• Title/Summary/Keyword: Pre-support system

Search Result 292, Processing Time 0.027 seconds

Force monitoring of Galfan cables in a long-span cable-truss string-support system based on the magnetic flux method

  • Yuxin Zhang;Xiang Tian;Juwei Xia;Hexin Zhang
    • Structural Monitoring and Maintenance
    • /
    • v.10 no.3
    • /
    • pp.261-281
    • /
    • 2023
  • Magnetic flux sensors are commonly used in monitoring the cable force, but the application of the sensors in large diameter non-closed Galfan cables, as those adopted in Yueqing Gymnasium which is located in Yueqing City, Zhejiang Province, China and is the largest span hybrid space structure in the world, is seldom done in engineering. Based on the construction of Yueqing Gymnasium, this paper studies the cable tension monitoring using the magnetic flux method across two stages, namely, the pre-calibration stage before the cable leaves the rigging factory and the field tension formation stage of the cable system. In the pre-calibration stage in the cable factory, a series of 1:1 full-scale comparative tests were carried out to study the feasibility and relability of this kind of monitoring method, and the influence on the monitoring results of charging and discharging voltage, sensor location, cable diameter and fitting method were also studied. Some meaningful conclusions were obtained. On this basis, the real-time cable tension monitoring system of the structure based on the magnetic flux method is established. During the construction process, the monitoring results of the cables are in good agreement with the data of the on-site pressure gauge.The work of this paper will provide a useful reference for cable force monitoring in the construction process of long-span spatial structures.

Development of the Fuzzy Expert System for the Reinforcement of the Tunnel Construction (터널 시공 중 보강공법 선정용 퍼지 전문가 시스템 개발)

  • 김창용;박치현;배규진;홍성완;오명렬
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.101-108
    • /
    • 2000
  • In this study, an expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The expert system developed in this study have two main parts named pre-module and post-module. Pre-module decides tunnel information imput items based on the tunnel face mapping information which can be easily obtained in-situ site. Then, using fuzzy quantification theory II, fuzzy membership function is composed and tunnel safety level is inferred through this membership function. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river, This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF

The Basic Design on Dispatch Life Support Pre-arrival Instruction Protocol (응급통신소생술 도착전지시 프로토콜 기본설계 방안)

  • Back, Hong-Sok;Kim, Jung-Hyun;Oh, Yong-Gyo;Cho, Hyun
    • The Korean Journal of Emergency Medical Services
    • /
    • v.4 no.1
    • /
    • pp.17-29
    • /
    • 2000
  • As technology advances rapidly, emergency medical dispatching systems must also advance. Optimal emergency medical dispatching requires the courage to practice medicine at dispatch. Modern emergency medical dispatch provides appropriate resource responses with the use of an (Advanced Medical priority Dispatch System(AMPDS) in U.S.A. The AMPDS is a systematic protocol for all aspects of the dispatch process. Based on the AMPDS chief complaint list, we initiated a basic design on pre-arrival instruction protocol and completed the scripted pre-arrival instruction protocol, using Cardiopulmonary resuscitation(CPR) protocol. Implementation of this study creates computerized emergency medical dispatching system for future enhancements, such as the AMPDS.

  • PDF

Efficiency assessment of L-profiles and pipe fore-poling pre-support systems in difficult geological conditions: a case study

  • Elyasi, Ayub;Moradi, Taher;Moharrami, Javad;Parnian, Saeid;Mousazadeh, Akbar;Nasseh, Sepideh
    • Structural Engineering and Mechanics
    • /
    • v.57 no.6
    • /
    • pp.1125-1142
    • /
    • 2016
  • Tunneling is one of the challenging tasks in civil engineering because it involves a variety of decision making and engineering judgment based on knowledge and experience. One of the challenges is to construct tunnels in risky areas under shallow overburden. In order to prevent the collapse of ceilings and walls of a large tunnels, in such conditions, either a sequential excavation method (SEM) or ground reinforcing method, or a combination of both, can be utilized. This research deals with the numerical modeling of L-profiles and pipe fore-poling pre-support systems in the adit tunnel in northwestern Iran. The first part of the adit tunnel has been drilled in alluvial material with very weak geotechnical parameters. Despite applying an SEM in constructing this tunnel, analyzing the results of numerical modeling done using FLAC3D, as well as observations during drilling, indicate the tunnel instability. To improve operational safety and to prevent collapse, pre-support systems, including pipe fore-poling and L-profiles were designed and implemented. The results of the numerical modeling coupled with monitoring during operation, as well as the results of instrumentation, indicate the efficacy of both these methods in tunnel collapse prevention. Moreover, the results of modeling using FLAC3D and SECTION BUILDER suggest a double angle with equal legs ($2L100{\times}100{\times}10mm$) in both box profile and tee array as an alternative section to pipe fore-poling system while neither $L80{\times}80{\times}8mm$ nor $2L80{\times}80{\times}8mm$ can sustain the axial and shear stresses exerted on pipe fore-poling system.

The Study on the Cost Analysis Based on ABC System in Clinical Laboratory (활동기준원가시스템을 이용한 임상병리과 검사 서비스 원가 분석)

  • 전기홍;김보경;안태식;조우현
    • Health Policy and Management
    • /
    • v.8 no.2
    • /
    • pp.88-109
    • /
    • 1998
  • The main purpose of this study is to compare the traditional cost system and ABC(Activity Based Cost) system of clinical laboratory department in a hospital. The study subject was 296 services in clinical laboratory from March, 1997 to August, 1997. In a new costing system, cost for a lab test consist of direct cost element, activity based cost element, and allocated common cost element. In a traditional cost system, cost elements included direct cost element and indirect cost allocated based on test volumes The major findings of this research were as follows. 1. In the application of ABC system, total cost was analyzed as follows. Direct cost was 39.3% of total cost. Activity cost and allocation were 20.9% and 39.8%, respectively. The results of analysis to use traditional cost system were as follows. Direct cost was 39.3% and it was as same as the result of direct cost of ABC system. Indirect cost was 60.7%. 2. Activities of clinical laboratory of subject hospital were registration, pre-test operation, test, test result handling, delivery, culture, post-test operation, technical support, management support, and educational support. 3. The differences of the case of higher number of test case being carried out, the cost of ABC system was lower than the cost of traditional cost system. Otherwise in the case of lower number of test case being carried out, the rests have not been appropriately evaluated, and effective management were needed in clinical laboratory.

  • PDF

Network Operation Support System on Graph Database (그래프데이터베이스 기반 통신망 운영관리 방안)

  • Jung, Sung Jae;Choi, Mi Young;Lee, Hwasik
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.05a
    • /
    • pp.22-24
    • /
    • 2022
  • Recently, Graph Database (GDB) is being used in wide range of industrial fields. GDB is a database system which adopts graph structure for storing the information. GDB handles the information in the form of a graph which consists of vertices and edges. In contrast to the relational database system which requires pre-defined table schema, GDB doesn't need a pre-defined structure for storing data, allowing a very flexible way of thinking about and using the data. With GDB, we can handle a large volume of heavily interconnected data. A network service provider provides its services based on the heavily interconnected communication network facilities. In many cases, their information is hosted in relational database, where it is not easy to process a query that requires recursive graph traversal operation. In this study, we suggest a way to store an example set of interconnected network facilities in GDB, then show how to graph-query them efficiently.

  • PDF

A Study on the Assembly Line Design Tool with a Pre/Post Process (전후 처리 기능을 포함하는 조립라인 설계 방법론)

  • Moon, Byoung-Hoon;Choi, Seong-Hoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.4
    • /
    • pp.98-105
    • /
    • 2014
  • According to a simple survey on the current status of the assembly line design, it was found that trial and error methods on the basis of experiences have been used mainly in domestic manufacturing industries, even though there exist a lot of excellent line balancing studies. It seems that more practical researches should be carried out to develop user-oriented line balancing tools especially for small and medium-sized enterprises. This study presents a design of the line balancing tool which can support the line balancing tasks of nonspecialists. The proposed design tool is composed of three major modules: pre-process, line balancing, and post-process. In particular, pre-process and post-process are newly proposed to increase its ease of use. We applied the proposed design to a test problem and test result showed that our practical method may contribute to enhance the efficiency of production operations management.

A Study on the Performance of Early Adaptation Support Program for People with Mental Illness Living in Independent Housing : Focused on Comparing Housing Types (독립주거 정신장애인의 초기적응지원 프로그램 성과 연구 : 주거형태별 비교를 중심으로)

  • Choi, Hee-Chul;Bae, Eun-Mi
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.1
    • /
    • pp.91-101
    • /
    • 2021
  • The purpose of this study is to understand the performance of the initial adaptation support program for people with mental illness living in independent housing. The group of people with mental illness living in independent housing from T mental rehabilitation facilities in Seoul were assigned to the experimental group, and the other group of people with mental illness in living facilities and group home were assigned to the control group. After that, the degree of community performance between groups was compared with pre-post tests. As a result of the study, the pre-post analysis of the total social support of the experimental group showed significant differences. Also, the results were statistically insignificant in all of the control groups, so the initial adaptation support program was found effective in improving the total social support of the independent housing group. Based on the results of this study, the direction of housing support and establishment of a performance system for housing services for stable settlement of discharged people with mental illness into the community was suggested.

A vision and strategy for developing virtual construction system (가상 건설 시스템 비전과 구축 방향)

  • Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Shin, Hyun-Mock;Lee, Kwang-Myong;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

A phenomenological study on pre-hospital care of 119 EMT (119구급대원의 현장 및 이송 중 응급처치 경험에 대한 현상학적 연구)

  • Hye-ji, Kwon;Young-jeon, Shin
    • The Korean Journal of Emergency Medical Services
    • /
    • v.26 no.3
    • /
    • pp.71-91
    • /
    • 2022
  • Purpose: This study aimed to provide baseline data for implementing advanced life-support for 119EMTs. This is done with an in-depth examination of the emergency care experiences of the 119EMTs on-site and during transportation. Methods: Interviews were conducted with twelve 119EMTs, and the data were analyzed using the phenomenological method. Results: The 34 topics had 19 sub-components and were analyzed according to seven categories: 'A work environment where you cannot focus only on emergency care on-site and during transportation', '119EMTs struggling with manpower shortage', 'Current status of education blocking the upward standardization of 119EMT', 'Implementation of professional emergency care was held back due to the limited legal scope of 119EMT', 'Medical oversight makes it difficult to implement emergency care due to low flexibility', '119EMTs who cannot choose hospital selection and find it difficult to receive help', 'An evaluation system not reflecting reality at all that only leaves high scores'. Conclusion: This study was undertaken to implement specialized emergency care for 119EMTs; not only the necessity of reviewing the expansion of the work scope of 119EMTs but also the necessity of effective 'Medical Oversight system' reorganization raised as well.