• Title/Summary/Keyword: Problem structure

Search Result 5,523, Processing Time 0.039 seconds

An experimental study about the water leakage structure of waterproofing layer performance demobilization method using of stick expansion type complex of flexible material (점착$\cdot$팽창성 유연형 복합소재를 이용한 누수구조물의 방수층 성능복원공법에 관한 실험적 연구)

  • Jang Hyok-Soo;Kang Hyo-Jin;Song Je-Young;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.79-83
    • /
    • 2005
  • In the reinforced concrete structure, Even if speak that water leakage occurrence is no problem to material, there is a lot of reasons construction factor, material damage by behavior structure, properties of matter change by years and water leakage part by environment condition. so, waterproofing technological consideration should be gone ahead. In this research, we will study about stick performance, concrete surface adhesive, damage and blow. we will check all things and test it. The stick expansion type complex of flexible material passed on result of standard. It is conducive to concrete of durability by waterproofing layer performance demobilitation technology on the water leakage structure for solution of problem and repair

  • PDF

A Study on Governance Structure Improvement of Large Corporate in Our Country (우리나라 대기업의 지배구조 개선에 관한 연구)

  • 이재범
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.1
    • /
    • pp.143-162
    • /
    • 2003
  • The governance structure of corporate is very important to raise the nation's economic efficiency and the operation result of firm. However, the innovation of corporate governance structure is a important problem to improve international confidence in our country, since most large corporate in our country has a promodern governance structure to be influenced in decision making of corporate group by minority governance-shareholder. Therefore, in our country the improvement of corporate governance structure is very urgent. This study examine the improvement device of corporate governance structure to be introduced in our country, and present the improvement direction to be suitable to our country's economic circumstance.

Gender Differences Between the Relative Contributions of Variables to Problem Finding in Ill-structured and Moderately Structured Problem Situation (구조화 정도가 다른 문제 상황에서 문제발견에 대한 제 변인의 상대적 기여도에서의 남녀 차이)

  • Lee, Hye Joo
    • Korean Journal of Child Studies
    • /
    • v.28 no.1
    • /
    • pp.171-187
    • /
    • 2007
  • The 166 elementary school students of this study were divided into four groups by gender and degree of structure in problem situations. Written instruments ascertained intelligence, conceptual knowledge, science process skills, divergent thinking, intrinsic/extrinsic motivation, personality traits, and home environment. Results were that male students scored higher on problem finding in the ill-structured than in the moderately structured problem situation. In the ill-structured problem situation, personality traits, conceptual knowledge, and intrinsic motivation contributed to the scores of male students and home environment and conceptual knowledge contributed to the scores of female students. In the moderately structured problem situation, personality traits and intrinsic motivation contributed to the scores of all students, but science process skills contributed to the scores of female students only.

  • PDF

On a Substructure Synthesis Having Non-Matching Nodes (비부합 절점으로 이루어진 구조물의 합성과 재해석)

  • 정의일;박윤식
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.11a
    • /
    • pp.155-160
    • /
    • 2001
  • Actual engineering structure is frequently very complex, and parts of structure are designed independently by different engineers. Also each structure contains so many degree of freedom. For these reason, methods have been developed which permits the structure to be divided into components or substructures, with analysis being done on a small substructure in order to obtain a full structural system. In such case, because of different mesh size among finite element model (FEM) or different matching points among FEM models and experimentally obtained models, their interfacing points may be non-matching. Solving this non-matching problem is useful to other application such as structural dynamic modification or model updating. In this work, virtual node concept is introduced. Lagrange multipliers are used to enforce the interface compatibility constraint, and interface displacement is approximated by polynomial presentation. The governing equation of whole structure is derived using hybrid variational principle. The eigenvalue of whole structure are calculated using the determinant search method. The number of degree of freedom in the eigenvalue problem can be drastically reduced to just the number of interface degree of freedom. Some numerical simulation is performed to show usefulness of synthesis method.

  • PDF

Efficiency Review for the Evaluation Method and standard for High speed Railway Rail Fastening System (고속철도 레일 체결장치 성능 평가방법 및 기준검토)

  • Kim In-Jae;Kang Kee-Dong;Han Sang-Chul;Yang Shin-Choo
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.818-823
    • /
    • 2004
  • In case of the Korea Railroad, when we would decide the track structure, it has been introduced the whole track structure system based on only the foreign application cases and data offered by manufacturers without the process of the objective performance verification. The value of property for track materials, derived from the calculation of track structure, was hard to perform the objective performance evaluation among track structure systems because each manufacturer adopted the different test method and standard. To solve the above-mentioned problem, it should suggest the technical and objective evaluation method about the performance of track materials and meet with the standard of High Speed railroad and international railroad through the establishment and revision of performance standard. In the objective and technical respects, it will be a major role to decide the track structure. In this paper, I would like to summarize the case which was improved the problem of test method and standard exposed from the performance verification of Rail Fastening System among the track structure systems of High speed railroad.

  • PDF

An Learning Algorithm to find the Optimized Network Structure in an Incremental Model (점증적 모델에서 최적의 네트워크 구조를 구하기 위한 학습 알고리즘)

  • Lee Jong-Chan;Cho Sang-Yeop
    • Journal of Internet Computing and Services
    • /
    • v.4 no.5
    • /
    • pp.69-76
    • /
    • 2003
  • In this paper we show a new learning algorithm for pattern classification. This algorithm considered a scheme to find a solution to a problem of incremental learning algorithm when the structure becomes too complex by noise patterns included in learning data set. Our approach for this problem uses a pruning method which terminates the learning process with a predefined criterion. In this process, an iterative model with 3 layer feedforward structure is derived from the incremental model by an appropriate manipulations. Notice that this network structure is not full-connected between upper and lower layers. To verify the effectiveness of pruning method, this network is retrained by EBP. From this results, we can find out that the proposed algorithm is effective, as an aspect of a system performence and the node number included in network structure.

  • PDF

Technological Requirements in Z-level Machining (등고선가공에서의 기술적 요구사항 들)

  • Park, Sang-C.
    • Proceedings of the KSME Conference
    • /
    • 2001.06c
    • /
    • pp.128-133
    • /
    • 2001
  • For the Z-level machining, a tool-path linking procedure is presented. The linking problem is approached from the technological requirements, such as considering the machining constraints among the tool-path-elements, minimizing the tool-path length and reflecting the oneway/zigzag linking option. To simplify the linking problem, we develop a data structure, called a TPE-net, providing information on the machining constraints among the tool-path-elements. By making use of the TPE-net, the tool-path linking problem becomes a touring problem so that every node has been traversed.

  • PDF

Valid Inequalities and Facets for the Steiner Problem in a Directed Graph

  • Myung, Young-Soo
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.21 no.1
    • /
    • pp.131-146
    • /
    • 1996
  • In this paper, we describe the facial structure of the steiner problem in a directed graph by formulating it as set covering problem. We first characterize trivial facets and derive a necessary condition for nontrival facets. We also introduce a class of valid inequalities with 0-1 coefficients and show when such inequalities define facets.

  • PDF

New learning algorithm to solve the inverse optimization problems

  • Aoyama, Tomoo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2002.10a
    • /
    • pp.42.2-42
    • /
    • 2002
  • We discuss a neural network solver for the inverse optimization problem. The problem is that find functional relations between input and output data, which are include defects. Finding the relations, predictions of the defect parts are also required. The part of finding the defects in the input data is an inverse problem . We consider the meanings to solve the problem on the neural network system at first. Next, we consider the network structure of the system, the learning scheme of the network, and at last, examine the precision on the numerical calculations. In the paper, we proposed the high-precision learning method for plural three-layer neural network system that is series-connect...

  • PDF