• Title/Summary/Keyword: Priority index

Search Result 332, Processing Time 0.025 seconds

Analysis of Quality Improvement Priority for Construction PMIS

  • An, Hyo-Kyung;Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.10-21
    • /
    • 2012
  • As one of the key IT applications, the project management information system (PMIS) played a significant role in construction management processes in Korea. On increasing use of PMIS, regular quality assessment to identify user's requirements of PMIS is necessary. However, there have been rare research efforts for quality assessment for the construction PMIS. This paper aims to propose a priority index of quality improvement for construction PMIS using the importance and satisfaction measures and to verify the discrimination power of the priority index by comparing it with other quality improvement priority index. In addition, this paper discusses some possible ways of PMIS quality improvement. The analysis of quality improvement priority was based on a questionnaire responded by 253 PMIS users (construction managers and constructors). The methods of PMIS improvement were based on the interviews with eight experts. These findings would be the foundation of further researches on PMIS quality improvement. However, more efforts are required to enhance the priority index, in terms of reflecting weighted values of quality assessment factors.

Determination of Forest Road Construction Priority Order using Concordance Analysis (Concordance Analysis를 이용한 임도개설의 순위결정에 관한 연구)

  • Cha, Du-Song;Kim, Jong-Yoon;Jung, Do-Hyun;Ji, Byoung-Yun
    • Journal of Forest and Environmental Science
    • /
    • v.13 no.1
    • /
    • pp.96-103
    • /
    • 1997
  • By the means of concordance analysis among scoring methods, this study was to determine the priority order of forest road construction in 11 areas. The results have shown that the priority order by concordance index was ranked by area 9, 5, 11, 10, 6, 1, 3=4, 2, 7 and 8, and that by dis-concordance index by area 9, 3, 4, 5, 10, 8, 1, 11, 6, 7 and 2.

  • PDF

Maintenance Priority Index of Overhead Transmission Lines for Reliability Centered Approach

  • Heo, Jae-Haeng;Kim, Mun-Kyeom;Kim, Dam;Lyu, Jae-Kun;Kang, Yong-Cheol;Park, Jong-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.4
    • /
    • pp.1248-1257
    • /
    • 2014
  • Overhead transmission lines are crucial components in power transmission systems. Well-designed maintenance strategy for overhead lines is required for power utilities to minimize operating costs, while improving the reliability of the power system. This paper presents a maintenance priority index (MPI) of overhead lines for a reliability centered approach. Proposed maintenance strategy is composed of a state index and importance indices, taking into account a transmission condition and importance in system reliability, respectively. The state index is used to determine the condition of overhead lines. On the other hand, the proposed importance indices indicate their criticality analysis in transmission system, by using a load effect index (LEI) and failure effect index (FEI). The proposed maintenance method using the MPI has been tested on an IEEE 9-bus system, and a numerical result demonstrates that our strategy is more cost effective than traditional maintenance strategies.

A Novel Investment Priority Decision Method for Facilities of Distribution Systems Considering Reliability of Distribution System (신뢰도를 고려한 배전계통 설비투자 우선순위 결정에 관한 연구)

  • Choi Jung Hwan;Park Chang Ho;Kim Kwang Ho;Jang Sung il;Cho Sung Hyeon
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.545-547
    • /
    • 2004
  • This paper proposes the novel investment priority decision method for distribution facilities considering the potential failure rate and the influence of customer caused by faults in distribution networks. The Proposed method decides the investment priority of the facilities combining, by the fuzzy rules, the KEPCO's priority decision for investment and the priority decision considering SAIFI(System Average Interruption Frequency Index) and SAIDI(System Average Interruption Duration Index). To verify the performance of the proposed method, these works utilized the projects for weak facility reinforcement planned in KEPCO in the Busan region in 2003 and 2004. The evaluation results showed that the reliability of the KEPCO in the Busan region using the proposed method can be enhanced more than using the conventional KEPCO's method.

  • PDF

Development of the Priority Decision System for Redevelopment of Agricultural Reservoir (농업용저수지 재개발 우선순위 산정시스템 개발)

  • Kim, Hae-Do;Kim, Sun-Joo;Kim, Phil-Shik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.2
    • /
    • pp.45-52
    • /
    • 2011
  • This study is to develop a Priority Decision System for Redevelopment (PDSR) which is able to decide the priority for redevelopment of agricultural reservoirs. The major scopes of this research are to make the related GIS data like hydrologic unit map and other thematic maps to determine the suggested priority index (PI), and to develop the PDSR handling the GIS data and calculating weighing factors for the PI. In order to make the weighing factor decision module, the AHP technique was adopted. The result of the weighing factor calculation was showed PC (Possibility Criteria) and RC (Restriction Criteria) were 76% and 24% respectively. Which means that most of the specialist selected PC category prior to RC because of whom to mostly of major technique. So, in order to make more objective result, the selection of specialists is important like environmental activists or local residents and so on. The product from this research can provide more scientific support to decide the priority decision.

An Improved Investment Priority Decision Mettled for the Electrical Facilities Considering the Reliability of Distribution Networks (배전계통 신뢰도를 고려한 전기설비투자 우선순위 결정 기법)

  • Park Chang-Ho;Chae Woo-Kyu;Jang Sung-Il;Kim Kwang-Ho;Kim Jae-Chul;Park Jong-Keun;Choi Jung-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.4
    • /
    • pp.177-184
    • /
    • 2005
  • This paper proposes a improved investment priority decision method of the facilities considering the reliability of distribution networks. The proposed method decides a investment order of the facilities combining, by fuzzy rules, the investment priority decision of KEPCO and the priority decision considering reliability evaluation indices. Where reliability evaluation indices are SAIFI(System Average Interruption Frequency Index) and SAIDI(System Average Interruption Duration Index), as referred to evaluation index for sustained interruption. The reliability analysis method of distribution networks applied in this paper utilizes analytic method, where the used reliability data is historical data of KEPCO. Particularly, we assumed that the failure rate increased as the equipment ages. To verify the performance of the proposed method, we applied it with the planned projects to reinforce the weak facility electrical facilities in KEPCO in 2004. The evaluation result showed that, under a limited budget, the reliability of the KEPCO in the Busan region using the proposed method can be enhanced than using the conventional KEPCO's method. Therefore, the results verify the proposed method can be efficiently used in the actual priorities method for investing the electrical facilities.

Analysis of the major factors of influence on the conditions of the Intensity Modulated Radiation Therapy planning optimization in Head and Neck (두경부 세기견조방사선치료계획 최적화 조건에서 주요 인자들의 영향 분석)

  • Kim, Dae Sup;Lee, Woo Seok;Yoon, In Ha;Back, Geum Mun
    • The Journal of Korean Society for Radiation Therapy
    • /
    • v.26 no.1
    • /
    • pp.11-19
    • /
    • 2014
  • Purpose : To derive the most appropriate factors by considering the effects of the major factors when applied to the optimization algorithm, thereby aiding the effective designing of a ideal treatment plan. Materials and Methods : The eclipse treatment planning system(Eclipse 10.0, Varian, USA) was used in this study. The PBC (Pencil Beam Convolution) algorithm was used for dose calculation, and the DVO (Dose Volume Optimizer 10.0.28) Optimization algorithm was used for intensity modulated radiation therapy. The experimental group consists of patients receiving intensity modulated radiation therapy for the head and neck cancer and dose prescription to two planned target volume was 2.2 Gy and 2.0 Gy simultaneously. Treatment plan was done with inverse dose calculation methods utilizing 6 MV beam and 7 fields. The optimal algorithm parameter of the established plan was selected based on volume dose-priority(Constrain), dose fluence smooth value and the impact of the treatment plan was analyzed according to the variation of each factors. Volume dose-priority determines the reference conditions and the optimization process was carried out under the condition using same ratio, but different absolute values. We evaluated the surrounding normal organs of treatment volume according to the changing conditions of the absolute values of the volume dose-priority. Dose fluence smooth value was applied by simply changing the reference conditions (absolute value) and by changing the related volume dose-priority. The treatment plan was evaluated using Conformal Index, Paddick's Conformal Index, Homogeneity Index and the average dose of each organs. Results : When the volume dose-priority values were directly proportioned by changing the absolute values, the CI values were found to be different. However PCI was $1.299{\pm}0.006$ and HI was $1.095{\pm}0.004$ while D5%/D95% was $1.090{\pm}1.011$. The impact on the prescribed dose were similar. The average dose of parotid gland decreased to 67.4, 50.3, 51.2, 47.1 Gy when the absolute values of the volume dose-priority increased by 40,60,70,90. When the dose smooth strength from each treatment plan was increased, PCI value increased to $1.338{\pm}0.006$. Conclusion : The optimization algorithm was more influenced by the ratio of each condition than the absolute value of volume dose-priority. If the same ratio was maintained, similar treatment plan was established even if the absolute values were different. Volume dose-priority of the treatment volume should be more than 50% of the normal organ volume dose-priority in order to achieve a successful treatment plan. Dose fluence smooth value should increase or decrease proportional to the volume dose-priority. Volume dose-priority is not enough to satisfy the conditions when the absolute value are applied solely.

Study on the Priority Decision for Redevelopment of Agricultural Reservoir (농업용저수지 재개발 우선순위 결정 연구)

  • Kim, Hae-Do;Kim, Sun-Joo;Lee, Kwang-Ya
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.6
    • /
    • pp.63-68
    • /
    • 2009
  • Most of agricultural reservoirs in Korea have no function of flood control except 5% of reservoirs even exposed to natural disaster. In addition, there are increasing needs for the reservoir to guarantee the release of environmental flow to the downstream. Thus, the purpose of this paper is to study the priority decision method for the reservoir redevelopment satisfying both water utilization and flood control. The major scopes of this research are to set up six priority indices and to make needed GIS data for calculating each priority. There is important consideration of obtaining the data or not in deciding the indices. Although the detailed indices is expected to better reflect redevelopment priority but the subjective indices like, 'opinion' and 'landscape' are excluded. From the results, it will enables the six priority indices to really assist in decision redevelopment priority of agricultural reservoirs.

Review of the Priority Index for Selection between Repair and Reinforcement Methods of Dam Facilities (댐 시설물 보수·보강공법 선정을 위한 우선순위지수에 대한 고찰 )

  • Dong Hyun Kim;Hyung Jun Park;Hee Jung Youn;Seung Oh Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.1-11
    • /
    • 2023
  • After the collapse of the Seongsu Bridge in the 1990s in Korea, attention was focused on the maintenance of facilities. The government has established various policies since the enactment of the Act in 1995 until recently. In general, safety inspections are performed to evaluate the safety grade of facilities, and facilities are maintained and managed by performing repairs and reinforcements for defects. However, since the budget is limited, it is impossible to carry out repair and reinforcement projects for all defects. It is necessary to prioritize repair and reinforcement measures. Then, the priority index (PI) is presented considering the importance of members, the seriousness of defects, and economic feasibility. In this index, the degree of influence can be adjusted within the range of 50 to 100% according to the expert's subjective judgment, and the same weight is set for some specific members. Also, the effect through repair and reinforcement is not taken into account decisively, and most of them have a limit in which priority is determined by economic feasibility. Therefore, in this study, through several case studies, problems with the priority index were reviewed and an equation was presented to improve them.

A Design for Efficient Similar Subsequence Search with a Priority Queue and Suffix Tree in Image Sequence Databases (이미지 시퀀스 데이터베이스에서 우선순위 큐와 접미어 트리를 이용한 효율적인 유사 서브시퀀스 검색의 설계)

  • 김인범
    • Journal of the Korea Computer Industry Society
    • /
    • v.4 no.4
    • /
    • pp.613-624
    • /
    • 2003
  • This paper proposes a design for efficient and accurate retrieval of similar image subsequences using the multi-dimensional time warping distance as similarity evaluation tool in image sequence database after building of two indexing structures implemented with priority queue and suffix tree respectively. Receiving query image sequence, at first step, the proposed method searches the candidate set of similar image subsequences in priory queue index structure. If it can not get satisfied results, it retrieves another candidate set in suffix tree index structure at second step. The using of the low-bound distance function can remove the dissimilar subsequence without false dismissals during similarity evaluating process between query image sequence and stored sequences in two index structures.

  • PDF