• Title/Summary/Keyword: Process Costs

Search Result 1,874, Processing Time 0.03 seconds

THE TREND OF CONSTRUCTION COST INDICES AND THEIR APPLICATIONS

  • Yoo-Sub Lee;Seung-Hyun Lee;Tai-Kyung Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.908-912
    • /
    • 2005
  • Construction Cost Indices are values for measuring fluctuations in direct construction costs which include material costs, labor costs, and equipment costs for construction operations. In Korea, Korea Institute of Construction Technology (KICT) has been assessing and announcing these indices since January, 2004. The main goals of this paper are to look over the calculation process for those indices and then present the trend in construction costs according to the types of facilities with the past construction cost index data. Also, this paper traces the origin of the occurrence of significant changes on those indices through the further analysis of the trend. In addition, this paper shows the practicality of the indices and the way how to put them to practical use. An alternative estimate method using the indices is suggested for compensating the changes of construction costs caused by price fluctuations.

  • PDF

An Empirical Analysis of Costs related to Nursing Practice (간호 관련 비용의 실증적 사례분석 연구)

  • Ko, Yu Kyung;Park, Bo-Hyun
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.23 no.2
    • /
    • pp.139-150
    • /
    • 2017
  • Purpose: The purpose of this study was to identify nursing service costs associated with all health care costs incurred by the institution. Methods: This study was an empirical case study research in which the nursing cost was separated from total medical cost. The nursing cost index was calculated through a cost allocation method after summarizing costs for personnel, raw materials and administration of each department in one public hospital. The 2014 budget plan, published in 'Public Hospitals Alert', was used as data and the data were analyzed using the Microsoft Office EXCEL 2013 program. Results: When comparing total medical costs and nursing costs, the nursing cost were 27.14% of the total medical cost. The nursing cost per nurse per hour was calculated as \29,128 The nursing cost per inpatient per day was calculated as \157,970, and the administration cost per patient was calculated as \133,710. Conclusion: The results of the research present the process of cost allocation of specific cost elements in the hospital and evidence for administrative costs which in the past have been only vaguely formulated. These are the significant implications of this study.

Optimal Inspection Period for the System Subject to Random Shocks

  • Kim, Sung-Soon;Choi, Seung-Kyoung;Lee, Eui-Yong
    • Journal of the Korean Data and Information Science Society
    • /
    • v.16 no.4
    • /
    • pp.725-733
    • /
    • 2005
  • A system subject to random shocks is considered. The shocks arrive according to a Poisson process and the amount of each shock is exponentially distributed. In this paper, a periodic inspection policy for the system is compared with a random inspection policy. After assigning several maintenance costs to the system, we calculate and compare the long-run average costs per unit time under two policies.

  • PDF

Can Non-Fuel Costs be Considered as Variable Costs in Generation Market? (연료비 이외의 항목도 발전시장의 변동비로 간주할 수 있는가?)

  • Cho, Sung Bong
    • Environmental and Resource Economics Review
    • /
    • v.20 no.3
    • /
    • pp.567-593
    • /
    • 2011
  • In 2005, five Korean generation companies suggested to include non-fuel ancillary costs incurring in the process of managing fuels and ashes as variable costs in Korean Cost-Based Pool. OLS analysis seeking statistical relation with the amount of generation did not provide sufficient ground for such argument. However, some cost items in this category showed meaningful statistical relation for certain generation facilities hinting some possibilities for the candidate of variable costs in the future. Time lag related to cost evaluation, problems related to inventory control and accounting method related to this may block the statistical relationship with the amount of generation. Unified criteria and standardization of the data are necessary before we proceed further to consider them as variable costs.

  • PDF

Cost Analysis of Small Capacity Farm-house Rice Whitener (자가정미기(自家精米機)의 이용비용(利用費用) 분석(分析))

  • Park, P.K.;Yoon, H.S.;Park, K.K.
    • Journal of Biosystems Engineering
    • /
    • v.14 no.1
    • /
    • pp.41-48
    • /
    • 1989
  • In order to provide a basic information for the government policy in the future, rice milling costs of Small Capacity Farm-house Rice Whiteners (SCFRW) were estimated by surveying and analyzing the major factors to affect their costs. Two types of SCFRW having one stage and two stage milling process and two rice varieties, Tong-il and Akibare, were considered for their cost estimation, respectively. Also, their costs were compared with those of Private Custom-work Mill in order to determine its economical feasibility. The results were concluded as follows; 1. Major factors to affect the costs were annual milling quantity, purchase price of SCFRW and grain milling loss. 2. Total milling costs of SCFRW were a function of annual milling quantity. These costs decreased rapidly as annual milling quantity increased. 3. In comparison of milling costs between single pass type and double pass type SCFRW, the former was more economical than the latter. 4. Also, in comparison of milling costs between two varieties by using SCFRW, Akibare was less expensive than Tong-il. 5. In comparison with private Custom-work Mill, both single pass and double pass type SCFRW were less economical than private Custom-work Mill. 6. In order to have an economical feasibility, SCFRW should be designed and developed to reduce its milling loss and purchase price.

  • PDF

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

Power Interruption Costs to Commercial Customers of Electricity in Korea

  • Kim, Dong-Sub;Kim, Kil-Sin
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.5
    • /
    • pp.1495-1500
    • /
    • 2014
  • This paper presents the result of the estimation of the power interruption costs of Korean commercial customers. Commercial customers are usually located in urban areas and considered very important because a power interruption on them can expand to additional damage to related users. Their power interruption costs were calculated through a survey with the process of data selection. Also, the power interruption cost for each customer's business type was calculated and compared with that of foreign cases.

BIM-based Repair&Replacement (R&R) Cost Estimating Process (BIM기반 건축물 수선교체비 산정 프로세스)

  • Park, Jieun;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.31-38
    • /
    • 2016
  • In a construction project, the portion for maintenance costs for a building is considerable compared to the initial construction cost. As such, Life Cycle Cost (LCC) analysis is being increasingly utilized to assess the design value of engineering work in Korea. Additionally, the Public Procurement Service in Korea announced that it will be mandatory for all domestic construction projects to adopt BIM. Furthermore, the paradigm for architectural design has shifted from 2D to 3D, and to BIM, which includes a data management system. Within this background, however, there is currently no adequate BIM-based LCC analysis software and the requirements of cost estimation for repair and replacement cost for a building is not completely adequate in BIM tools such as Revit and Archicad. Therefore, this study suggests a process of cost estimation for repair and replacement (R&R) cost based on IFC data. First, we analyzed existing R&R criteria and defined BIM-based requirements when calculating R&R costs. These requirements were extracted from relevant IFC data. Subsequently, this was saved to a database and a BIM-based database was built for R&R cost estimation. Finally, this database was connected with external databases such as R&R Criteria DB and Cost Information DB to calculate R&R costs. This process is expected to improve upon the traditional process of cost estimation of R&R cost by applying a BIM model. The proposed process can contribute to a further standardizing of BIM-based LCC analysis thru application to initial construction costs, energy costs, and other maintenance costs.

A Case Study of Six Sigma Project for Reducing the Project Costs through Project Risk Management (프로젝트 위험관리강화를 통한 원가개선의 6시그마 사례)

  • Jung, Ha-Sung;Lee, Dong-Wha;Lee, Min-Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.3
    • /
    • pp.135-148
    • /
    • 2005
  • This paper considers a six sigma project for reducing the project costs through project risk management. The project follows a disciplined process of five phases: define, measure, analyze, improve, and control. A risk management process map is used to identify process input and output variables. Seven key process input variables are selected by using C&E diagram and X-Y matrix and finally four vital few input variables are selected by the related statistical analysis. The optimum alternatives of the vital few input variables are obtained by the method of PUGH matrix. The process is running on control plan and we obtained substantial project cost reductions in early stage of the control phase.

Optimum Life Cycle Cost Design of High-Speed Railway Steel Bridges (고속철도 강교량의 총기대비용 최적설계)

  • 조효남;민대홍;조준석
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2000.10a
    • /
    • pp.109-114
    • /
    • 2000
  • In this paper, an optimum design model for minimizing the life-cycle cost (LCC) of high-speed railway steel bridges is proposed The point is that it takes into account service life process as a whole, and thus the life-cycle costs include initial (design, testing, and construction) costs, maintenance costs, expected strength failure costs and expected serviceability failure costs. The problem is formulated as that of minimization of expected total life-cycle cost with respect to the design variables. By processing the optimum LCC design the effective and rational basis is proposed for calculating the total LCC and the sensitivity analysis of LCC is peformed. Based on a numerical example, it may be positively stated that the optimum LCC design of high-speed railway steel bridges proposed in this study provides a lot more rational and economical design, and thus the proposed approach will expedite the development of new concepts and design methodologies that may have important implications in the next generation performance-based design codes and standards.

  • PDF