• Title/Summary/Keyword: Private infrastructure investment

Search Result 113, Processing Time 0.024 seconds

A study on the Obstacle Reasons in the Process of BTL Projects in School Facilities (학교 BTL사업 추진 저해요인의 고찰)

  • Kim, Jin-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.204-205
    • /
    • 2013
  • The rational Management of the school facilities will be able to minimize the waste of budgets, enhance total values of facilities. The purpose of this study is to propose promotion plans of the private infrastructure investment in the school facilities not only for contemplating obstacle reasons of BTL projects, but also for gripping contents about process of BTL projects. To achieve these objectives, this study 1)analyzes the major trend about private infrastructure investment, and 2)suggest extended suggestions for minimizing problems in the process of BTL projects in school facilities.

  • PDF

Status, Challenges and Strategic Directions for the ESG Bond Market in Korea (ESG 채권 현황 및 활성화 방안에 관한 연구)

  • Kang, Yun-Sik;Chung, Jay M.
    • Asia-Pacific Journal of Business
    • /
    • v.11 no.1
    • /
    • pp.45-60
    • /
    • 2020
  • Recently, ESG bond issuance has been gradually spreading to banks and non-financial private companies in Korea. However, the Korean ESG bond market is still in its infancy in terms of size, diversity and investor base compared to the global ESG bond market. In other words, ESG bonds are rapidly forming in the global market, but are still in the formation stage in the domestic market, and various policy and practical measures such as system, incentives, and infrastructure are needed to activate them. In this paper, we examine the domestic and international status of ESG bonds in relation to responsible investment. In addition, this paper explores specific measures to revitalize the domestic ESG bond market in four aspects: establishing ESG bond standards, procedures and regulations, increasing ESG bond investment demand, increasing ESG bond issuance, building market infrastructure and market efforts. This study is expected to contribute to the development of the domestic ESG bond market and responsible investment.

A MULTI-OBJECTIVE OPTIMIZATION FOR CAPITAL STRUCTURE IN PRIVATELY-FINANCED INFRASTRUCTURE PROJECTS

  • S.M. Yun;S.H. Han;H. Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.509-519
    • /
    • 2007
  • Private financing is playing an increasing role in public infrastructure construction projects worldwide. However, private investors/operators are exposed to the financial risk of low profitability due to the inaccurate estimation of facility demand, operation income, maintenance costs, etc. From the operator's perspective, a sound and thorough financial feasibility study is required to establish the appropriate capital structure of a project. Operators tend to reduce the equity amount to minimize the level of risk exposure, while creditors persist to raise it, in an attempt to secure a sufficient level of financial involvement from the operators. Therefore, it is important for creditors and operators to reach an agreement for a balanced capital structure that synthetically considers both profitability and repayment capacity. This paper presents an optimal capital structure model for successful private infrastructure investment. This model finds the optimized point where the profitability is balanced with the repayment capacity, with the use of the concept of utility function and multi-objective GA (Generic Algorithm)-based optimization. A case study is presented to show the validity of the model and its verification. The research conclusions provide a proper capital structure for privately-financed infrastructure projects through a proposed multi-objective model.

  • PDF

The Study on the Development of the Technocrat Organization Structures under the PFI Implementation of the Public Educational Facilities (학교시설의 민자공급에 따른 학교시설관련 기술관료조직 제도개선에 관한 연구)

  • Ock, Jong-Ho;Kim, Ha-Yeal
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.6 no.1
    • /
    • pp.25-48
    • /
    • 2007
  • Korean government implemented the Build-Transfer-Lease (BTL) mechanism since 2005 as one of the privatization methods to procure the social infrastructure with private investment. The mechanism was originally prepared 10 provide such public properties as education facilities, child-care facilities, old generation recuperation facilities, medical welfare facilities, military personnel's apartments, environment facilities, and lease apartments. Since 2005, a total of 13.5 trillion won-valued private fund has been directed to the public educational facilities, which occupies 58% of the total private investment in the facilities of the seven categories. However, many officials in the local public entities have anticipated that the local entities need to be restructured or downsized because of the privatization in stead of providing the educational facilities by governmental finance. The main objective of this study is to identify the appropriate technocrat organization structures to manage the privatization procedures.

  • PDF

CASE STUDY OF THE NATIONAL STADIUM: RISKS AND OPPORTUNITIES IN CHINA'S PPP IMPLEMENTATIONS IN MAJOR SPORTS FACILITIES

  • Xinyi Song;Wei Liang;Carlos A. Arboleda;Shouqing Wang;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.474-479
    • /
    • 2011
  • With Beijing's success in bidding for the 2008 Olympic Games, the increasing demand for infrastructure development and reduced public sector funding capacity has created a significant funding gap which calls for alternative project delivery methods such as Public-Private Partnership (PPP). Although the exploration of infrastructure projects using PPP model have been practiced since the late 80s, the $560 million National Stadium which served as the main venue for the Olympic Games is the first stadium project in China to be delivered under PPP operation. The project is generally considered successful despite the concession transfer in 2009 with concern of better serving the public interest. Compared to other infrastructure projects such as transportation, waste management and water management, the development of major sports facilities for mega-sports events with PPP has its own unique features and is subject to different major risks. This research identifies and analyzes critical risks in the implementation of PPP in major sports facility development through case study of the National Stadium project. A questionnaire survey and several interviews are conducted to solicit expert opinions from experienced practitioners. The purpose is to provide additional insights in risk management strategies and opportunities in China's PPP implementations in major sports facilities for policy makers and private sectors involved with investment decisions in future similar infrastructure development.

  • PDF

Information Systems in Project Management of The Public Sphere

  • Mamatova, Tetiana;Chykarenko, Iryna;Chykarenko, Oleksii;Kravtsova, Тetiana;Kravtsov, Olеg
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.8
    • /
    • pp.141-148
    • /
    • 2021
  • Project management is a current trend of management in the public sphere, based on different principles, methods and tools. The tools include information technologies providing control over time, cost, quality and planning process in order to ensure accountability to interested parties. The goal of the research was to examine the impact of the integration of information systems in project management of the public sphere on the quality of public governance and administration using the example of infrastructure projects involving the private sector in developing countries. The methodology of the research is based on the concepts of "digital-era governance" (DEG), "Information governance" and "project governance" to determine the effectiveness of information systems and technologies in the management of infrastructure projects in the public sphere. The data from the countries with Lower middle income (India, Indonesia, Philippines, Ukraine, Vietnam) and Upper middle income (Argentina, Brazil, China, Colombia, Mexico, Peru, Romania, Russian Federation, Thailand, Turkey) for 1996-2020 were used to study the effects of DEG. The results show two main trends in the countries with Lower middle income and Upper middle income. The first trend is the development of digital governance, the concept of "digital-era governance" through information systems and performance measurement of the governance system, forecasting of investment flows of infrastructure projects, measurement of payback and effectiveness parameters for investment management in the public sector, decision support. The second trend is the existence of systemic challenges related to corruption, social and institutional factors through the development of democracy in developing countries and the integration of NPM similar to developed countries. The confidence of interested parties, especially private investors, in public authorities is determined by other factors - the level of return on investment, risks and assignment of responsibility, probability of successful completion of the project. These data still remain limited for a wide range of project participants, including citizens.

Development Scheme of Transport Infrastructure in Poland as the European Union Member by Public Private Partnership

  • Stanislaw Barbuzynski;Kim Soo-Yong;Lee Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.120-127
    • /
    • 2004
  • In May 2004, Poland with nine other Eastern European countries joined the European Union(EU). After accession to the EU, Poland will accelerate the realization of investment in road sector, and wants to achieve important development of its road network condition in year 2005. Polish government is not able to afford the whole investment needed for construction of its motorways, so it wants to develop effective techniques of project funding based on the Public Private Partnerships(PPP). Without having high-performance transport networks, one country's economy cannot be competitive. It was the reason for establishing the Trans European Network(TEN) in the European Union. It creates the links, which are still missing between the fifteen countries of Western Europe and the new member countries like Poland. Consequently, Poland will also need to establish a proper transport infrastructure network. This paper will discuss how the PPP scheme can be applied for the transport infrastructure development in Poland as a EU member.

Development of Business Model for Partnership Support Management (PSM) in Private Infrastructure Projects (민간투자사업 파트너쉽지원관리(PSM) 업무모델 개발)

  • Jung, Pyung Ki;Baek, Hyeon Gi;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.99-109
    • /
    • 2011
  • In order to maintain construction industry and to improve efficiency, the Korean government legislated private investment system. Private sector takes advantages by adopting CM (Construction Management) project system, however, public sector has relatively less capability and experience than private sector. In this paper, PSM (Partnership Support Management) is addressed in order to actively strengthen the project capabilities for public sector. PSM maintains existing CM project system because it is a concept of expended business model of CM. PSM needed to categorize the private participated project into 5 phases; project development phase, project announcement phase, project evaluation phase, project agreement phase and agreement changing phase. PSM business structure and business process considering stakeholder's interrelationship and participation are suggested in this research. Suggested PSM business model may not only increase a comprehensive understanding of government and project capability, but also may reduce work load and responsibilities for project momentum of private participation in infrastructure.

Decision Support Model for Determining Public or Private Highway Investment Projects (고속도로 건설사업의 재정/민자 발주선택 의사결정 지원모델)

  • Yeo, Donghoon;Jeong, Wooyong;Han, Seung Heon;Lee, Young Cheon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.381-389
    • /
    • 2009
  • Korean government is investing 1.8 billion won on infrastructure and investment on PPP projects constitutes 16.3%. This phenomenon is to promote private investment as well as lessening government burdens of public budgeting. However, the only criterion to be considered is government financial status in selecting public or private highway investment projects. So systematic decision support model is required in choosing public or private highway investment projects. So, this paper suggests a systematic decision support model for deciding public or private highway investment at the early stage of project planning. Furthermore, this paper identifies key decision variables with respect to economic, politic, project management criterions based on the related literatures and feedbacks from experts. This paper analyzed 30 cases of government investment and PPP projects and got the survey result from highway specialists. As a result, this paper presents an interval with respect to economic criteria using mean and standard deviation and a logistic regression equation which can predict the possibility of PPP project. Through this study, decision maker of central or local government can decide public or PPP highway project more systematically and reasonably.

Cost-benefit analysis of public investment on aircraft design assurance infrastructure (중형항공기 설계검증·인프라구축과 인증기개발의 경제적 타당성 분석)

  • Yi, Jae-Kyung;Kim, Myeong-Kyun;Kim, Yong-Min;Lee, Tae-Hee;Kim, Do-Hyeon
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.9
    • /
    • pp.900-906
    • /
    • 2010
  • We analyse benefits and costs of investment on the assurance of aircraft design and development of related infrastructure. Although the discounted cash flow from the sales of aircrafts is found to be smaller than the amount of required investment, the net present value considering the effects of export increase, import substitution, and the accident cost reduction is very high. This justifies governmental investment, for the effects are not easily appropriated by private investors.