• Title/Summary/Keyword: Precast deck

Search Result 107, Processing Time 0.026 seconds

Analysis of PSC Box Girder Railway Bridge and Design of its Diaphragm using Sturt-and-Tie Model (PSC 박스 거더 철도교량의 해석 및 스트럿-타이 모델에 의한 격벽부 설계)

  • Song, Ha-Won;Kim, Hyoung-Woon;Kim, Young-Hoon;Byun, Keun-Joo
    • Journal of the Korean Society for Railway
    • /
    • v.1 no.1 s.1
    • /
    • pp.30-39
    • /
    • 1998
  • The functions of diaphragms at abutments and piers of PSC box girder railway bridge are to transfer forces from the superstructure onto bearings or columns and to stiffen the superstructure cross-section against in -plane deformation. Due to stress disturbance at diaphragm, the design for the diaphragm using conventional design method is relatively irrational than those for other structural members. And, due to contribution to boundary condition of deck slab by the diaphragm, the behavior of deck slab near the diaphragm is different from that of the deck slab obtained from two dimensional analysis of the bridge, which is basis for the design of deck slab. In this paper, three dimensional behavior of deck slab near the diaphragm of prestressed concrete (PSC) box girder railway bridge constructed by the precast span method are analyzed by using three dimensional finite element modeling and using the strut-and-tie model design of the diaphragm are presented. The modeling techniques used in this paper can be applied effectively to examine the causes of cracks at deck slab near diaphragm and to design diaphragm rationally.

  • PDF

Static Tests on Transverse Joints of Precast Prestressed Concrete Bridge Deck (프리스트레스를 도입한 프리캐스트 콘크리트 교량바닥판 연결부에 관한 정적 실험)

  • 정철헌;김영진;김성운;박칠림
    • Magazine of the Korea Concrete Institute
    • /
    • v.10 no.2
    • /
    • pp.109-117
    • /
    • 1998
  • 중트럭통행으로 인한 철근콘크리트 교량바닥판의 열화는 교량구조물을 유지보수하는데 있어서 심각한 문제중 하나이며, 프리캐스트 바닥판을 이용한 교량바닥판의 시공 및 교체 방법이 실용적이며, 효과적인 방법으로 인식되고 있다. 본 연구에서는 프리캐스트 바닥판 사이 연결부에 대한 정적실험을 수행하여 실험부재의 탄성영역 및 극한 상태하에서 프리캐스트 바닥판 사이 교축직각 방향 연결부의 강성 및 강도를 평가하였다. 정적실험결과, 무수측 모르나트를 채움재로 사용한 프리캐스트 바닥판 사이 교축방향 연결부는 교축방향으로 적정량의 프리스트레스를 도입함으로서 일반 현장타설 철근콘크리트 바닥판에 비해서 균열에 대한 사용성이 향상되는 것으로 나타났다.

Crack Width Control on Concrete Slab using Half-Depth Precast Panels with Loop Joints (루프이음 반두께 프리캐스트 바닥판을 갖는 콘크리트 바닥판의 균열폭 제어)

  • Kim, Dong Wook;Shim, Chang Su
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.19-29
    • /
    • 2015
  • As the half-depth precast concrete decks are increasingly applied to the construction sites, researches on connection details have been increased. For design of concrete bridge deck with half-depth precast panels, it is required to provide appropriate details of transverse loop joints between panels. In this paper, the structural performance of precast decks was evaluated to investigate continuity of the proposed loop joint details. From the results, the validity of the joints for the continuity of deck was observed in the aspect of flexural strength and crack control. The ultimate strength increased 1.52 times as the reinforcement spacing in the joint was reduced. In terms of crack control, direct crack width calculation for the loop joint showed appropriate results comparing with measured crack width.

Determination Method for Longitudinal Initial Prestress in Composite Beams with Precast Decks I: Simply Supported Beams (프리캐스트 바닥판을 사용한 강합성보의 교축방향 초기 프리스트레스 산정방법 I : 단순보)

  • Cho, Sun-Kyu;Lee, Jong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1A
    • /
    • pp.15-24
    • /
    • 2008
  • This paper presents the analytical method for the long-term behavior of simply supported composite beams with precast decks prestressed in the longitudinal direction. The objectives of time-dependent analysis are to estimate losses of prestress on the concrete slab and long-term deflection due to creep and shrinkage of concrete, relaxation of prestressing steel. Also, the time-dependent analysis was carried out using the presented analytical method to evaluate the effects of several parameters on the long-term behavior of composite bridge with precast deck, including geometrical shapes of composite beams, compressive strength of concrete and magnitude of initial prestress. The results of the analysis indicated that, in the effects of geometrical shapes of composite beams, the main parameters affecting the losses of prestress and the long-term deflection were the cross sectional area and the moment of inertia of steel beam, respectively. Finally, the determination method for the required initial prestress was proposed by evaluation of the loss characteristics due to shrinkage and creep of concrete.

Application of FRP-Concrete Composite Deck to Cable Stayed Bridge (FRP-콘크리트 합성 바닥판의 사장교 적용)

  • Cho, Keun-Hee;Park, Sung-Yong;Kim, Sung-Tae;Kim, Byung-Suk
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.217-220
    • /
    • 2008
  • A modified FRP-concrete composite deck applicable to cable stayed bridge with long girder-to-girder span is proposed, and its design and economical efficiency are presented. The existing FRP-concrete composite deck has low section stiffness due to adoption of GFRP panel with low elastic modulus, which arrives at difficulty in meet of serviceability limit such as deck deflection. So a new-type FRP-concrete composite deck, named precast FRP-concrete deck, is developed by extensioning concrete at the both ends of FRP-concrete composite deck, which brings the effect of reduction of net span length of deck. Compared to the existing FRP-concrete composite deck this modified deck has the advantage of increasing span length but slightly increases self weight. For this type of deck the section optimization is carried out for the cases of simply supported on girder and composite to girder. The optimized deck was applied to cable stayed bridge with a center span length of 540m, and as a result it is verified that PFC deck can be applied efficiently to cable stayed bridge due to reduction of quantity of upper structure.

  • PDF

A method for evaluation of longitudinal joint connections of decked precast concrete girder bridges

  • Smith, Matthew Z.;Li, Yue;Bulleit, William M.
    • Structural Engineering and Mechanics
    • /
    • v.40 no.3
    • /
    • pp.297-313
    • /
    • 2011
  • As bridge conditions in the United States continue to deteriorate, rapid bridge replacement procedures are needed. Decked precast prestressed concrete (DPPC) girders are used for rapid bridge construction because the bridge deck is precast with the girders eliminating the need for a cast-in-place slab. One of the concerns with using DPPC girders as a bridge construction option is the durability of the longitudinal joints between girders. The objectives of this paper were to propose a method to use a spring element modeling procedure for representing welded steel connector assemblies between adjacent girders in DPPC girder bridges, perform a preliminary study of bridge performance under multiple loading scenarios and bridge configurations, and discuss model flexibility for accommodating future field data for model verification. The spring elements have potential to represent the contribution of joint grout materials by altering the spring stiffness.

A Study on Behaviors of Prestressed Bridge Girders Made Continuous (연속화된 Prestress 거더교의 거동연구)

  • 구민세;최인식;김진헌
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2002.10a
    • /
    • pp.396-403
    • /
    • 2002
  • To eliminate deck joints, continuous span bridges are becoming an attractive option. Defferent continuty methods and construction sequences have different time-dependent effects on the behavior of the bridge system. This paper is carried out to evaluate the restraint moments generated at interior span of bridges constructed with full-span prestessed concrete bridge. Especially, effects of creep and shrinkage between ACI209-95 and Eurocode 2 are compared in this paper. Time-dependent effects in prestressed concrete bridges include creep and shrinkage of concrete. Creep due to prestress makes the girders camber up and cause positive restraint moments. The most significant effect of shrinkage in continuous bridges is the differential shrinkage that occurs because of the difference in type and age of girder and deck concrete. Differential shrinkage between the precast girder and the deck typically causes negative res03int moments.

  • PDF