• Title/Summary/Keyword: Process Management Systems

Search Result 3,835, Processing Time 0.03 seconds

Technical Management Processes for Large National R&D Projects : Focused on Pyro Project (대형 국가 R&D 프로젝트의 기술관리 프로세스 : 파이로 프로젝트를 중심으로)

  • Kim, Jeong-Guk;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.34-41
    • /
    • 2017
  • The Pyro project, one of the large national R&D project to construct Korea Advanced Pyroprocessing Facility (KAPF), which has many goals such as development of pyro technology and process equipment, design of equipment and facility, construction, and test operation, is now under research and development. To reduce uncertainty and risk of such complex project, the technical management processes in systems engineering standards and NASA handbook were reviewed, and then the ten common technical management processes were selected for the large national R&D project to meet its goal successfully. And the essential technical management processes were finally suggested for Pyro project in consideration of current situation of the project.

A Study on the Test and Evaluation Process Development for Korea Next Generation Highspeed Electric Multiple Unit (차세대 고속열차 시험평가 프로세스에 관한 연구)

  • Lee, Tae-Hyung;Kim, Sang-Soo;Kim, Seog-Won;Kim, Ki-Hwan;Chung, Heung-Chai
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.7-11
    • /
    • 2011
  • A high-speed railway system represents a typical example of large-scale multi-disciplinary system, consisting of subsystems such as rolling-stock, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Systems engineering technology development project for Korea next generation High-speed Electric Multiple Unit (HEMU) system in progress is a national large system development project that is not only a large-size and complex but also multi-disciplinary in nature. Therefore, all stakeholders must understand and share the functional and performance requirements of HEMU throughout its life-cycle phases. Also in the test and evaluation phase, all systems requirements must be verified. In 2011, the prototype train manufacturing will be completed. It will do test run on the commercial line and all systems requirements are verified until 2012. For the system verification, the test and evaluation process have to be established before the test trial run. Using a systems engineering tool, the system design database(SDD) with requirements traceability and development process management in the course of the development have to be established. This paper represents the test and evaluation process development based on the SEMP(Systems Engineering Management Plan) developed in the design stage. The test and evaluation process is refined and updated in comparison to the design stage one. The test and evaluation process consists of procedure, test and evaluation method and schedule. So through this process, it is defined that each systems requirements is verified on which test and about what time.

The Factors Affecting the Performance of Knowledge Management Systems (지식관리시스템 성과에 영향을 미치는 요인)

  • Suh, Chang-Kyo;Shin, Sung-Ho
    • Asia pacific journal of information systems
    • /
    • v.15 no.1
    • /
    • pp.1-24
    • /
    • 2005
  • The purpose of this study is to identify the factors affecting the performance of knowledge management systems. To extend DeLone & MeLean's model, we included the user specialization in the information systems success model. The questionnaires are collected from 109 knowledge management system users. The major findings are summarized as followed. First, system characteristics such as ease of use, response time, and knowledge management process support affect the knowledge management systems usage. Second, knowledge characteristics such as relevancy, completeness, reliability, importance, and currency also affect the knowledge management systems usage. Third, the end-users are satisfied with the knowledge management systems because it is easy to use and relevant.

Estimation of Process Parameters Using QFD and Neural Networks in Injection Molding (품질기능전개와 신경망 회로를 이용한 사출성형 공정변수의 예측)

  • Koh, Bum-Wok;Kim, Jong-Seong;Choi, Hoo-Gon
    • IE interfaces
    • /
    • v.21 no.2
    • /
    • pp.221-228
    • /
    • 2008
  • The injection molding process is able to produce high precision manufactures as a single process with fast speed. However, the prices of both the mold and the molding machine are expensive, and the single process is very complex and difficult to compose of the exact relationship between the process setting conditions and the product quality. Therefore, the quality of a molded product often depends on a skillful engineer's operations in the design of both parts and molds. In this paper, the relationship between the process conditions and the defectiveness is built for better manufactures under settings of the appropriate parameters, and so it can reduce the setup time in the injection molding process. Quality Function Deployment (QFD) provides severe defectiveness factors along with the related process parameters. Also, neural networks estimate the relationship between defective factors and process setting parameters, and lead to reduce the defectiveness of molded parts.

The Application of Project control Techniques to Process Control: The Effect of Temporal Information on Human Monitoring Tasks

  • Parush, A.;Shtub, A.;Shavit, D.
    • Transactions on Control, Automation and Systems Engineering
    • /
    • v.3 no.1
    • /
    • pp.10-14
    • /
    • 2001
  • We studied the use of time-related information, with and without prediction, to support human operators performing moni-toring and control tasks in the process. Based on monitoring and control techniques used for Project Management we developed a display design for the process industries. A simulated power plant was used to test the hypothesis that availability of predictions along with information on past trends can improve the performances of the human operator handling faults. Several designs of dis-plays were tested in the experiment in which human operators had to detect and handle two types of faults(local and systems wide) in the simulated electricity generation process. Analysis of the results revealed that temporal data, with and without prediction, signifi-cantly reduced response time. Our results encourage the integration of temporal information and prediction in displays used for the control processes to enhance the capabilities of the human operators. Based on the analysis we proposed some guidelines for the de-signer of the human interface of a process control system.

  • PDF

Multiple Perspectives on Knowledge Management : Social Network, Resource Dependency, and Institutionalization Theories (지식경영에 대한 제 접근 : 사회적 네트워크, 자원의존 및 제도화 이론을 중심으로)

  • Moon, Gyewan;Kim, Kiwhan;Choi, Sukbong
    • Knowledge Management Research
    • /
    • v.10 no.4
    • /
    • pp.43-60
    • /
    • 2009
  • The current study attempts to provide the field of knowledge management with theoretical grounds from the perspective of social network, resource dependency, and institutional theory. Social network theory considers that knowledge management plays a critical role in organizational innovation through the process of knowledge sharing/creation, communication systems, and a cooperative culture and trust, whereas resource dependency perceives knowledge management as contributing to cost reduction through the process of knowledge capture/storage, database systems, and reward/incentive systems. Plus, from the perspective of institutionalization, this study discusses that organizations can not benefit from knowledge management if it is adopted with the motive of isomorphic change. Finally, this study compares and integrates the three perspectives, and discusses the implications and limitations.

  • PDF

An Empirical Study on the Leadership for Successful Knowledge Management Systems Development (성공적인 지식관련시스템 구축을 위한 리더십에 관한 연구)

  • Lee, Byung-Ku;Lee, Kyung-Hwan;Kim, Jong-Weon
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.11 no.5
    • /
    • pp.86-97
    • /
    • 2006
  • Many organizations are operating knowledge management(KM) for their competitive advantage in dynamically changeable markets. To support KM successfully, they are considerably investing in knowledge management systems(KMS) development. By using KMS, organizations can lead to the improvement of their employees' knowledge level and the removal of inefficient tasks, consequently resulting in their competitive edge. On the basis of the power process perspective, this study investigates the CEO leadership and its organization's performance for successful development of KMS.

  • PDF

Software Architecture Analysis for Risk Management

  • Kang, Byeong-Do;Lee, Roger Y.
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.14 no.5
    • /
    • pp.83-89
    • /
    • 2009
  • Management of risks is critical issue in the project management and it is important to ensure that risk management is done in a sensible way. Risk analysis is an activity geared towards risk mitigation in risk management technique. Many techniques to manage, analyze and reduce risks have been done previously but only few have addressed the design analysis to reduce risk and none have attempted to analyze architecture to manage risks. In this paper we try to find a solution through various analyzing various software architectural design concepts. We follow Pressman's method of analyzing architecture design, and then alter it to identify risks which are used in risk analysis process further in risk management process. The risks assessed are analyzed later in the risk management cycle.

Process Management Systems for Integrated Real-Time Shop Operations in Heterogeneous Multi-Cell Based Flexible Manufacturing Environment (이기종 멀티 셀 유연생산환경에서의 실시간 통합운용을 위한 공정관리 체계)

  • Yoon, Joo-Sung;Nam, Sung-Ho;Baek, Jae-Yong;Kwon, Ki-Eok;Lee, Dong-Ho;Lee, Seok-Woo
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.22 no.2
    • /
    • pp.281-286
    • /
    • 2013
  • As the product lifecycle is getting shorter and various models should be released to respond to the needs of customers and markets, automation-based flexible production line has been recognized as the core competitiveness. According to these trends, system vendors supply cell-level systems such as FMC(Flexible Manufacturing Cell) that is integration of core functions of FMS(Flexible Manufacturing System) and RMC(Reconfigurable Manufacturing Cell) that can easily extend components of FMC. In the cell-based environment, flexible management for shop floor composed of existing job shop, FMCs and RMCs from various system vendors has emerged as an important issue. However, there could be some problems on integrated operation between heterogeneous cells to use vendor-specific cell controllers and on seamless information flow with high level systems such as ERP(Enterprise Resource Planning). In this context, this paper proposes process management systems supporting integrated shop operation of heterogeneous multi-cell based flexible manufacturing environment: First of all, (1) Integrated Shop Operation System to apply the process management system is introduced, and (2) Multi-Layer BOP(Bill-Of-Process) model, a backbone of the process management system, is derived with its data structure. Finally, application of the proposed model is illustrated through system implementation results.

Development of Educational Program for Production Managers Based on a Symbiotic Competition with ABC-G Network

  • Ishihara, Masahiko;Nakano, Makoto;Ishii, Kazuyoshi
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.3
    • /
    • pp.258-266
    • /
    • 2014
  • This paper proposes a management system for the educational program of production managers on the basis of value co-creation by the learner and the instructor. The program combines an intelligent knowledge-based approach with the kaizen activity program. The program helps individuals acquire knowledge and skills to ensure the total rather than the partial optimization of processes and operations facilitating continuous improvement in the workplace. To achieve these goals, the program uses models of a learning process and a swing of enlightenment. In addition, the program is supported by a framework of academic, business people, consultants, and government officers. The program was developed using an instructional design approach. This paper discusses the process of developing and managing the educational program between 2006 and 2012 as well as the results obtained.