• Title/Summary/Keyword: Private construction contractor

Search Result 13, Processing Time 0.036 seconds

The Research about Increase and Decrease of the Construction Cost by the Alteration of Design (설계변경에 의한 공사비의 증감에 관한 연구)

  • Im Chil-Soon;Lee Gyu-Chel
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.106-113
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36$\%$) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose tool cost amounts to 2,009,000,000 won (1.37$\%$) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher material cost Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

The Research About Suitability of The Cost of Work According to The Alteration of Design Literature (설계도서 변경에 의한 실 공사비의 책정에 관한 연구)

  • Im, Chil-Soon;Lee, Gyu-Chel
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

CONSULTANTS' NEEDS AND EXPECTATIONS FROM CONTRACTING ORGANIZATIONS IN NORTHERN CYPRUS BUILDING CONSTRUCTION INDUSTRY

  • Mehmedali Egemen;Abdulrezak N. Mohamed
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.986-991
    • /
    • 2005
  • Intense competition existing in construction market creates an industry that is dominated by the client groups. Numerous studies dealing with private clients' needs and expectations from contractor firms exist in the literature. However in the unique construction industry, in addition to clients, consultants as representatives of clients will almost always have very important roles to play as well. By presenting survey findings of 50 consultant firms, this study provides insights into consultants' general needs and expectations from contracting organizations on behalf of their clients by using the data from Northern Cyprus private building construction market.

  • PDF

SOCIAL NETWORK THEORY AND PRIVATE HOUSING DEVELOPERS IN MALAYSIA

  • Muhammad Hijas Sahari;Mastura Jaafar;Abdul Rashid Abdul Aziz
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.704-710
    • /
    • 2007
  • This paper examines the operations of private housing developers (PHDs) based on Social Network Theory. PHDs need to choose the best consultants, contractors and suppliers (CCS) to make sure the project run and complete successfully. PHDs gather the scarce resources from the external environment through personal network. This research used the social network method which relies on alliances based on network, social, tie and trust. The more people/firm PHDs network with, the better chances of finding the right CCS.

  • PDF

The Change in Construction Industry of Korea from the 1920s to the 1930s : Researching Activities of Hanazono Sakichi (하나조노 사키치의 활동을 통해 본 1920-30년대 청부업의 변화)

  • Lee, Soo-Neon;Jeon, Bong-Hee
    • Journal of architectural history
    • /
    • v.29 no.2
    • /
    • pp.7-18
    • /
    • 2020
  • The purpose of this study is to examine the construction industry of Korea from the 1920s to the 1930s by analyzing activities of construction-contractors trying to overcome the recession of the construction industry and intensified competition in the industry. In this paper, I looked at the activities of Hanazono Sakichi as concrete examples. First of all, with the strategy of the vertical integration, by manufacturing and selling building materials, Hanazono Sakichi expanded his company and the scope of contract business. The second, he attempted to diversify related projects. Through related diversification, he seemed to have earned not only land management profit but also advantages from related construction. These aspects were not only seen by Hanazono's activities but also by other contractors'. On the other hand, a few contractors have taken over a trust company to secure the funds for land management. Attempts to maximize personal interests through the expansion and diversification of contractors' business can be seen as overcoming the pre-1920s environment, where almost construct works were ordered under the government, and creating opportunities for the private sector to work and make profit by themselves. In the end, it can be mentioned that 'the contractor' established 'the construction industry' through this process.

A Development of the Risk Factor Dictionary for the Private Finance Construction Project (민간투자 건설사업 위험요인사전 개발)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.152-160
    • /
    • 2007
  • Recently, the government is very active to secure the financial resources by inducement of the private investment in fulfilling an extension of the SOC facilities. One of the reasons that the private investors hesitate to put money into the private finance projects, however, is the lack of knowledges about various risks to be possibly incurred during the project execution. This research was performed as one of the preparation works in order for a A engineering company to act as a prime contractor of the project management service in the private finance project, and finally developed the risk factor dictionary as a new concept to satisfy the requirement of a A company and overcome a limit of the existing risk checklists. Although the risk factor dictionary looks like the only simplified table to be the risk factors identified in three dimensions, the impacts and response strategies expressed in narrative and multi-items, and the responsible parties indicated, it has great meanings to get a lot of direct and indirect accomplishments over the simplified table during the development process.

A Study on the need to strengthen safety and health activities of private construction contractors (건설공사 민간 발주자의 안전보건활동 강화 필요성에 관한 고찰)

  • Keun-Kyu Lee;Min-Je Choi;Guy-Sun Cho
    • Industry Promotion Research
    • /
    • v.9 no.2
    • /
    • pp.69-75
    • /
    • 2024
  • Korea has entered the ranks of advanced countries in terms of economic size and technological competitiveness. However, its industrial accident fatality rate remains among the lowest in OECD countries, and recent incidents such as various building collapses have resulted in numerous deaths of workers or citizens, reminiscent of accidents in developing countries. According to the 2022 Industrial Accident Status Analysis by the Ministry of Employment and Labor, out of the 874 fatalities in work-related accidents in 2022 across all industries, 402 were in the construction industry, accounting for approximately 46% of all fatalities. In particular, the construction industry's fatality rate stands at 1.61, significantly higher than the overall industry fatality rate of 0.43, indicating its severity. Construction ranks highest in terms of fatality rates, with mining at 12.18 and fishing at 1.80. When categorizing construction projects into private and public, private projects show significantly higher figures in terms of contracts, contract amounts, accident numbers, and fatalities compared to public projects. However, unlike public agencies, many private clients lack adequate safety and health activities and lack established safety and health systems. This study aims to raise awareness among private clients about the need to establish safety and health systems and enhance safety and health activities, and to discuss the direction of future development of advanced safety and health practices among private clients.

Construction Claims Prediction and Decision Awareness Framework using Artificial Neural Networks and Backward Optimization

  • Hosny, Ossama A.;Elbarkouky, Mohamed M.G.;Elhakeem, Ahmed
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.11-19
    • /
    • 2015
  • This paper presents optimized artificial neural networks (ANNs) claims prediction and decision awareness framework that guides owner organizations in their pre-bid construction project decisions to minimize claims. The framework is composed of two genetic optimization ANNs models: a Claims Impact Prediction Model (CIPM), and a Decision Awareness Model (DAM). The CIPM is composed of three separate ANNs that predict the cost and time impacts of the possible claims that may arise in a project. The models also predict the expected types of relationship between the owner and the contractor based on their behavioral and technical decisions during the bidding phase of the project. The framework is implemented using actual data from international projects in the Middle East and Egypt (projects owned by either public or private local organizations who hired international prime contractors to deliver the projects). Literature review, interviews with pertinent experts in the Middle East, and lessons learned from several international construction projects in Egypt determined the input decision variables of the CIPM. The ANNs training, which has been implemented in a spreadsheet environment, was optimized using genetic algorithm (GA). Different weights were assigned as variables to the different layers of each ANN and the total square error was used as the objective function to be minimized. Data was collected from thirty-two international construction projects in order to train and test the ANNs of the CIPM, which predicted cost overruns, schedule delays, and relationships between contracting parties. A genetic optimization backward analysis technique was then applied to develop the Decision Awareness Model (DAM). The DAM combined the three artificial neural networks of the CIPM to assist project owners in setting optimum values for their behavioral and technical decision variables. It implements an intelligent user-friendly input interface which helps project owners in visualizing the impact of their decisions on the project's total cost, original duration, and expected owner-contractor relationship. The framework presents a unique and transparent hybrid genetic algorithm-ANNs training and testing method. It has been implemented in a spreadsheet environment using MS Excel$^{(R)}$ and EVOLVERTM V.5.5. It provides projects' owners of a decision-support tool that raises their awareness regarding their pre-bid decisions for a construction project.

Performance Prediction Model for Public-Private Partnership Projects Considering Stakeholders' Profitability (참여자별 수익성을 고려한 민간투자사업 성과예측 모델)

  • Yeo, Dong Hoon;Yu, Giwon;Lee, Kang-Wook;Han, Seung-Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.471-480
    • /
    • 2015
  • The market of public-private partnership (PPP) projects has reduced from 9.4 trillion won in 2007 to 4.5 trillion won in 2012. However, the need of PPP projects is brought up by a massive down scale of government financial business. Previous studies regarding PPP projects mostly evaluate profitability from the financial perspective or analyze risk factors as a whole. Although PPP projects generally have complex structure involving diverse stakeholders, such as contractor, financial investor, and special purpose company (SPC) operators, existing studies have rarely considered the different viewpoints of PPP project stakeholders. Therefore, purpose of this study is to develop a structural equation model (SEM) considering the diverse stakeholders of PPP projects. To this end, the authors first reviewed the organizational structure of PPP projects. Next, the identification of the factors affecting project profitability are done via comprehensive literature reviews. After that, we conducted in-depth interviews and questionnaire surveys to reflect stakeholders' perspectives (contractors, financial investors, and SPC operators). As a result, a SEM model is developed to analyze direct and indirect effect on the PPP project performances. Finally, using the analysis results, relevant implications and directions for improvements are discussed. The prediction of the business performance of contractor, financial investor, and SPC operator is expect to be possible through the model developed and supports the strategy deduction that is appropriate for the participants.