• 제목/요약/키워드: Preliminary Cost Management

검색결과 106건 처리시간 0.029초

기능분석을 이용한 항공기 설계요구의 할당 및 추적에 관한 연구 (A Study on the Requirements Allocation and Tracking by Implementing Functional Analysis)

  • 이재우
    • 한국군사과학기술학회지
    • /
    • 제2권2호
    • /
    • pp.52-60
    • /
    • 1999
  • By implementing the Systems Engineering process for the aircraft preliminary design, functional analysis study is performed, hence Functional Interface Data Flow(FIDF) and Functional Flow Block Diagram(FFBD) are generated. Based on FIDF and FFBD, allocable and non-allocable design/performance/RM&S requirements are allocated to the appropriate levels. Weight and cost tracking and design margin management methodologies are studied and implemented for the balanced aircraft design.

  • PDF

환경자원의 가치평가 이론과 주요 방법 (Theory and Methods for the Evaluation of Environmental Resources)

  • 김준순
    • Journal of Forest and Environmental Science
    • /
    • 제19권1호
    • /
    • pp.108-123
    • /
    • 2003
  • 1992년 리우회의 이후 국제적으로 환경자원의 중요성이 인식되면서 환경자원에 대한 가치를 정량화하고자 하는 움직임이 본격화 되었다. 우리나라 역시 이러한 국제적인 추세에 영향을 받으면서 1990년초부터 비시장재화의 가치를 평가하고자 하는 연구가 본격적으로 시작되었다. 또한 1999년에 예비타당성조사가 도입되면서 대규모건설사업 수행 전에 환경자원의 가치까지 고려한 비용편익분석이 실제로 이루어지고 있다. 하지만 환경자원에 대한 가치평가 방법이 아직 정립되지 못한 실정이다. 본 연구에서는 환경자원의 가치 평가를 위한 이론과 주요 평가 방법을 소개하였다. 이론에서는 환경자원의 가치를 수요함수와 생산함수차원에서 검토하고 이들 두 함수가 함께 고려된 시장에서 최적 수준을 도출하였다. 평가 방법에서는 시장의 특성에 따라 대표되는 평가 방법인 여행비용법, 만족가격법, 가상가치평가법을 소개하였다.

  • PDF

개인정보보호 관련 공공사업의 타당성 조사를 위한 비용효과분석 사례 연구 (A Case Study on the Cost-Effectiveness Analysis for the Feasibility Study of Public Project Related to Personal Information Protection)

  • 조일형;김진;유진호
    • 지식경영연구
    • /
    • 제20권3호
    • /
    • pp.91-106
    • /
    • 2019
  • In the era of the 4th Industrial Revolution, the importance of information protection is increasing day by day with the advent of the 'hyper-connection society', and related government financial investment is also increasing. The source of the government's fiscal investment projects is taxpayers' money. Therefore, the government needs to evaluate the effectiveness and feasibility of the project by comparing the public benefits created by the financial investment projects with the costs required for it. At present, preliminary feasibility study system which evaluates the feasibility of government financial investment projects in Korea has been implemented since 1994, but most of them have been actively carried out only in some fields such as large SOC projects. In this study, we discuss the feasibility evaluation of public projects for the purpose of information security. we introduce the case study of the personal information protection program of Korean public institutions and propose a cost-effectiveness analysis method that can be applied to the feasibility study of the information protection field. Finally, we presented the feasibility study and criteria applicable in the field of information security.

BIM/GIS 기반 도로 개략공사비 산정 프로토타입 연구 (Roadway Preliminary Cost Estimation Prototype based on BIM and GIS)

  • 박원영;강태경;이유섭
    • 한국건설관리학회논문집
    • /
    • 제14권6호
    • /
    • pp.14-21
    • /
    • 2013
  • 완성된 도면과 시방서를 기초로 산출한 상세한 물량 정보를 토대로 상세 공사비를 예측하는 업무에 비해 도면과 시방서가 완성되기 이전 단계에서 시설제원이나 개략적인 설계 정보 등을 기초로 개략공사비를 예측하는 업무는 공사비 예측 업무 담당자의 주관적인 판단에 의존하는 경향이 크고 객관성이 낮은 실정이다. 본 연구에서는 도로건설공사 초기단계에서의 사업비 예측 모델을 연구하고 이를 토대로 건설공사 개략공사비 예측 시스템을 개발하였다. 이 시스템은 BIM 및 GIS를 이용하여 사업 초기단계 개략적인 노선선정에 따른 개략공사비 추정에 있어 사례기반추론을 기반으로 사업비 예측의 정확성 향상과 업무 선진화에 기여할 것으로 기대된다. 또한 사용자가 인터넷을 통해 편리하게 접근할 수 있고 객관적이면서 일관성 있는 개략공사비 예측 결과를 제공받을 수 있으므로 업무 투명성 측면의 효과도 기대할 수 있을 것이다.

예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구 (Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data)

  • 문준부;윤성민
    • 한국건설관리학회논문집
    • /
    • 제24권1호
    • /
    • pp.3-11
    • /
    • 2023
  • 현재 국내에서는 건설공사 사후평가 제도에 따라 사업 준공 후 공사내용 및 그 효과를 조사하여 프로젝트의 성과를 평가하고 향후 계획된 유사 건설사업의 효율적인 수행을 위한 자료로 활용하고 있다. 그러나 건설사업의 성과를 보다 효과적으로 관리하기 위해서는 프로젝트 진행 과정에서 단계별 성과를 평가하여 그에 따른 유연한 관리전략을 수립할 수 있어야 한다. 따라서 건설사업의 효율적인 성과관리를 위해서는 건설사업 단계별 성과평가체계가 필요하다. 본 연구는 건설사업 초기단계의 성과를 평가할 수 있는 계획단계 벤치마킹을 위한 기초 모델을 제시하고자 한다. 이를 위하여 본 연구에서는 한국개발연구원에서 제공하고 있는 예비타당성 조사 보고서 중 완료된 도로공사 354건에 대해 데이터베이스를 구축하였다. 계획단계 성과를 평가할 성과지표로 시설용량을 기준으로 한 표준공사비와 표준공사기간 지표를 개발하여 도로사업의 계획단계의 성과를 분석할 수 있는 벤치마킹 모델을 제시하였다. 이를 통해 도로사업 계획단계의 표준공사비 및 표준공사기간을 산정하고, 도로사업의 특성별 차이를 분석하였다. 본 연구의 결과를 활용하여 계획단계의 성과와 설계 및 시공단계의 성과를 연계하여 분석한다면 건설사업 생애주기 동안의 성과관리가 가능할 것으로 기대된다.

New Technologies for Sow Nutrition and Management - Review -

  • Sohn, K.S.;Maxwell, C.V.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제12권6호
    • /
    • pp.956-965
    • /
    • 1999
  • Genetic selection and sophisticated management technology have produced modern sows which excel in litter size and milk production. Recent research has identified nutritional innovations which may enhance productivity of the high producing sow. Selected research in three areas which have the potential to enhance reproductive performance are summarized in this report. First, preliminary evidence indicates that organic chromium may enhance litter size and conception rate. Secondly, high producing sows, particularly primiparous sows, required higher protein/lysine in late gestation and or lactation to optimize weaning weight and subsequent litter size. Valine and isoleucine, but not leucine, have been shown to enhance milk production. Phased feeding programs with diet cost partitioned toward gilts and away form parity 3 to 8 sows have been suggested as a means of improving reproductive performance in young sows. Lastly, recent research with sufficient sow numbers to document the effect of dietary fiber on reproductive performance has shown that sows fed fiber farrowed and weaned more pigs.

INCENTIVE/DISINCENTIVE PROJECT SUCCESS FACTORS DURING MACARTHUR MAZE I-580 BRIDGE SPAN REPLACEMENT

  • Jae-Ho Pyeon;Marc Zomoradi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.328-331
    • /
    • 2013
  • Incentive/Disincentive (I/D) contracting experiences in many states have been evaluated in terms of time and cost performance and substantial project time savings were found in many project cases. However, there is little understanding on individual project success factors for I/D projects during construction. This paper explores the significance of I/D clause in the success of the MacArthur Maze reconstruction project and summarizes a list of group causes that explains and elaborates on the detailed factors. The methods used for carrying out this study started with a search of online media and news reports and contract documents were also obtained from Caltrans. After review of the preliminary information, Interviews were performed with the Caltrans Resident Engineer and the contractor's project manager who were in charge of the MacArthur Maze reconstruction. In conclusion, the evaluation of their responses hinted at six significant cause groups responsible for the project's success. These groups can be listed as: 1) Motivation, 2) Policy, 3) Teamwork, 4) Communication, 5) Expectation, and 6) Resource Management.

  • PDF

자궁적출술 환자를 위한 critical pathway 개발과 적용효과 (Critical Pathway Development for the Hysterectomy Patients and its applied Effect)

  • 노기옥;박경숙
    • 여성건강간호학회지
    • /
    • 제6권2호
    • /
    • pp.234-257
    • /
    • 2000
  • At present in the medical care, the study and effort for producing health service to consider efficiency, effectiveness, and quality are urgently called for because of the difficulty in the keen competition according to the inter- nationalization and opening, the operation in the medical institution service testing system, the change in the medical policy of KDRGs, and the lack of the health care cost increasing rate. As an alternative, the case management for the new management system is introduced in the U.S., and the Critical Pathway that is the method designing the contents of activity and its result has been developed and applied in order to anticipate and manage the patient-outcome for the realization of the cost-effective case-management. Thus, this study intended to analyze the effectiveness to obtain by developing the Critical Pathway presented as the method to improve the quality-betterment and cost effectiveness through the continuous and consistent patient management for the hysterectomy patient and applying it to the real practice. As a study method, this author formed a conceptual framework through considering five Critical Pathway used in the current U.S. and three Critical Pathway presented in the literature to develop the Critical Pathway for the hysterectomy patient, and made out the preliminary Critical Pathway through reviewing the old chart. This author made the verified the validity of the expert group about the developed Critical Pathway, and to confirm the possibility of practice application, completed and settled the final Critical Pathway after using the Critical Pathway to the hysterectomy patient from March 1st to 15th, 1997. Finally, to analyze the application-effect of the developed Critical Pathway, this author offered health care service applying the Critical Pathway to the hysterectomy patient from April 15th to August 31th, 1997. The guide for the Critical Pathway was carried out in advance by outpatient setting nurse for outpatient setting visit before the operation, and after hospitalization the primary nurse monitored the execution degree on the every duty. After discharge this author surveyed the complication through phone visiting, and one month after discharge surveyed the patient's reaction about the offered service when outpatient setting visit and analyzed the result. The source for health care cost was obtained by the statistics about the hospital charge which was offered by the General Business Department. The results were as follows. 1. It was decided that the vertical line of the Critical Pathway was made up of eight items such as monitoring/assessment, treatment, line/drains, activity, medication, lab test, diet, patient teaching, and the horizontal line of the Critical Pathway was made up of from hospitalization to discharge. 2. After the analysis of service contents through reviewing the old chart, it was decided that the horizontal line of the preliminary Critical Pathway was made up of from hopitalization to fourth postoperative day, and the vertical line of it was divided into eight items which were the contents to occur with the time frame of the horizontal line. 3. After the verifying the validity of the expert group about the preliminary Critical Pathway, the horizontal line was amended from hopitalization to third postoperative day, and taking their consensus, some contents of the horizontal line was amended and deleted. 4. From March 1st to 15th, 1997, to confirm the clinical suitability, this author offered eight hysterectomy patients the medical service through the Critical Pathway. The result was that three of them could be discharged at the expected discharge day, and the others later than that day. Supplementing the preliminary Critical Pathway through analyzing the cause of that delay- case, this author developed the final Critical Pathway. 5. There were no significant differences between the experimental and the control group in the incidence of complication(P > 0.05). 6. The 92.4% of experimental group was satisfied with the Critical Pathway service. 7. The length of hospital stay of the experimental group offered with the Critical Pathway service was 4.6 days and there was a significant difference that it was 1.3 days shorter than that of the control group(t=-29.514, P=0.000). 8. There wsa a significant difference that the mean medical charge per one patient of the experimental group offered the Critical Pathway service was cheaper \124,150 than that of the control group(t=-9.826, P=0.000). 9. The result that the author assumed and analyzed hospital income with the rate of turning bed was assumed that the increase of hospital income was \63,245,072 for that study, and the income increase was expected with \68,704,864 for a year. The result that this author applied the Critical Pathway to the hysterectomy patient have no differences in the incidence of complication, high satisfaction with that service, and the length of hospital stay decreased in the experimental group, and the mean hospital charge per one patient decreased, but hospital income increased. Suggestions for further study and nursing practice are as follows. 1. The study to apply the Critical Pathway for a year, verify the validity, and measure the effect repeatedly is needed. 2. To apply and manage the Critical Pathway effectively, the study to computerize it is needed. 3. The study to develop hospital-based Critical Pathway about other diseases or procedure, and measure the effect is needed.

  • PDF

국가 연구개발사업의 경제성분석 방법론 고찰 : 가치평가를 중심으로 (A Study on the Methodologies of Economic Analysis for National R&D Program)

  • 임명환
    • Journal of Information Technology Applications and Management
    • /
    • 제21권4_spc호
    • /
    • pp.345-359
    • /
    • 2014
  • Technological, policy and economic factors are both important variables in maximizing the results of a national R&D program and key indicators in evaluating an R&D program's eligibility for financial support. Economic analysis, in particular, is used when selecting R&D programs, setting priorities, and estimating economic effects. This paper examines a series of methodological issues related to the economic analysis of national R&D programs within the framework of the current preliminary feasibility evaluation system, and proposes alternative approaches to each of the issues discussed. The issues include the definition of R&D valuation and establishment of valuation factors; estimation of sales attributable to R&D investment; assessment of the total economic value of R&D as intellectual assets; estimation of R&D benefits and assumption of related to sales; and the application of discount rates based on the weighted average cost of capital. Finally, this study presents directions for future research on analytical procedures and methods of improving the reliability of the results of economic analysis within the national technology planning system.

라멘조 공법의 사업성 검토에 관한 기초연구 (Preliminary study on the Review Project Viability to Rahmen Structure)

  • 이성호;주진규;이군재;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.139-140
    • /
    • 2011
  • The government encourages adoption of Rahmen structure design to ensure efficient management of national resources. However, in comparison with bearing-wall structure, Rahmen structure requires higher unit construction cost and present challenges in terms of securing adequate floor area ratio and floor height. That is why project clients have been disinterested in adoption of Rahmen structure design. Therefore, we have attempted to find factors having influence on decline of project viability for Rahmen structure. This study will be utilized as a basic reference study for promotion of Green Frame design which is a composite PC structure already developed.

  • PDF