization to treatment (namely, from cradle to tomb). Based on high-density polyethylene (HDPE) pipe manufacturing of company A, this case study would involve evaluation of environmental influence during the production process. When the manufacturing process has been improved during "production process" and "forming cooling" stage, it is found that capital input on "electric power" and "water supply" could be reduced, thus helping to sharpen the competitive power of company A, and also ensure sustainable economic and industrial development in accordance with national policies on environmental protection.

Building Facilities Management Using the Condition Prediction Process: A Case Study of Fiberglass Doors

  • Amani, Nima
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.47-52
    • /
    • 2014
  • In the last decades, Facility Management (FM) has established itself as a key building service factor.FM includes supporting services and organizing functions essential for maintaining, operating and managing physical component and material. The purpose of the paper is to develop an economical analysis for building facilities management during its service life based on limited cost. This method helps to facilities managers and engineers to make better decisions for reducing of facilities assessment costs and increasing the facilities' service life. This paper presents the preliminary development of a model involves three stages process namely data collection, economic computation and economic process optimization. This process was tested for fiberglass doors example in a building interior and exterior system. If executives can manage essential points effectively and make decisions according to a key performance index, cost can be optimized and safety can be enhanced for installation building.

Development of a Process Monitoring System for Real-Time Process Control (실시간 공정관리를 위한 공정모니터링 시스템 개발)

  • Lee, Jung-Hwan;Lee, Seung-Hoon;Oh, Hyun-Ok
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.1
    • /
    • pp.92-100
    • /
    • 2008
  • This paper develops a process monitoring system for real-time process control. The practical case is studied on a small and medium marine equipment company. For business process reengineering of the company, we adopt an approach based on information engineering methodology, which consists of four stages : planning, analysis, design, and implementation. The system is developed for Client/Server environment. We discuss the constructing of hardware system for real-time process control at low cost. The developed system is composed of interrelated modules for item master and BOM management, process control, facility management, SQC and work report.

The Model Development of 6 Sigma and Understanding of Process Quality in the Service Industry : Using the Structural Equation Modeling (서비스 조직에서의 프로세스품질에 대한 이해와 6시그마 모형개발 : 구조방정식 모형분석 이용)

  • Kim, Gye-Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.35 no.2
    • /
    • pp.84-98
    • /
    • 2007
  • Six Sigma advocates rigorous application of quality management tool. Using Six Sigma program provides a mechanism for service organization to achieve organization's goal and customer satisfaction. A model on Six sigma in service organization was developed and applied for the service organization. Questionnaire was developed, and data was collected and analyzed for this study. Conclusively, 6 sigma leadership is the important drivers to process management and customer relationship management. Process management and customer relationship management are significantly related to the job performance and customer satisfaction.

EFFECTS OF ADOPTING KMS BASED BUSINESS PROCESS MANAGMENT IN DESIGN COMPANIES IN KOREA

  • Jin-Won Hwang;Hyung-Won Choi;Doo-Won Hwang;Young-Woong Song;Hyong-Chul Lim;Yoonki Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1030-1035
    • /
    • 2009
  • The value of intangible assets of a company attracts attention in enterprise management environment drastically changing. Following such a trend, many companies have adopted knowledge management. Especially in construction industry of which success of a project is easily affected by the capacity of various participants and work performers, we may find many cases to which the knowledge managements have been adopted. However, the domestic design companies have tended to be late to introduce the knowledge management or have difficulty in effective use of KMS already constructed. This study suggests KMS based on BPM (Business Process Management) and drives its effects to improve problems mentioned above. We drives the expected effects by studying the existing studies and surveying domestic design companies and suggests Prototype for introducing a real system.

  • PDF