• 제목/요약/키워드: Prefabricated

검색결과 473건 처리시간 0.031초

Analysis of underground post-tensioned precast concrete box utility tunnel under normal fault displacement

  • Wu, Xiangguo;Nie, Chenhang;Qiu, Faqiang;Zhang, Xuesen;Hong, Li;Lee, Jong-Sub;Kang, Thomas H.K.
    • Computers and Concrete
    • /
    • 제29권2호
    • /
    • pp.69-79
    • /
    • 2022
  • For long underground box utility tunnels, post-tensioned precast concrete is often used. Between precast tunnel segments, sealed waterproof flexible joints are often specified. Fault displacement can lead to excessive deformation of the joints, which can lead to reduction in waterproofing due to diminished contact pressure between the sealant strip and the tunnel segment. This paper authenticates utilization of a finite element model for a prefabricated tunnel fault-crossing founded on ABAQUS software. In addition, material parameter selection, contact setting and boundary condition are reviewed. Analyzed under normal fault action are: the influence of fault displacement; buried depth; soil friction coefficient, and angle of crossing at the fault plane. In addition, distribution characteristics of the utility tunnel structure for vertical and longitudinal/horizontal relative displacement at segmented interface for the top and bottom slab are analyzed. It is found that the effect of increase in fault displacement on the splice joint deformation is significant, whereas the effects of changes in burial depth, pipe-soil friction coefficient and fault-crossing angle on the overall tunnel and joint deformations were not so significant.

건축공법에 따른 북한의 주거환경 만족도 분석 연구 (Analysis of North Korea's Residential Environment Satisfaction According to Construction Method)

  • 김은영;백정훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.222-223
    • /
    • 2020
  • Recently, as the era of economic cooperation on the Korean Peninsula approaches, the role of the building sector, such as humanitarian reorganization of North Korean housing, is increasing. The purpose of this study is to find out the current location of North Korean housing standards through the North Korean Housing Survey. For the survey, a survey was conducted through 79 North Korean defectors. The main construction methods of North Korean housing are reinforced concrete, steel framed, wooden framed, masonry, and reinforced concrete walled and prefabricated. The residential environment satisfaction items consist of durability, waterproof, heating, ventilation, heat insulation, air tightness, mining, soundproofing, disaster safety, fire safety, and crime prevention. The result is as follows. The housing construction method in North Korea, which lived at that time, consisted of 21 people (30.88%) of reinforced concrete frames, 18 people (26.47%) of wooden frames, 17 people (25%) of masonry walls, 5 people of prefabricated structures (7.35%), and reinforced concrete. Two people (2.94%) were walled. Among these, the wooden frame type had the lowest satisfaction level for each item, and the reinforced concrete had a high level of dissatisfaction in the items of heating, confidentiality, and disaster safety, and the other item had a high level of satisfaction. The masonry wall type has a relatively high satisfaction level in terms of insulation, confidentiality, mining, and disaster safety.

  • PDF

Applying Unit Modular In-Fill Construction Method for High-Rise Buildings

  • Moon, Sangdeok;Kim, Junyoung;Lee, Jaesung;Ock, Jongho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.132-137
    • /
    • 2015
  • A modular construction method includes factory-prefabricated room-sized volumetric units. Although low-rise buildings have been constructed worldwide using this method for more than 30 years, it is a relatively new technology in high-rise construction. There are three basic methods of constructing high-rise buildings using modular construction: the core method, the core-and-podium combination method, and the modular in-fill method. While the first two have been used in the USA and in several European countries, the third method, introduced in 2011 by an international cruise ship development firm, is a rather new approach for which there are few case histories. Therefore, its applicability and construction feasibility should be verified. As a pilot study to test the applicability of the modular in-fill method, a 12-story residential building was built in Korea. This paper describes a case study of the pilot project. The advantages and disadvantages of the method and its applicability in terms of cost effectiveness and construction schedule management were evaluated.

  • PDF

Effect of vertical reinforcement connection level on seismic behavior of precast RC shear walls: Experimental study

  • Yun-Lin Liu;Sushil Kumar;Dong-Hua Wang;Dong Guo
    • Earthquakes and Structures
    • /
    • 제26권6호
    • /
    • pp.449-461
    • /
    • 2024
  • The vertical reinforcement connection between the precast reinforced concrete shear wall and the cast-in-place reinforced concrete member is vital to the performance of shear walls under seismic loading. This paper investigated the structural behavior of three precast reinforced concrete shear walls, with different levels of connection (i.e., full connection, partial connection, and no connection), subjected to quasi-static lateral loading. The specimens were subjected to a constant vertical load, resulting in an axial load ratio of 0.4. The crack pattern, failure modes, load-displacement relationships, ductility, and energy dissipation characteristics are presented and discussed. The resultant seismic performances of the three tested specimens were compared in terms of skeleton curve, load-bearing capacity, stiffness, ductility, energy dissipation capacity, and viscous damping. The seismic performance of the partially connected shear wall was found to be comparable to that of the fully connected shear wall, exhibiting 1.7% and 3.5% higher yield and peak load capacities, 9.2% higher deformability, and similar variation in stiffness, energy dissipation capacity and viscous damping at increasing load levels. In comparison, the seismic performance of the non-connected shear wall was inferior, exhibiting 12.8% and 16.4% lower loads at the yield and peak load stages, 3.6% lower deformability, and significantly lower energy dissipation capacity at lower displacement and lower viscous damping.

미리 제작된 Hydroxylapatite 보형물을(VoCoM$^{\circledR}$) 이용한 제 1 형 갑상성형술 (Type I Thyroplasty Using Prefabricated Hydroxylapatite Implant(VoCoM$^{\circledR}$))

  • 이현종;정한신;백정환;손영익
    • 대한후두음성언어의학회지
    • /
    • 제14권2호
    • /
    • pp.117-122
    • /
    • 2003
  • Background and Objectives : $VoCoM^{\circledR}$ is a commercialized set composed of prefabricated hydroxylapatite implants and shims of various sizes which are specially designed for the type I thyroplasty. Even though a previously published preliminary report showed that $VoCoM^{\circledR}$ is a convenient and safe product for the type I thyroplasty, further investigations or experiences are yet to be reported. Authors aimed to evaluate the efficacy of $VoCoM^{\circledR}$type I thyroplasty, and its advantage and/or disadvantage. Materials and Method : Twenty three consecutive patients with unilateral vocal cord palsy enrolled for the study, who received type I thyroplasty with $VoCoM^{\circledR}$ between July 2001 and June 2003. Acoustic, aerodynamic and stoboscopic analyses were performed prior to surgery and 1 to 3 months after surgery. Speech language pathologists evaluated their voice quality by GRBAS scale, and patients themselves reported subjective changes of their voice by visual analog scale. Results : The average time for the operation was 80 min, which is about 30 min less than other methods. Preoperative jitter was 3.25$\pm$1.65% and improved to 1.94$\pm$1.79% postoperatively (p<0.05). Preoperative shimmer was 9.72$\pm$6.56% and improved to 5.61 $\pm$3.76% (p<0.05), Maximal phonation time increased from 4.41$\pm$2.99 to 7.98$\pm$4.35 sec (p<0.05) The postoperative stroboscopy revealed an effective medialization in 91.3% of the patients. The subjective phonetic improvements were reported in 21 out of 23 patients. GRBAS scale improved from 2.71$\pm$0.46 to 1.47$\pm$1.12(p<0.05). Additional medialization with $Gore-Tex^{\circledR}$ was easily performed in two revision cases. Previously inserted $VoCoM^{\circledR}$ implant was hard to remove because of the tight integration of soft tissues around the implant. Side effects such as extrusion or foreign body reaction are not observed. $VoCoM^{\circledR}$ was relatively expensive and costed more than 10 times of $Gore-Tex^{\circledR}$. Conclusion : Prefabricated hydroxylapatitie implant($VoCoM^{\circledR}$) provides a convenient, safe and efficient way of vocal fold medialization. However it is relatively expensive and hard to remove.

  • PDF

기성품 바 어태치먼트 시스템인 SFI bar를 이용한 피개의치 전악수복 증례 (Full mouth rehabilitation with maxillary implant overdenture using prefabricated bar attachment system: a case report)

  • 신은정;주한성;방몽숙;양홍서;박상원;임현필;윤귀덕
    • 대한치과보철학회지
    • /
    • 제52권4호
    • /
    • pp.331-337
    • /
    • 2014
  • 전통적인 바와 클립 유지형 피개의치의 경우, 인상채득 및 기공과정에서 오차가 생길 수 있어 바가 nonpassive fit하게 제작될 수 있다. 최근에 나온 기성품 바 어태치먼트 시스템인 SFI-Bar (Stress Free on Implant Bar) system (Cendres+Metaux, Biel/Bienne, Switzerland)은 튜브바로 연결하여 조립하는 방식이므로 밀링방식이나 캐스팅방식에서 겪을 수 있는 작업상의 많은 어려움과 긴 작업 시간의 단점을 보완 할 수 있고, 임플란트 주위골에 가해지는 스트레스도 줄여줄 수 있다. 본 증례에서는 골흡수가 심한 상악 무치악 환자에게 최근에 나온 stress free implant bar인 SFI-Bar system을 사용한 피개 의치로 수복하였다. SFI Bar를 이용한 피개의치 제작시 수동적 적합을 얻을 수 있어 임플란트에 스트레스를 덜 가하는 장점을 얻을 수 있을 것으로 생각한다. 추후 정기적인 검사를 통해 장기적인 결과에 대한 평가가 필요하리라 사료된다.

치과 임플란트에서 기성 지대주와 맞춤형 지대주의 응력분석 및 피로파절에 관한 연구 (Stress Analysis and Fatigue Failure of Prefabricated and Customized Abutments of Dental Implants)

  • 김희은;조인호
    • 구강회복응용과학지
    • /
    • 제29권3호
    • /
    • pp.209-223
    • /
    • 2013
  • 하악 제 1대구치에 티타늄과 지르코니아 소재의 기성 지대주와 맞춤형 지대주를 이용해 지르코니아 크라운으로 수복한 경우를 3차원 유한요소법을 통해 응력 분포를 분석해 보고, 피로 파절 강도 및 파절 형태를 고찰해 보았다. 정상교합자의 CT scan을 재구성한 하악골 모형상에 제 1대구치 임플란트 지지 지르코니아 크라운으로 수복한 6가지 유한요소 모형을 제작하고, 협측 교두 중앙에 수직과 30도 각도로 100 N의 하중을 가하는 조건으로 응력분포를 분석하였다. 현재 임상적으로 사용되고 있는 4가지 지대주를 이용하여, 군당 10개의 시편을 제작하고, ISO 14801에 따라 피로파절 실험을 실시하였다. 지대주나 고정체의 재질에 따른 응력분포의 차이는 없었고 형태에 따른 응력크기의 차이만 보였다. 맞춤형 지대주 군이 전반적으로 낮은 크라운 응력을 나타내었으며, 지대주 일체형 지르코니아 임플란트는 계면 골조직의 응력이 가장 낮게 나타났다. 피로수명의 평균값은 7군이 가장 높았고, 1군, 2군, 3군의 순서로 낮게 나타났으며(P<0.05), 기성 지대주 군은 피로수명의 편차가 적게 나타났다. 구치부의 임플란트 수복 시에는 맞춤형 지대주의 사용이 상부 보철물의 파절저항성 향상에 유리하며, 심미적 요구도가 높은 경우에는 고정체와의 접합부를 티타늄으로 제작한 지르코니아 맞춤형 지대주의 사용을 고려해 볼 만 하다.

상악 완전 무치악 환자의 CAD/CAM 을 이용한 임플란트 식립(NobelGuide$^{TM}$) 및 즉시하중 후 고정성 보철수복 증례 (Implant Supported Fixed Restoration for Maxillary Edentulism using CAD/CAM Guided Implant Surgery (NobelGuide$^{TM}$) and Immediate Loading)

  • 허윤혁;이양진;김대곤;조리라;박찬진
    • 구강회복응용과학지
    • /
    • 제28권4호
    • /
    • pp.423-439
    • /
    • 2012
  • NobelGuide$^{TM}$ 임플란트 시스템은 골량과 골질을 수술 전에 판단하여 점막을 젖히지 않고 미리 계획된 스텐트와 보철물을 이용하여 즉시하중을 부여하는 CAD/CAM 기반의 임플란트 보철 치료방법이다. 환자의 불편감을 최소화하여 미리 예측 가능한 위치에 임플란트를 식립함으로써 술 후 합병증 및 보철과정을 간소화 할 수 있는 장점이 있다. 본 증례의 환자는 56세 남성으로 상,하악 부분 무치악 상태였으며, 상악전치부 보철물 탈락과 하악 전치가 흔들린다는 주소로 내원하였다. 이에 상악 잔존치 모두와 하악 4전치 발거 및 치주치료를 실시한 뒤 임시 의치를 6개월간 사용하여 발치와 치유 및 의치 적응여부를 평가하였다. 골량은 충분하다고 판단되었고 환자의 협조도와 경제적인 여건, 전신건강 등 여러 사항이 양호하여 CAD/CAM 기반의 수술템플렛을 이용한 무판막 수술을 통해, 미리 제작된 임시 고정성 보철물로 즉시하중을 부여하는 상악 NobelGuide$^{TM}$ 임플란트 시스템을 계획하였다. 사용중인 임시의치를 이용하여 제작한 방사선 스텐트로 CT를 촬영하고, computer based planning (Procera$^{(R)}$ software)을 통해 3차원적인 골형상과 각 부위별 단면상을 참고하여 상악에 8개의 임플란트 식립체를 생역학적 관점 및 골조건을 고려하여 분산 배치하였다. 미리 제작된 임시 고정성 보철물을 임플란트 수술 후 즉시 장착 및 하중을 부여하여 기능하도록 하였으며 6개월 후 골유착 정도를 평가한 뒤 금속구조물을 이용한 최종 보철물을 제작하였다. 하악의 경우 전치부 도재전장주조금속관과 우측 구치부 임플란트 보철물 제작을 통해 상, 하악 치료를 마무리하였다.

연직배수재를 이용한 폐석회 슬러지의 지반개량 효과 (Soil Improvement Effect of Waste Lime Sludge Using Prefabricated Vertical Drains)

  • 신은철;박정준;김종인
    • 한국지반환경공학회 논문집
    • /
    • 제6권2호
    • /
    • pp.51-60
    • /
    • 2005
  • 최근 우리나라는 석회산업의 부산물인 폐석회의 처리문제로 많은 분쟁이 발생하고 있다. 폐석회는 높은 함수비를 갖고 있어 이를 처리하기 위해서는 적절한 탈수과정이 선행되어야 한다. 본 연구는 연직배수공법을 활용하여 폐석회의 높은 함수비를 저하시키고 지반의 안정화를 촉진시키기 위한 효율적인 방안에 대하여 연구하였다. 즉, 폐석회 슬러지로 구성된 지반내에 기성연직 배수재를 설치하였을때, 압밀도와 간극수압의 소산, 침하량 변화, 지지력 증가를 평가하였다. 실험 결과를 고찰해 보면, PBD가 원형드레인 보다 압밀계수가 2배정도 크게 나타났다. 전반적으로 침하량과 간극수압의 소산, 통수량을 비교하면 두 방법이 서로 유사한 경향을 보이고 있으나, PBD가 원형드레인보다 초기 간극수가 더 효과적으로 배수되는 것을 알 수 있었다. 실내배수실험 후 SEM 촬영에 의한 배수재의 필터 층을 살펴보면, PBD에 비해 원형드레인의 필터가 막힘현상이 심한 것을 알 수 있었다. 폐석회지반의 지반개량효과와 간극수의 배수는 PBD가 우수하며, 원형드레인은 타설간격이 길고 PBD와 같은 섬유배열이 균질한 필터로 교환하여 사용할 때 효율성이 증대할 것이라 예상된다.

  • PDF

기획특집 - 거가대교 침매터널의 설계 (Design of the Busan-Geoje Fixed Links Immersed tunnel)

  • 이정상
    • 기술사
    • /
    • 제43권2호
    • /
    • pp.30-33
    • /
    • 2010
  • Immersed tunnel had been a rather new term in Korea before Busan-Geoje fixed link project was started and became known through the media. Although Korean is unfamiliar with the immersed tunnel, this construction method has a long history in the world. Busan-Geoje Fixed Link immersed tunnel consist of 18 elements and each element is approximately 180m long. These tunnel elements are prefabricated of reinforced concrete in a temporary dry dock and are towed to the site and lowered into final position in a dredged trench and are placed on a screeded gravel bed directly without temporary support.

  • PDF