• 제목/요약/키워드: Process Assessment model

검색결과 960건 처리시간 0.027초

Development on the model of outcome-based course evaluation design for Course-Embedded Assessment (교과기반평가를 위한 성과중심 교과목 평가설계모형 개발)

  • Kim, Hyekyung
    • Journal of Engineering Education Research
    • /
    • 제18권6호
    • /
    • pp.24-31
    • /
    • 2015
  • The purpose of this study is to develop the model of course evaluation design for CEA(Course-Embedded Assessment), which is focused on course level for assessment reliability. This study was conducted by the process of model development and validation according to Richey & Klein(2007)'s model development methodology. The model of this study was comprised with the three steps of learning objectives based on course outcome, assessment design and goal achievement analysis of course, which were explained by specific design principles. Also, this model was validated by two steps, which one was on the inner validation and the other was the outer validation(Richey & Klein, 2007). Considerations for designing the model of course evaluation have been suggested and a few implications were discussed.

Risk assessment of karst collapse using an integrated fuzzy analytic hierarchy process and grey relational analysis model

  • Ding, Hanghang;Wu, Qiang;Zhao, Dekang;Mu, Wenping;Yu, Shuai
    • Geomechanics and Engineering
    • /
    • 제18권5호
    • /
    • pp.515-525
    • /
    • 2019
  • A karst collapse, as a natural hazard, is totally different to a normal collapse. In recent years, karst collapses have caused substantial economic losses and even threatened human safety. A risk assessment model for karst collapse was developed based on the fuzzy analytic hierarchy process (FAHP) and grey relational analysis (GRA), which is a simple and effective mathematical algorithm. An evaluation index played an important role in the process of completing the risk assessment model. In this study, the proposed model was applied to Jiaobai village in southwest China. First, the main controlling factors were summarized as an evaluation index of the model based on an investigation and statistical analysis of the natural formation law of karst collapse. Second, the FAHP was used to determine the relative weights and GRA was used to calculate the grey relational coefficient among the indices. Finally, the relational sequence of evaluation objects was established by calculating the grey weighted relational degree. According to the maximum relational rule, the greater the relational degree the better the relational degree with the hierarchy set. The results showed that the model accurately simulated the field condition. It is also demonstrated the contribution of various control factors to the process of karst collapse and the degree of collapse in the study area.

A modularized numerical framework for the process-based total system performance assessment of geological disposal systems

  • Kim, Jung-Woo;Jang, Hong;Lee, Dong Hyuk;Cho, Hyun Ho;Lee, Jaewon;Kim, Minjeong;Ju, Heejae
    • Nuclear Engineering and Technology
    • /
    • 제54권8호
    • /
    • pp.2828-2839
    • /
    • 2022
  • This study developed a safety assessment tool for geological disposal systems called APro, a systemically integrated modeling system based on modularizing and coupling the processes which need to be considered in a geological disposal system. Thermal, hydraulic, chemical, canister failure, radionuclide release and transport processes were considered in the current version of APro. Each of the unit processes in APro consists of a single Default Module, and several Alternative Modules which can increase the flexibility of the model. As an initial stage of developing the modularization concept and modeling interface, the Default Modules of each unit process were described, with one Alternative Module of chemical process. The computation part of APro is mainly a MATLAB workspace controlling COMSOL and PHREEQC, which are coupled by an operator splitting scheme. The APro model domain is a stylized geological disposal system employing the Swedish disposal concept (KBS-3 type), but the repository layout can be freely adjusted. In order to show the applicability of APro to the total system performance assessment of geological disposal system, some sample simulations were conducted. From the results, it was confirmed that coupling of the thermal and hydraulic processes and coupling of the canister failure and the radionuclide release processes were well reflected in APro. In addition, the technical connectivity between COMSOL and PHREEQC was also confirmed.

The Measurement Model for the Evaluation of Information Systems Service : The Case of Chinese SI Company (정보시스템 서비스 평가를 위한 측정모형의 개발 및 실증적 검증 : 중국 SI 기업 사례)

  • Lee, Sang-Jae;Lim, Gyoo-Gun
    • Journal of Information Technology Services
    • /
    • 제10권2호
    • /
    • pp.141-162
    • /
    • 2011
  • The controls of Information Systems (IS) have been an more critical issue controls as the sophistication and integration of IS is more proceeded. ITGI (The Information Technology Governance Institute) of ISACA (Information Systems Audit and Control Association) has suggested COBIT (Control Objectives for Information and related Technology) and this has been widely recognized the evaluation model of IS controls. In COBIT, IS was evaluated in terms of process, information quality, and IT resources. This study used COBIT in order to suggest and empirically test an evaluation model of IS service. The data was collated from one major Chinese SI (Systems Integration) company in four domains of processes : planning and organization, acquisition and implementation, delivery and support, and monitoring. Seven factors are extracted using an exploratory factor analysis as follows : Overall IT planning process, technological assessment process in IT planning of IT, cost-benefit assessment process in IT planning, implementation process, support process, monitoring process, post-implementation evaluation process. The results of confirmatory analysis of three alternative measurement models indicated that the measurement model with one inherent or conceptual variable has greater model fitness than the other models. This study suggests the logical and general way to test and apply COBIT in evaluating IS services.

Network Security Situation Assessment Method Based on Markov Game Model

  • Li, Xi;Lu, Yu;Liu, Sen;Nie, Wei
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제12권5호
    • /
    • pp.2414-2428
    • /
    • 2018
  • In order to solve the problem that the current network security situation assessment methods just focus on the attack behaviors, this paper proposes a kind of network security situation assessment method based on Markov Decision Process and Game theory. The method takes the Markov Game model as the core, and uses the 4 levels data fusion to realize the evaluation of the network security situation. In this process, the Nash equilibrium point of the game is used to determine the impact on the network security. Experiments show that the results of this method are basically consistent with the expert evaluation data. As the method takes full account of the interaction between the attackers and defenders, it is closer to reality, and can accurately assess network security situation.

Development of Intelligence Electric Power Quality Assessment Model (지능형 전기품질 평가모델 개발)

  • Lee, Buhm;Choi, Nam-Sup;Kim, Kyung-Min
    • Journal of Institute of Control, Robotics and Systems
    • /
    • 제13권6호
    • /
    • pp.531-536
    • /
    • 2007
  • This paper presents a power quality assessment model based on the Analytic hierarchy process. This model can assess unified power quality index which provide an overall performance of the distribution system. To obtain the unified power quality index, we propose the use of the AHP model which has three states: [Ideal]-[Actual]-[Worst]. The proposed method is especially useful and effective for planning. We have applied the proposed method to an actual relatively large system, and verified the usefulness.

Development of a Process Capability Assessment Method for Process-based Industries (공정기반 산업의 프로세스 인프라 역량 평가 방법 제안 및 적용)

  • Kang, Young-Mo;Im, Byeong-Hyeok;Yoon, Byun-Gun;Lee, Sung-Joo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • 제35권1호
    • /
    • pp.16-23
    • /
    • 2012
  • Recently, as organizational systems have become larger and more complicated, the evaluation for their efficiency and effectiveness has become more difficult but important. It is essential to understand the current strength and weakness of the organizational process. It can be a starting point for improving the efficiency and effectiveness of the organizational systems, because the quality of system outputs depend greatly on the capability of system process. Particularly in such process-based industries as semiconductor, energy or software industries, an assessment of process capability is more highlighted to gain knowledge of the expected quality and reliability of system outputs. As a result, much attention has been given to the issues of process capability assessment in the process-based industries. However, most of the previous research in those industries is based on case studies, a more generalized method for process capability assessment is in need for help more companies improve their processes. Therefore, this study aims to propose a process capability assessment method and apply the proposed method to an energy company. This research argues that the process capability is composed of individual and organizational capabilities of the process. Then, the concept of Capability Maturity Model Integration, which was initially suggested to evaluate the software development process, was introduced to develop the assessment tools and process. Finally, the proposed method was applied to a Korean company in the energy industry sector to verify its utility. The research outputs are expected to help more firms assess their process capability and ultimately improve the process.

Performance Assessment Model for Fire Safety Protection of Office Building (사무소 건축물의 화재안전 성능 평가모델)

  • Yang, Eun-Bum;Hwang, Young-Sam;Lee, Chan-Sik
    • Journal of the Korean Society of Safety
    • /
    • 제19권2호
    • /
    • pp.69-74
    • /
    • 2004
  • This study is to suggest a performance assessment model for fire safety protection of office building 34 asessment elements were chosen by interviewing with experts, reviewing several codes and existing relevant models, assessment elements included in this model are comprised of five categories which are 'performace of protected area', 'performance of fire partition', 'safety performance of fire escape', 'performace of smoke control system' and 'performace of fire fighting equipment'. The weight of each element was computed by systematic approach like an AHP (analytical hierarchy process), which was conducted by experts who work in the field of fire protection. This model would be utilized as a part of assessment model for the overall performace of domestic office building.

Comprehensive Assessment on Risk Factors using Fuzzy Inference in Decommissioning Process (퍼지추론을 이용한 해체공정 중 리스크 요인의 통합 평가)

  • Lim, Hyeon Kyo;Kim, Hyunjung
    • Journal of the Korean Society of Safety
    • /
    • 제29권4호
    • /
    • pp.184-190
    • /
    • 2014
  • Decommissioning process of nuclear facilities consist of a sequence of problem solving activities, because there may exist not only working environments contaminated by radiological exposure but also industrial hazards such as fire, explosions, toxic materials, and electrical and physical hazards. Therefore, not a few countries in the world have been trying to develop appropriate counter techniques in order to guarantee safety and efficiency of the process. In spite of that, there still exists neither domestic nor international standard. Unfortunately, however, there are few workers who experienced decommissioning operations a lot in the past. As a solution, it is quite necessary to utilize experts' opinions for risk assessment in decommissioning process. As for an individual hazard factor, risk assessment techniques are getting known to industrial workers with advance of safety technology, but the way how to integrate those results is not yet. This paper aimed to find out an appropriate technique to integrate individual risk assessment results from the viewpoint of experts. Thus, on one hand the whole risk assessment activity for decommissioning operations was modeled as a sequence of individual risk assessment steps which can be classified into two activities, decontamination and dismantling, and on the other, a risk assessment structure was introduced. The whole model was inferred with Fuzzy theory and techniques, and a numerical example was appended for comprehension.

Concept Selection of NPP Construction Delay Risk Assessment Methodology Using Systems Engineering Approach

  • Hossen, Muhammed Mufazzal;Kang, Sunkoo;Jung, JC;Kim, Jonghyun
    • Journal of the Korean Society of Systems Engineering
    • /
    • 제11권1호
    • /
    • pp.9-24
    • /
    • 2015
  • Construction industry faces a lot of inherent uncertainties and issues and the construction phase of nuclear power project is not free from this risk. This paper investigates promising methodologies to be used on nuclear power plant (NPP) construction schedule delay risk assessment by using entry level systems engineering approach. This study contains how the initial concept for the risk assessment methodology has been developed. In this point of view, this work structured on three main phases: needs analysis (NA), concept exploration (CE), and concept definition (CD) through systems engineering (SE) approach. Traditionally, the SE process is applied to technical development programs but this study opens up a new avenue that SE can also be successfully applied to the development and optimization of the risk assessment model. This study provides a rational and systematic process for developing and selecting the best risk assessment model. This paper selects analytic hierarchy process (AHP) method to assess NPP construction schedule delay risk for international project. As conclusion, the proposed concept and selected method can discriminate successfully and clearly among schedule delay risk assessment methods.