• Title/Summary/Keyword: Pre-road

Search Result 198, Processing Time 0.033 seconds

A CRL Distribution Scheme Minimizing the Time for CRL Processing of Vehicles on Vehicular Communications

  • Kim, Hyun-Gon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.23 no.12
    • /
    • pp.73-80
    • /
    • 2018
  • Certification revocation list(CRL) is needed for excluding compromised, faulty, illegitimate vehicle nodes and preventing the use of compromised cryptographic materials in vehicular communications. It should be distributed to vehicles resource-efficiently and CRL computational load of vehicles should not impact on life-critical applications with delay sensitive nature such as the pre-crash sensing that affords under 50msec latency. However, in the existing scheme, when a vehicle receives CRL, the vehicle calculates linkage values from linkage seeds, which results in heavy computational load. This paper proposes, a new CRL distribution scheme is proposed, which minimizes the time for CRL processing of vehicles. In the proposed scheme, the linkage value calculation procedure is performed by road-side unit(RSU) instead of the vehicle, and then the extracted linkage values are relayed to the vehicle transparently. The simulation results show that the proposed scheme reduces the CRL computational load dramatically, which would minimize impact on life-critical applications' operations with low latency.

A Study on the Stability of Embankment Due to the Construction of Embankment Combined Use Road (제방겸용도로 건설에 따른 제방 안정성 해석에 관한 연구)

  • Kim, Sung-Nam;Lee, Young-Woo
    • International Journal of Highway Engineering
    • /
    • v.10 no.3
    • /
    • pp.109-118
    • /
    • 2008
  • This study analyzes the change of stability of embankment due to the construction of embankment combined used road with two different construction phases. The stabilities have been checked both in the phase of earth banking for a road construction and in the phase of the application of the traffic roads(DB-24). In both cases the factor of safety has been found higher than 1.3 which is the general criterion of the safety of an embankment. The results indicate that the safety of an embankment due to the construction of embankment combined use road is assured, and thus, it is thought that the construction of embankment combined use road can be considered for cutting down on expenses of construction sites for a road construction. However, the pre-examination of stability due to the construction should be carried out because it decreases the factor of safety of an embankment. From this study, it has been found that the factor of safety was dropped most when the water level rose in the transient flow. The result indicates that the stability analysis of a river embankment where the water level changes frequently should be carried out in the condition of transient flow. It is recommended that the inner side of an embankment should have a slope of 1:2 which is identical with the slope of the existing embankment. In addition, the factor of safety also can be decreased due to the traffic loads, and therefore, the effect should also be considered after the construction of embankment combined used road limiting the traffic loads.

  • PDF

A Study on the Airbag Crash Recognition Algorithm for Vechcle Impact Modes and Speeds (차량의 충돌 유형 및 속도에 따른 에어백 충돌인식 알고리듬에 관한 연구)

  • 성기안;이창식
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.8 no.6
    • /
    • pp.259-266
    • /
    • 2000
  • Crash test data from different impact modes and threshold speeds were used to assess the effects of impact conditions on air bag electronic single point sensing (ESPS) activation requirements. The requirements are expressed in terms of the desired sensor activation time based on unbelted driver dummy kinematics. A crash discriminator pre-displacement is introduced to crash recognition algorithm to the ESPS. The new crash recognition algorithm named Velocity Energy Pre-displacement(VEPD) method is developed and the ESPS algorithm based on the VEPD technique is used to assess the ESPS system performance. It is shown that VEPD method correlates very well with desired sensor activation time and meets the activation requirement.

  • PDF

A Study on the Methodology for Determining Dynamic Loadings of Automotive Suspension System Using Measurement and Modeling

  • 김호용;이재곤;박용국
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.7 no.8
    • /
    • pp.262-271
    • /
    • 1999
  • To design suspension system and estimate its durability , the loading history of each suspension part exposed to various operation conditions should be known from either measurement or computations. Based on these results, stress analysis is carried out to obtain the optimal shape and to reduce the production cost through the proper selection of manufacturing process. In this paper, first the measurement of 3-directional accelerations of wheel center using an accelerometer are undertaken from a vehicle running on Belgian road. Then the data measured from experiments are pre-processed with filtering . Based on the pre-processed data the methodology for determining the dynamic loading to each suspension part is developed by simply modeling the suspension system with ADAMS software. Eventually , it is expected that dynamic loadings can be used for the dynamic stress and fatigue analyses.

  • PDF

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

Impact on Introduction of the Alien Plants by Road Development Projects (도로개발 사업이 외래식물 유입에 미치는 영향)

  • Chu, Yunsoo;Kim, Jung-Kwon;Lee, Hyohyemi
    • Ecology and Resilient Infrastructure
    • /
    • v.4 no.3
    • /
    • pp.156-168
    • /
    • 2017
  • Linear development such as road and railway construction is considered to be an important factor in the dipersion agent of alien species. The purpose of this study is to investigate the effect of road project implementation on the introduction of alien plants. We selected the roadworks that have been completed or completed by more than 70% of the projects in the Han River basin environment agency. The alien plant data were divided into five phases: pre-construction (P0) and construction (P25, P50, P75, P100) according to the annual process rate. As the construction progresses, the naturalization rate, the urbanization index and the tendency of the number of exotic plants increase. Especially, alien plants were introduced rapidly at the beginning of the construction period, and the introduced species continued to appear until the construction was completed. Therefore, it is necessary to minimize the introduction of ailen plants by concentrating management of embankment process and the vegetation restoration process at the beginning of roadworks.

Estimation of Real-Driving NOx Emission Characteristics from Light-Duty Diesel Vehicles with PEMS (PEMS를 이용한 소형 경유차의 실주행 NOx 배출특성 평가)

  • Park, Yeon Jae;Kwon, Sang Il;Park, Jun Hong;Lee, Jai Young
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.31 no.6
    • /
    • pp.562-572
    • /
    • 2015
  • $NO_x$ emissions from diesel vehicles have been regarded as a main cause of high $NO_2$ concentration in metropolitan area. Recent studies have shown that the on-road $NO_x$ emissions of diesel vehicles are quite higher than the emission limits specified with the pre-defined test method for emission certification. To reduce air pollutants effectively, the discrepancy of emissions in certification and real-driving conditions should be tackled. In this study, the real-driving emissions have been estimated with portable emission measurement system (PEMS). The results of this study have shown that the on-road $NO_x$ emissions from diesel vehicles have been decreased as the introduction of stricter emission regulation, EURO-6, but additional reduction should be still required and robust technologies should be applied to control $NO_x$ in real-driving conditions. RDE-LDV (Real Driving Emission - Light Duty Vehicles) test method being developed in the European Union can represent excessive on-road $NO_x$ emissions of diesel vehicles as applied emission technologies and can be a solution to remove discrepant $NO_x$ emissions between certification and Korean real-driving conditions. Among the $NO_x$ reduction technologies for EURO-6 diesel vehicles, selective catalytic reduction (SCR) system has shown the better performance than lean $NO_x$ trap (LNT) system to control on-road $NO_x$ emissions. Implementing RDE-LDV will require vehicle manufacturers to adopt the more effective $NO_x$ reduction technology in real driving conditions.

A Traffic Equilibrium Model with Area-Based Non Additive Road Pricing Schemes (지역기반의 비가산성 도로통행료 부과에 따른 교통망 균형모형)

  • Jung, Jumlae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.649-654
    • /
    • 2008
  • In the definition of non additive path, the sum of travel costs of links making up the path is not equal to the path cost. There are a variety of cases that non-additivity assumption does not hold in transportation fields. Nonetheless, traffic equilibrium models are generally built up on the fundamental hypothesis of additivity assumption. In this case traffic equilibrium models are only applicable within restrictive conditions of the path cost being linear functions of link cost. Area-wide road pricing is known as an example of realistic transportation situations, which violates such additivity assumption. Because travel fare is charged at the moment of driver's passing by exit gate while identified at entry gate, it may not be added linearly proportional to link costs. This research proposes a novel Wordrop type of traffic equilibrium model in terms of area-wide road pricing schemes. It introduces binary indicator variable for the sake of transforming non-additive path cost to additive. Since conventional shortest path and Frank-Wolfe algorithm can be applied without route enumeration and network representation is not required, it can be recognized more generalized model compared to the pre-proposed approaches. Theoretical proofs and case studies are demonstrated.

The Pre-Evaluation of Stability during Tunnel Excavation using Unconfined Compression Strength of Intact Rock or Rock Mass and Crown Settlement Data (터널천단변위와 암석 또는 암반의 일축압축강도를 이용한 시공 중인 터널의 예비 안정성 평가)

  • Park, Young Hwa;Moon, Hong Duk;Ha, Man Bok
    • International Journal of Highway Engineering
    • /
    • v.17 no.6
    • /
    • pp.27-32
    • /
    • 2015
  • PURPOSES : It is difficult to estimate tunnel stability because of lack of timely information during tunnel excavation. Tunnel deformability refers to the capacity of rock to strain under applied loads or unloads during tunnel excavation. This study was conducted to analyze a methods of pre-evaluation of stability during tunnel construction using the critical strain concept, which is applied to the results of tunnel settlement data and unconfined compression strength of intact rock or rock mass at the tunnel construction site. METHODS : Based on the critical strain concept, the pre-evaluation of stability of a tunnel was performed in the Daegu region, at a tunnel through andesite and granite rock. The critical strain concept is a method of predicting tunnel behavior from tunnel crown settlement data using the critical strain chart that is obtained from the relationship between strain and the unconfined compression strength of intact rock in a laboratory. RESULTS : In a pre-evaluation of stability of a tunnel, only actually measured crown settlement data is plotted on the lower position of the critical strain chart, to be compared with the total displacement of crown settlement, including precedent settlement and displacement data from before the settlement measurement. However, both cases show almost the same tunnel behavior. In an evaluation using rock mass instead of intact rock, the data for the rock mass strength is plotted on the lower portion of the critical strain chart, as a way to compare to the data for intact rock strength. CONCLUSIONS : From the results of the pre-evaluation of stability of the tunnel using the critical strain chart, we reaffirmed that it is possible to promptly evaluate the stability of a tunnel under construction. Moreover, this research shows that a safety evaluation using the actual instrumented crown settlement data with the unconfined compression strength of intact rock, rather than with the unconfined compression strength of a rock mass in the tunnel working face, is more conservative.

How to Improve R&D Pre-Feasibility Study System (연구개발 분야 예비타당성 제도의 개선방향)

  • Choi, Seok-Joon;Kahn, Hyung-Sik
    • Journal of Korea Technology Innovation Society
    • /
    • v.11 no.2
    • /
    • pp.287-313
    • /
    • 2008
  • Even though the pre-feasibility study was introduced in 1998, it mainly has focused on transportation social overhead capital(SOC) such as road and railroad. Last year, however, the government newly launched R&D project area for the pre-feasibility study. This paper tries to analyze the pre-feasibility study methodology and system that applied to R&D facility, cluster, and sized R&D infrastructure projects. In depth study of economic, policy, and AHP analysis, this paper shows that the preliminary feasibility study have some caveats and suggests a way of improvement for making up for limitation. Main suggestions are as follows; First, to improve the fit in R&D sector analysis, using consistent method is important. Second, technology analysis is essential for R&D evaluation. Third, technology experts should take part in AHP analysis.

  • PDF