• Title/Summary/Keyword: Preliminary Order

Search Result 1,365, Processing Time 0.027 seconds

Development of a Framework for Estimating the Benefits of IT Projects : Focusing on Preliminary Feasibility Study (정보화 사업의 편익 추정 프레임워크 개발 : 정보화부문 예비타당성조사를 중심으로)

  • Lee, Chunghun
    • Journal of Information Technology Services
    • /
    • v.17 no.3
    • /
    • pp.101-115
    • /
    • 2018
  • In order to promote the IT business efficiently, the Preliminary Feasibility Study has been conducted since 2004. It is to verify the feasibility of a large-scale IT project in advance and to determine whether to reflect the budget. It is more difficult to analyze the benefits of the IT project than other projects, because the IT project is carried out by combining tangible and intangible assets and human resources. For this reason, the Standard Guideline for Preliminary Feasibility Study in the IT field suggests a framework to support in estimating the benefits of the IT project. However, it includes the following problems : 1) level discrepancy among the benefit categories, 2) lack of types of benefit items, 3) no consideration of benefit inducing factors. So the framework is facing a low utilization. This study develops a new framework through a three-step research process. The new framework can be used not only for preliminary feasibility studies but also for estimating the benefits of general IT projects.

A Study on the revised preliminary draft convention on[Int'l] contracts concluded or evidenced by data message (2차 전자계약예비협약초안에 관한 연구)

  • Oh, Se-Chang
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.20
    • /
    • pp.387-421
    • /
    • 2003
  • On the above, a comparison between preliminary draft conventions and comments by the Int'l Chamber of Commerce, contents of preliminary draft convention, problems and alternative are discussed. The conclusions are as follows thereof : The laws of MLEC and MLES made preparation for electronic era of CISG. But electronic circumstances are more changed than the time of regulation of them. Therefore the business world needs a stand-alone convention dealing broadly with the issues of contract formation in electronic commerce. At last, preliminary draft convention delivered a second round. But the base of the instrument was also MLEC and MLES. The revised preliminary draft convention is much amended beyond preliminary draft convention. At its forty-one sessions, the working group reviewed articles 1-11 of the revised preliminary draft convention presented by the secretariat. The remainder was pending until the time of its forty-two sessions. Therefore, on the base of deliberations and decisions of that sessions and them of thirty-six sessions of UNCITRAL, which will be held on comming november, the draft convention which will be prepared by the secretariate, be re-revised preliminary draft convention. According to review of working group on them, preliminary draft convention will officially be draft convention or revise by secretariate. Under these situations, my points of view on draft convention are as follows : As though e-UCP is used carring out side by side with UCP, after e-CISG making in order to adjust CISG to "on" transaction, it is very easy and prompt for business worked to use CISG with e-CISG. This will facilitate ratification of the CISG. For this case, I already presented contents of e-CISG. It is very important for the preliminary draft convention to deal specially with issues related to electronic contracting or to electronic transaction, because according to which way, its contents and scope of application will be different. But the revised draft convention is regretably compromising both them. Consequently, its contents are very confusing and we could not expect its success. If e-CISG will regulate, it is desirable that, if possible, working group has to make the general rule, and the making of useful, practical, affordable rule for electronic commerce, for example Uniform Customs and Practices for Electronic Commerce(e-UEC) in order to solve the specific practical problems, if any, which business currently faces regarding electronic contracting, has to entrust ICC. If working group want to make e-CISG, it is important not to hesitate and take a significant amount of time.

  • PDF

A Study on the Method of Preliminary Works Management for a Schedule Performance Management (공정이행관리를 위한 선행작업관리 시안)

  • Park, Hong-Tae;Song, Young-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.3
    • /
    • pp.757-764
    • /
    • 2008
  • It is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the qualify and schedule management of the construction, We can make systematically preliminary works in accordance with construction schedule by the architecture construction items of the apartment house construction. We suggested important preliminary control item by the workers through experiential method of construction engineers in accordance with network schedule. should not use "we" in technical sentence.

Preliminary Design of Tracking Mount for Movable SLR

  • Park, Cheol-Hoon;Son, Young-Su;Kim, Byung-In
    • Journal of Astronomy and Space Sciences
    • /
    • v.27 no.2
    • /
    • pp.135-144
    • /
    • 2010
  • In this paper, we present the result of preliminary design of tracking mount for ARGO-M which is a movable satellite laser ranging (SLR) system developed by Korea Astronomy and Space Science Institute (KASI). The tracking mount consists of a couple of core parts such as driving motors, encoders and bearings, and the requirements of each parts are determined on the basis of the technical consideration. 2D and 3D models for tracking mount were preliminarily designed using the selected core parts. In order to evaluate the validity of the preliminarily design, the simulator to test the elevation axis was designed and manufactured. The test to check the tracking performance and system accuracy of the simulator was performed, and it was confirmed that the preliminary design meets the operating specifications. Additionally, it was found that the repetitive errors and hysteresis errors need to be improved by the additional control algorithm.

Development of an Advanced Rotorcraft Preliminary Design Framework

  • Lim, Jae-Hoon;Shin, Sang-Joon;Kim, June-Mo
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.10 no.2
    • /
    • pp.134-139
    • /
    • 2009
  • Various modules are generally combined with one another in order to perform rotorcraft preliminary design and its optimization. At the stage of the preliminary design, analysis fidelity is less important than the rapid assessment of a design is. Most of the previous researchers attempted to implement sophisticated applications in order to increase the fidelity of analysis, but the present paper focuses on a rapid assessment while keeping the similar level of fidelity. Each small-sized module will be controlled by an externally-operated global optimization module. Results from each module are automatically handled from one discipline to another which reduces the amount of computational effort and time greatly when compared with manual execution. Automatically handled process decreases computational cycle and time by factor of approximately two. Previous researchers and the rotorcraft industries developed their own integrated analysis for rotorcraft design task, such as HESCOMP, VASCOMP, and RWSIZE. When a specific mission profile is given to these programs, those will estimate the aircraft size, performance, rotor performance, component weight, and other aspects. Such results can become good sources for the supplemental analysis in terms of stability, handling qualities, and cost. If the results do not satisfy the stability criteria or other constraints, additional sizing processes may be used to re-evaluate rotorcraft size based on the result from stability analysis. Trade-off study can be conducted by connecting disciplines, and it is an important advantage in a preliminary design study. In this paper among the existing rotorcraft design programs, an adequate program is selected for a baseline of the design framework, and modularization strategy will be applied and further improvements for each module be pursued.

Study on the Preliminary Teachers' Perception for the Development of Curriculum of the Robot-based Software Education in the Universities of Education (교육대학교 로봇 활용 소프트웨어 교육 과정 개발을 위한 예비 교사의 인식 조사 연구)

  • Jeong, Inkee
    • Journal of The Korean Association of Information Education
    • /
    • v.21 no.3
    • /
    • pp.277-284
    • /
    • 2017
  • Software Education will be implemented at elementary, middle and high schools starting in 2018. The goal of software education is to help students develop Computational thinking skills. Especially, using robots in software education increases student interest and helps to increase creativity. In order for software education using robots to be effective, education for teachers should be effective. The development of effective education contents for preliminary teachers can be said to be the success of software education. By the way, effective education can be said to begin with an accurate analysis of the subjects. In order to develop an effective curriculum for preliminary teachers, it is necessary to grasp the level of preliminary teachers who will carry out the software education using robots. Therefore, in this paper, we surveyed the experiences, levels and perceptions of preliminary teachers to help develop software education curriculum using robots.

Recognition and Preference of Legalized Expansion of Living Space to Balcony (발코니 확장의 합법화에 대한 인식 및 선호)

  • Park, Kyoug-Ok;Lee, Sang-Un
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.97-102
    • /
    • 2006
  • The purpose of this study is to suggest complementary measures to the statute legalizing the expansion of living space to balcony, by means of survey on the recognition and preference of preliminary applicants for new apartments. The survey was done on 130 preliminary applicants who visited 3 model houses opened in Cheongju in June to July, 2006. Conclusions are as follows. (1) Most of preliminary applicants knew that the expansion of living space to balcony were legalized, but were not quite aware of legal details, so that more active publicity is needed by the government. In addition, if the government has a plan to impose tax to expanded space, it has to make clear the definition of the balcony space. (2) Preliminary applicants wanted space expansion of living room, main bed room and children's bed room in order, which implies that constructors have to suggest variety of expansion plans overpassing simple space expansion. (3) Preliminary applicants attached importance on the safety of expanded space. The management office is recommended to have the right to superintend its safety after construction.

  • PDF

The Research on the Preliminary Elementary School Teacher's Instructional Motivation Strategy on Earth Sector (초등예비교사들의 지구분야 수업동기 유발 전략에 대한 연구)

  • Kim, Soon-Shik;Lee, Young-Seob;Nam, Youn-Kyeong
    • Journal of the Korean Society of Earth Science Education
    • /
    • v.4 no.3
    • /
    • pp.258-266
    • /
    • 2011
  • This study was carried out to P University of Education 111 students who participated in science materials study course 1 in spring semester 2011. Students have taken the course pre-service teachers of elementary school classes to target elementary school earth science field, they selected one of the sections to create a class and the students have fulfilled 15-minute classes in respectively from the first week of May 2011 to until end of that course. In this class, colleagues evaluated the classes and we used evaluated scores to determine level of instructional motivation strategy. The obtained results from this study are as follows; First, motivational strategies used by preliminary elementary school teacher were questions, presentation of pictures and photographs, storytelling, presentation of contradictory concepts and phenomena, pilot experiments Second, among preliminary elementary teachers' motivational strategies for teaching in the field of the earth storytelling, presenting contradictory phenomena and concepts, pilot experiment, presentation of contradictory concepts, questions got higher scores in the order. Third, storytelling received the highest scores by the evaluators. So we can consider storytelling as a good strategy for the next class. In particular, storytelling used by animism were more effective. Fourth, preliminary elementary school teachers used life knowledges and dairy experiences as instructional motivation.

Hydraulic Design of Reactor Coolant Pump Considering Head Curve Slope at Design Point (양정곡선 기울기를 고려한 원자로 냉각재 펌프의 수력설계)

  • Yoo, Il-Su;Park, Mu-Ryong;Yoon, Eui-Soo
    • The KSFM Journal of Fluid Machinery
    • /
    • v.14 no.1
    • /
    • pp.18-23
    • /
    • 2011
  • The hydraulic part in reactor coolant pump consists of suction nozzle, impeller, diffuser, and discharge nozzle. Among them, impeller is required to be designed to satisfy performance requirements such as head, NPSHR, and head curve slope at design point. Present study is intended to suggest the preliminary design method sizing the impeller size to satisfy the design requirement particularly including head curve slope at design point. On a basis of preliminary design result, hydraulic components have been designed in detail by CFD and then manufactured in a reduced scale. Experiment in parallel with computational analysis has been executed in order to confirm the hydraulic performance. Comparison results show good agreement with design result, confirming the validity of design method suggested in this study.

Priority Evaluation of Preliminary Cases for IMO Information Management System using Fuzzy TOPSIS and AHP (퍼지 TOPSIS&AHP를 이용한 IMO 정보관리시스템 예비과제 우선순위 평가)

  • Jang, Woon-Jae
    • Journal of Navigation and Port Research
    • /
    • v.37 no.5
    • /
    • pp.493-498
    • /
    • 2013
  • This paper is aimed to priority evaluation of preliminary cases for IMO -IMS(International Maritime Organization- Information Management System) using fuzzy TOPSIS(Technique for Order Performance by Similarity to Ideal Solution) and AHP(Analytic Hierarchy Process). To this solve, therefore, this paper extract 24 preliminary cases and select 4 major preliminary alternative cases after analysing the structure of its alternative cases using FSM(Fuzzy Structure Modeling). Also, the weights of evaluation factors determine using AHP which able to keep the consistency when decision-makers assess. In AHP method, but, the numbers of paired comparison incerase as much as the numbers of the comparison items increase and because this evaluation have the many of vagueness, the decision of final ranking is used to fuzzy TOPSIS method which is included TOPSIS and Fuzzy Set Theory. The result are developed as order as Management of IMO Convention Information, Delivery of IMO Convention Information, Total IMO Database, Knowledge Hub of IMO Convention Information in IMO-IMS.