• Title/Summary/Keyword: Priority Consideration

Search Result 251, Processing Time 0.029 seconds

A Layout Design Algorithm with the Importance Weight and Shape of Department (부서중요도(部署重要度)와 요구형태(要求形態)를 고려(考慮)한 배치(配置) 설계(設計) 알고리즘)

  • Lee, Sang-Seol;Gang, Hui-Jeong
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.232-241
    • /
    • 1993
  • The objective of this study is to develop an algorithm in the consideration of importance Weight and desirable shape of specific department in the computerized layout planning. Quantitative relationship chart between each department was used. It is decided that the priority among the department as to variable factors and the optimum quantitative relationship chart was obtained using by the Weighting method. The algorithm presented in this study could generate more practical layout for the actual design problem.

  • PDF

A Study on Priority Decision Method of Required Capability for North West Islands (서북도서에 대한 요구능력 우선순위 결정방법에 관한 연구)

  • Jang, Dong Mo;Lim, Gye Hwan
    • Convergence Security Journal
    • /
    • v.13 no.5
    • /
    • pp.45-56
    • /
    • 2013
  • In order to prepare against the unpredictable provocation of nK on NWI, instead of the threat based force enhancement, sufficient capability based force planning is required in consideration to enemy capability, operations environment, and technological development. This thesis proposes a method on how to prioritize the required capabilities of NWI during the process of identifying capabilities and investing on the decided acquisition assets. Ambiguity in deciding the priority is eliminated and detailed planning is possible through instituting relationship of organization, operation and capability, and by designating weight based on the above relationship. This method identify the various operations and required capabilities, classify the order of priority clearly for NWI, when compare to other method of priority decision. Although capability based force planning requires more assets and faces limitations due to budget, this method will provide and efficient decision making procedure through precise prioritization.

Determining the priority order of wetland functions (내륙습지 기능의 우선순위 결정)

  • Lee, Seungjun;Choi, Hyun-Ah;Lee, Woo-Kyun;Lee, Jong Yeol;Jeon, Seong Woo;Kim, Joonsoon
    • Journal of Environmental Impact Assessment
    • /
    • v.23 no.3
    • /
    • pp.197-207
    • /
    • 2014
  • In this study, the functional priority of wetlands was determined through analysis of previous research. To determine relative importance, three processes were performed. First, quantitative values from the case studies were normalized. Second, non-quantitative values were prioritized based on standard criteria. Third, equal weight was applied as long as there was no special consideration regarding a particular value's disproportionate priority in the research. Finally, results were grouped into large, medium, and small classes.In this study, the functions of the medium class were found to be the most significant, in the following order of priority: water supply and ground water recharge; culture and recreation; biodiversity; product; water quality control; flood control; erosion control; moderation of climate change; and provision of biochemical matter. To verify these results, we compared our findings with those of an assessment that used the Rapid Assessment Method (RAM) on the same type of study area. Whereas this comparison indicated some correlations by the culture, water storage, and genetic sustainability functions, it suggested a lack of such relationship by the water purification and flood prevention functions.

A Modified-DWRR Cell Scheduling Algorithm improved the QoS of Delay (지연 특성을 개선한 Modified-DWRR 셀 스케쥴링 알고리즘)

  • Gwak, Ji-Yeong;Nam, Ji-Seung
    • The KIPS Transactions:PartC
    • /
    • v.8C no.6
    • /
    • pp.805-814
    • /
    • 2001
  • In this paper, we propose a new scheduling algorithm that guarantees the delay property of real-time traffic, not considered in previous DWRR(Dynamic Weighted Round Robin) algorithm and also transmits non-real-time traffic efficiently. The proposed scheduling algorithm is a variation of DWRR algorithm to guarantee the delay property of real-time traffic by adding cell transmission method based on delay priority. It also uses the threshold to prevent the cell loss of non-real-time traffic due to cell transmission method based on delay priority. Proposed scheduling algorithm may increase some complexity over conventional DWRR scheme because of cell transmission method based on delay priority. However, the consideration of delay priority can minimize cell delay and require less size of temporary buffer. Also, the results of our performance study shows that the proposed scheduling algorithm has better performance than conventional DWRR scheme due to reliable ABR service and congestion avoidance capacity.

  • PDF

A Study of the Priority Order Valuation for Multi-Intermodal Transfer Center (복합환승센터 투자우선순위 평가기법 연구 - 경제성분석과 AHP 분석기법을 중심으로 -)

  • Kim, Hwang Bae;Chang, Kyung Uk;Choi, Jin Hee;Kim, Dong Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.561-567
    • /
    • 2010
  • Recently, several number of Multi-Intermodal Transfer Center are nominated to improve convenience of public transportation user. Due to budget constraints, it should be defined which is the first consideration among the discussed many works. In this circumstance, there are some absurdities in the evaluation of validity of existing methods. Therefore, we suggested the Priority Order Valuation for Multi-Intermodal Transfer Centerer. The evaluation method, we suggested, is considered quantitative analysis and qualitative analysis. In this study, we find out that B/C ratio and construction costs are strongly related to the quantitative analysis so that Multi-Intermodal Transfer Centers in metropolitan area are evaluated the positive results. Therefore, both quantitative analysis and qualitative analysis are applied to the Priority Order, metropolitan area and other area are fairly evaluated the results for the Priority Order.

Deduction of R-PLM technology development consideration (R-PLM 기술 개발 시 고려사항 도출에 관한 연구)

  • Kang, Tae-Wook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.7
    • /
    • pp.4618-4625
    • /
    • 2014
  • The aim of this study was to develop a R-PLM (Railway BIM-based Product Lifecycle Management) technology. The railway engineering productivity can be maximized if the railway product is created using the object modeling method and the railway lifecycle process is managed effectively. Recently, technology known as BIM and PLM was applied to the construction industry to improve the productivity. To define the R-PLM functions, the expert interview and a practitioner interview were conducted to identify the expected outcome and obstacles to R-PLM technology. As a result, the differences between the occupation and the priority of those were derived. Finally, R-PLM technology development consideration was suggested based on the interview results.

The Consideration of Evaluator's Confidence and Risk Attitude in Fuzzy-AHP (퍼지 AHP 적용에 있어서 평가자 신뢰도와 위험인식 성향의 반영)

  • Nam, Ji-Hee;Lee, Young-Gun;Kim, Kwan-Hyun;Choi, Gi-Ryun;Park, Chan-Gook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.1
    • /
    • pp.89-95
    • /
    • 2007
  • In general, reliability of AHP(Analytic Hierarchy Process) depends on pairwise comparison of evaluators. In addition, human judgment on the importance of alternatives or criteria is always imprecise and vague. To cope with these shortcomings, Fuzzy AHP is suggested and used widely recently. But in Fuzzy AHP, it cannot deal with the evaluator's various attitudes towards risk and confidence owing to evaluator's different expertise and experience. This paper proposes a method for consideration of evaluator's confidence and risk attitude in Fuzzy AHP. And suggested methods are applied various scenarios to verify the meaningfulness. The result shows that the priority of alternatives can be change through the consideration of evaluator's confidence and risk attitude.

Profiling and Priority Selection of Foodborne Pathogens in Fresh Produce (국내 신선 농산물 생물학적 위해요소 우선순위 설정)

  • Lee, Chaeyoon;Sung, Dongeun;Oh, Sangsuk
    • Journal of Food Hygiene and Safety
    • /
    • v.27 no.4
    • /
    • pp.356-365
    • /
    • 2012
  • There have been growing concerns among people about food safety due to insufficient information on foodborne pathogens. In this study, we developed a risk priority of 15 foodborne pathogens. For the priority determination we collected risk profile criteria information from CODEX Alimentarius Commission and developed countries. The basis for criteria we selected from information of surveillance were frequency and severity of disease, frequency of consumption and probability of cross-contamination. We also considered foodborne pathogens which have been managed in developed countries though those pathogens are not currently managed appropriately in Korea. Priorities were divided into three groups following these consideration. The first priority group includes Norovirus, pathogenic E. coli, Salmonella spp, Clostridium botulinum and Listeria monocytogenes. The second priority group includes Vibrio parahaemolyticus, Stapylococcus aureus, Campylobacter jejuni and Bacillus cereus, and the third priority group includes Clostridium perfringens, Yersinia enterocolitica, Shigella spp, Cronobacter sakazakii and Hepatitis A virus. Our results could be applied to prevent foodborne illness from fresh produce.

L-RE Coordinates Algorithm for Task Scheduling in Real-time Multiprocessor System (실시간 멀티프로세서 시스템에서의 태스크 스케줄을 위한 L-RE 좌표 알고리즘)

  • Huang, Yue;Kim, Yong-Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.12 no.3
    • /
    • pp.147-153
    • /
    • 2007
  • Task scheduling is an essential part of any computer system for allocating tasks to a processor of the system among various competitors. As we know, in real-time system, the failure of scheduling a hard real-time task my lead to disastrous consequence. Besides efficiency, resource and speed, real-time system has to take time constraint in serious consideration. This paper proposes a priority-driven scheduling algorithm for real-time multiprocessor system. which is called L-RE coordinates algorithm. L-RE coordinates is a new way of describing the task scheduling problem. In the algorithm, we take both deadline and laxity into consideration for allocating the priority. The simulation result shows that the new algorithm is viable and performance better than EDF and LLF algorithm on schedulability and context switch respectively.

  • PDF

Prioritization of Intermodal Transportation Facilities with Considering the Budget Rate Constraints of Focal Terminal Types (교통물류거점유형별 예산비율을 고려한 연계교통시설 투자우선순위 분석)

  • Oh, Seichang;Lee, Jungwoo;Lee, Kyujin;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.361-368
    • /
    • 2010
  • It is general that mostly congested sections of national backbone networks have been improved based on the national network expansion plan. However, in case of intermodal terminals which are origins of logistics, it is still so congested that travel time between origin and destination is long. Therefore, intermodal transportation systems plan of major intermodal terminals for the intermodal connector networks between intermodal terminal and national backbone network or intermodal terminal was established. With the limitation of priority methodology applying to intermodal connector facility under existing methodology, this study suggests an improved priority methodology. This study includes characteristics of terminal on the hierarchical structure and assessment list, but it does not concentrate on the specific terminal type through survey. To avoid a certain concentration, budget constraint for each terminal type was considered ahead of priority. Finally priority methodology was developed with two-step assessment under consideration that specific terminal is not involved in intermodal connector facility project. As a result of calculating weights by survey, effects such as d/c and accessibility fluctuations index through project implementation gain high weight, and degree of region underdevelopment gets next. Although the methodology in this study could not yields the priority by assessment list, it will be useful for setting the direction on policy related to intermodal connector facility projects.